A combination modular wardrobe is not something you can price from a catalogue page. Because the units are built to project dimensions and mixed across layouts, the quotation depends entirely on what you send us. Below is the exact information that lets our team return a workable quote for Combination Modular Wardrobes, and how the enquiry moves through design, production and delivery.

What "Combination Modular" Means for Your Quote

Our modular wardrobe collection is made up of modules that can be mixed within one run: hanging sections, drawer-focused sections, shelf-focused sections, open units and glass-fronted units. A combination wardrobe takes two or more of these into a single wall of cabinetry, so the price follows the module mix rather than a fixed width.

Every unit in the collection is made to measure, with material and finish options and a layout tailored to the space. That is why we quote from drawings and a specification list instead of a standard size chart. If you are still deciding between configurations, these pages show how the individual modules look and read in a room:

Before You Write: Two Decisions to Settle

The fastest quotes come from buyers who already know two things. First, the role of the wardrobe: a single apartment bedroom, a villa dressing room, or a repeated unit across several rooms in a development. Repeat quantities change both the module mix and how we package and ship. Second, the door style, because hinged, sliding, open and glazed fronts use different hardware and different clearances around the unit.

If your project groups wardrobes with other built-in work — kitchen cabinetry, vanities, wall panelling or doors — send those together. We supply furniture and building materials as one package under our Turnkey Interior Project Solutions, so a combined enquiry usually means fewer shipments and one coordinated production schedule.

The Information We Need in Your Enquiry

Send the items in this table and we can price the job without a second round of questions. Missing dimensions are the single most common cause of delay.

ItemWhat to includeWhy it matters
Room dimensionsOverall width, height and depth of the wall; ceiling height; position of skirting, cornices, beams, radiators and air-conditioning ducts.Sets the module heights and whether scribes or top panels are needed.
Floor and wall conditionFloor finish already laid or still to come; wall material; how level and square the surfaces run.Determines the scribing allowance and fixing method on site.
Module mixHow many hanging, drawer, shelf and open or glazed sections you want, and in what order along the wall.Drives the unit count, hardware quantity and total price.
Door style and frontsHinged, sliding, open, or glass (clear, frosted, bronze, smoked); handle or handleless.Hardware, clearances and lead time all differ by front type.
Body and finishPanel material, edge treatment, colour or wood grain, gloss or matte. Send a RAL code, a sample reference or a photo of an existing finish to match.Mixed finishes within one run need separate production batches.
Interior fittingsExtra rails, trouser racks, pull-out baskets, lighting inside the carcass, mirror panels, soft-close specification.Accessories are quoted per unit and must be listed before cutting.
Quantities and roomsNumber of wardrobes, and whether identical or room-by-room variations.Affects batch planning, packaging and container loading.
Drawings or photosCAD or a hand-measured sketch with dimensions marked; site photos of the wall; inspiration images for the look you want.Lets our designers check clearances before we quote.
Delivery detailsDestination city and port, delivery address, preferred Incoterms, target on-site date.Sets freight mode, packaging spec and production schedule backwards from your date.

If You Have No Drawings Yet

Send the room measurements and photos anyway. Our Interior Design Services team handles space layout planning, furniture layouts and 3D visual renderings, so we can develop the elevation with you before pricing is fixed.

If You Are Ordering Under Your Own Brand

For developers, contractors and retailers buying under their own label, our Custom & OEM Service covers bespoke finishes and textures, prototyping, flexible minimum order quantities and branding such as engraving or logo marking. State clearly in the enquiry that you need OEM work, and include your brand's finish standard and target quantity.

How the Quote Comes Back to You

Our cooperation steps run in a fixed order, and each one has a clear output:

  1. Brief and proposal. We review your measurements and module mix, then propose an elevation with the layout we think suits the space. Where a specification is unclear, we ask before quoting rather than guessing.
  2. Quotation and detail confirmation. You receive pricing against the confirmed drawing, with the panel material, finish code, hardware list and accessories itemised so you can compare it fairly against other suppliers. Nothing is cut until you sign off the details.
  3. Production, shipment and follow-up. Once the order is confirmed we manufacture to the approved specification, then arrange freight under our Logistics & Door-to-Door Delivery service — sea, air or rail freight forwarding, customs paperwork such as commercial invoices and packing lists, packaging and container loading, and shipment tracking.
A note on what we will not promise in a quote. Import duties, local building requirements and site preparation are the buyer's side of the job. We confirm freight terms and documentation with you case by case rather than quoting them as fixed figures, and your final specification is confirmed in writing before production starts.

On Arrival: Installation and Support

Modular cabinetry only performs well if the modules are levelled and fixed correctly against the actual wall. Our Installation & After-sales Support covers on-site installation, inspection and snag lists, plus spare parts and replacement for hardware. Tell us in the enquiry whether you need installation support at the destination or whether your own trades will fit the units — that changes what we include in the packing list and the fixing kit.

A Worked Example of a Clear Enquiry

A usable enquiry reads roughly like this: "Two wardrobes for a three-bedroom villa, master bedroom and second bedroom. Master wall 3.2 m wide by 2.7 m high, 600 mm deep, ceiling already plastered, floor tiles laid. Mix wanted: four hanging sections, one drawer bank of six drawers in the centre, two shelf sections at the top, one open niche for display. Fronts hinged, matte lacquer, handleless, colour to match sample photo attached. Interior LED on two sections. Second wardrobe 2.1 m wide, same finish, sliding fronts. Delivery to Melbourne, CIF preferred, target on site in the second quarter. Drawings and site photos attached."

That single message contains every line of the table above. A quote can be built against it directly.

Send Your Enquiry

Open the Combination Modular Wardrobes product page for reference images, then send your measurements and module list through our Furniture Supplier for Australian Projects service page or the contact form on this site. Include the destination city and your target on-site date, and we will confirm the specification with you before production.

Working on a villa or apartment package and need wardrobes alongside kitchens, vanities and doors? Send the full room list and we will quote it as one coordinated order.