A round mirror cabinet is a single line item on most schedules, yet it touches the vanity layout, the tiling set-out, the electrical circuit and the joinery finish board. Scheduling it as an isolated purchase is how bathrooms end up with a mirror that does not clear the tapware or a cabinet that arrives after the wall is closed. This article shows procurement teams how to place the Santerson Round Mirror Cabinet inside a whole-project materials schedule, from the first space-planning drawing through to handover.
Why a Small Bathroom Item Needs a Whole-Project Schedule
On villa and hospitality fit-outs, the items that cause the most rework are rarely the largest ones. They are the components whose dimensions depend on decisions made by three different trades. A wall-mounted mirror cabinet sits at exactly that intersection: it hangs off a wall that a tiler finishes, it must clear a basin and tapware chosen by the interior designer, and if it carries an illuminated option it needs a supply point that the electrician has already committed to a circuit.
A whole-project materials schedule solves this by treating every product as a row with dependencies rather than as a standalone purchase order. Each row carries the same fields: the room and wall it belongs to, the specification status, the party responsible for approval, the trade that must complete before installation, and the delivery window. When the round mirror cabinet is entered on the same register as vanity units, basins, shower systems and tiling, conflicts surface at specification stage instead of on site.
SANTERSON works this way as a one-stop furniture and building materials supplier. Because the same team supplies bathroom ceramics, vanities, cabinetry, lighting, wall panelling, flooring and outdoor furniture, mirror cabinets are scheduled alongside the fixtures they physically interact with. That single register removes the coordination burden of reconciling five separate suppliers' dimension sheets.
Where the Round Mirror Cabinet Fits in the Product Range
The round mirror cabinet belongs to the Mirror Cabinets collection, which also covers illuminated and full-height formats. Choosing the right format for each bathroom before the schedule is frozen prevents mid-project substitutions:
| Format | Where it is typically scheduled | Scheduling note |
|---|---|---|
| Round Mirror Cabinet | Principal bathrooms, guest powder rooms and villa guest baths where a soft circular profile is preferred over a rectangular mirror | Made-to-measure sizing, with material and finish options specified per project |
| LED Mirror Cabinet | Ensuite vanities and shared family bathrooms where task lighting at the mirror is part of the lighting design | Lighting and electrical specifications need confirming for each project before the circuit is drawn |
| Tall Mirror Cabinet | Bathrooms with limited wall length but available height, where storage needs to run vertically | Full-height units require floor-to-ceiling clearance confirmation before tiling |
| Standard Mirror Cabinet | Secondary and staff bathrooms where a conventional rectangular profile matches the joinery language | Useful as the default line item, with round and LED formats as designer-selected upgrades |
The round format is specified most often where the design intent calls for curved forms — the same reason curved sofas and arched joinery appear repeatedly in villa projects. Where a project already uses floating vanities with rounded edges, a circular mirror cabinet keeps that geometry consistent without extra detailing work.
Step 1: Fix the Room-by-Room Mirror Register Early
Before any enquiry goes out, produce one register listing every bathroom and powder room in the project, with the mirror format assigned to each. A workable register records:
- Room name and floor level, matching the drawing set so site teams can trace each item
- Mirror format — round, LED, tall or standard — as decided by the designer
- The vanity or basin it pairs with, including whether the unit is wall-hung or countertop-mounted
- Finish reference, taken from the project finish board rather than a generic description
- Storage expectation: toiletries only, linen storage, or both
- Approval owner and the date the specification closes
This register is the document you send with an enquiry. SANTERSON's interior design service supports this stage directly — space layout planning, concept design and mood boards, furniture layouts and 3D visual renderings, and project design coordination covering drawings and production follow-up. For projects without an in-house detailing team, sending room dimensions and a finish direction is enough to receive a specification to review.
Step 2: Treat Sizing as Made-to-Measure, Not Catalogue
The round mirror cabinet page describes made-to-measure sizing together with material and finish options, which means the schedule should carry a dimension per bathroom rather than one blanket size. Three measurements decide the fit:
Clear width of the wall panel
Measure from finished wall face to finished wall face, after tiling and any niche or pilaster. A round unit needs clear horizontal room; a diameter that looks acceptable on an untiled drawing can clash with a recessed niche once the substrate build-up is added.
Vanity height and basin type
A countertop basin raises the tapware spout and therefore reduces the space available below the mirror. Pairing the cabinet with an above-counter vessel basin or an integrated basin changes the bottom edge of the cabinet. Record the chosen basin type in the same row so the two decisions cannot drift apart.
Shower-zone and door swing clearance
In compact bathrooms, an opening cabinet door must not meet a glass door or a shower screen. Confirm the hinge side at specification stage; it is a one-line change on a shop drawing and a costly one after fixing.
Step 3: Sequence the Cabinet Against the Trades
The value of a whole-project schedule is that it shows what has to be finished before an item can go on the wall. For a mirror cabinet the typical sequence runs:
| Stage | What must be resolved | Depends on |
|---|---|---|
| Specification | Format, diameter or height, finish reference, storage layout, hinge side | Vanity and basin selection, finish board |
| First fix | Concealed supply point for an illuminated option; solid fixing substrate or blocking behind the wall lining | Electrical set-out and framing |
| Wet works | Finished wall faces, tile set-out around the mirror centre line, niche positions | Tiling schedule for that room |
| Delivery | Cabinet on site with protective covering, after wet trades have cured and before final fixture installation | Site access and storage plan |
| Installation | Hanging, hardware fitting, door adjustment, connection of any lighting | All of the above |
| Handover | Snag inspection, spare parts record, care instructions | Completion of bathroom fixtures |
Two entries in that table cause most delays. The first is the fixing substrate: a wall lining alone may not carry a cabinet, so blocking needs to be built into framing while the wall is open. The second is the electrical point for an illuminated unit — if a project mixes round cabinets with LED mirror cabinets, mark which rooms require a supply so the electrician's set-out reflects it. Mirror-adjacent lighting such as vanity lighting and wall sconces belongs in the same row, since one circuit decision covers both.
Step 4: Group Bathroom Line Items Into One Package
Scheduling the mirror cabinet inside a bathroom package rather than as an accessory order brings practical gains: one specification review, one production window, one shipment and one installation sequence per room type. A typical villa bathroom package covers:
- Mirror cabinets in the selected format for each room
- Vanity units — single, double, floating or integrated countertop
- Ceramics: wall-hung or floor-standing WCs, basins and bidets
- Shower systems and mixers
- Accessories: towel rails, towel warmers and rails, shelving
- Wall finishes and panelling that the cabinet fixes against
Grouping also simplifies custom work. Where a project requires a non-standard diameter, a specific finish, or matching joinery elsewhere in the building, bespoke material finishes and textures fall under the custom and OEM service, which covers custom furniture design and prototyping alongside OEM manufacturing. The same route handles a full bathroom fit-out — for example integrated countertop vanities detailed to the same finish as the mirror cabinet front.
Step 5: Put Delivery and Installation Windows in the Programme
Mirror cabinets are fragile, heavy and room-critical, so they should arrive when the room can receive them. Freight arrangements covering sea, air and rail movement, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery are part of the logistics service. In the programme, record for each package:
- Packaging standard and labelling by room, so site teams can distribute without opening crates
- A storage location that is dry, level and off the traffic route
- A delivery date placed after tiling and painting are complete for that floor
- The installation crew's sequence, aligned with fixture and hardware fitting
Installation itself sits with on-site fitting, snag inspection and handover under the installation and after-sales service. Confirm for your project which installer arrangement applies locally, what the warranty covers and how spare parts such as hinges, shelving and mirror glass are replenished. These details belong in the schedule's closeout column, not discovered at handover.
A Practical Schedule Template
Copy this structure into your materials register and complete one row per bathroom:
| Field | Example entry |
|---|---|
| Item ID / room | M-CAB-02 · Principal bathroom, level 2 |
| Product and format | Round mirror cabinet, made-to-measure |
| Dimensions to confirm | Diameter after tiling; bottom edge above finished vanity top |
| Finish reference | From project finish board, matched to vanity front |
| Paired items | Floating vanity, vessel basin, mirror-side sconce |
| Trade dependencies | Framing blocking, electrical point, tiling set-out |
| Approval owner / close date | Interior designer · before first-fix set-out |
| Delivery window | After wet trades complete for level 2 |
| Closeout | Snag list, spare hardware, care instructions |
Keeping those nine fields consistent across every bathroom turns a scattered set of product enquiries into one coordinated package, and gives the site team a single document to work from.
Product dimensions, materials, lighting and electrical specifications, hardware, installation requirements, local installer arrangements, warranty terms and delivery scope vary by configuration and project. Confirm each of these against the specification agreed for your project before ordering or setting out on site.