A swim spa fails on site for one of two reasons: the shell does not fit the slab and access route that were drawn, or the power, drainage and structure behind it were never planned. The Outdoor Swim Spa WS-PC07ST-L is a long, narrow hydrotherapy unit in our configurable swim and hydrotherapy range, which makes it a good test case for early coordination. Below is the sequence we follow with architects, builders and procurement teams so that the unit arrives after the slab, not before it.
What WS-PC07ST-L Brings to the Drawing Set
The model is a through-flow layout: one end holds the swim training station for lap swimming against a jet stream, and the other end is a seated hydrotherapy zone with massage jets. It sits in our swimming pools and swim spas category alongside shorter and longer shells, so where a project needs a different length, that is a selection question rather than a redesign.
The figures below are transcribed from the product listing. Treat them as the starting point for your setting-out drawing, and confirm the final shell dimensions against the production drawings issued with your order before any concrete is poured.
| Item shown in the catalogue | Value to carry into coordination |
|---|---|
| Catalogue footprint (length × width × height) | 7490 × 2400 × 1470 mm |
| Total power shown | 6.55 kW |
| Jet total | 6 pcs |
| Filter pump | 1 pc |
| Swim training system | 1 set |
| Control system | 1 set |
| LED lights | 4 |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two cautions on that table. First, the water pump is not listed in the captured specification for this model; it appears in our optional-accessories list along with heat pumps, UV sterilisation, sand filtration, insulation and steps, so it belongs on your equipment schedule as a line item to confirm rather than an assumption. Second, total power of 6.55 kW reflects one configuration. Options added later change the electrical load, and the change arrives too late to fix if the sub-board has already been wired.
Reading the Footprint Against Your Site Plan
A 7490 mm shell in a 2400 mm width is easy to place on a plan and easy to get wrong in reality. Three dimensions decide whether it can be delivered at all.
1. The delivery route, not just the plot
Swim spas of this length are moved as a single shell. Before the position is fixed on plan, walk the route from the kerb to the pad: gate width, side setbacks, the clear span of any pergola or covered walkway it passes under, and whether a crane or long-arm lift is needed over a wall. In tight villas this is where projects lose days.
2. Working clearance around the shell
The 7490 × 2400 mm figure is the shell, not the plant space. Leave room at the equipment end for filter pump and control system access, because a service hatch that ends up behind a fixed screen or planter has to be demolished later. If you intend to clad or partially sink the unit, send us the section drawing early so the cladding line does not block the lid swing or the access panel.
3. Level, load and drainage
A full spa of this size is a heavy point load, and the slab supporting it is structural work in your scope, not ours. Confirm with your engineer that the pad carries the filled weight, that it is cast level to a tolerance your tiler can live with, and that overflow, drainage and any drip loop are drawn before the finish surface is set.
The Services Block: Power, Water, Ozone
The catalogue figure of 6.55 kW is a total for the configuration shown, not an electrical schedule. Hand that number to your electrical contractor together with the confirmed option list and let them size the circuit, protection and sub-board. The items that usually need specifying separately are:
- The supply arrangement for the swim training system and jet pumps, which drive the peak load.
- Whether a heat pump is included in your configuration; heating is an option, and it changes both load and switchgear.
- Location of the control system relative to the shell, so low-voltage and mains runs do not cross wet trades later.
- Ozone sanitisation piping and access, which needs a serviceable position rather than a sealed cavity.
For water, decide early whether the fill and top-up come from a hot or cold draw, where drainage discharges, and how the unit is drained for maintenance. These are small drawings, but they belong to the trades that mobilise first.
Options and Accessories: Confirm Before Order, Not at Handover
The accessories listed in our catalogue for this range — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — are not universally fitted, and availability varies by model. A project that specifies an automatic cover, for example, has to allow for the cover's stack height and clear swing on the setting-out drawing; a project that adds insulation changes the envelope where it is cladded. We would rather see your option list at quotation stage than as a variation after production starts.
Rule of thumb: every item you add to the specification changes something a trade has already drawn — load, height, clearance or drainage. Fix the option list before the equipment schedule is issued for construction.
Coordinating the Spa with the Rest of the Outdoor Package
A swim spa is rarely bought alone. In villa and hospitality projects we usually specify it alongside outdoor furniture for the surrounding deck: loungers, a shaded dining position, or a motorized louvered aluminium pergola with integrated LED strip lighting and zip screens over the adjacent lounge. That combination matters for coordination, because a pergola column that lands on the spa's access side, or a louvre roof whose rainwater discharge runs toward the plant compartment, creates problems that no one notices until site works start.
When furniture, shading and the spa come from one supplier, they arrive on one drawing set with one production schedule and one container. That removes the most common coordination failure on outdoor projects: three suppliers each correct on their own drawings, and none of them responsible for the gap between them.
A Coordination Checklist You Can Hand to the Team
- Shell position set out on plan with clearance at the equipment end and at the swim station.
- Delivery route surveyed: gate width, overhead clearance, lifting method.
- Slab design confirmed by your engineer for the filled weight, cast level to finish tolerance.
- Final option list fixed — pumps, heating, ozone, cover, insulation, steps.
- Electrical load confirmed against the final configuration and routed to a named sub-board.
- Fill, overflow and drainage drawn before finishes.
- Lid swing, service hatch and access panel kept clear of fixed cladding and joinery.
- Pergola, lounger and dining positions coordinated with the spa envelope, not after it.
- Production drawings from us cross-checked against your construction issue before the pad is poured.
Send Us the Drawing Set
The fastest way to lock this model into a project is to send the landscape or architectural plan, the section through the intended pad, and your option list. We will confirm which configuration of WS-PC07ST-L fits that envelope, flag anything in the shell dimensions that clashes with your cladding or shading design, and issue production drawings your builder can set out from. If the 7490 mm length does not suit the site, we will show you the shorter shells in the same range instead of forcing the fit.
Dimensions, jet counts, lighting counts and power shown above are transcribed from the product listing for this model. Confirm them against the production documentation issued with your order; final figures depend on the configuration selected.