A swim spa is bought on paper before it is bought on site. The quotation you receive, the slab your builder pours and the electrical circuit your electrician pulls all follow from one document: the product specification. This guide uses Outdoor Swim Spa WS-PC04CH to show buyers, specifiers and project managers how to write a specification that leaves nothing for the factory and the site team to guess about.

What a product specification has to do

For a villa pool deck or a resort wellness area, the specification carries three jobs at once. It fixes what you are paying for, so two quotations can be compared line by line. It feeds the other trades — structure, waterproofing, power, drainage, paving — with the dimensions and loads they need before production starts. And it becomes the acceptance document at handover, so a snag list can point at a written requirement instead of an expectation someone remembered from a meeting.

A specification that only states a model number does none of this. The model is the starting point; the value comes from the rows underneath it.

Section 1: Identify the unit and the range

Name the model exactly as the supplier lists it, together with the category it sits in. WS-PC04CH is part of our configurable outdoor swim and hydrotherapy range within Swimming Pools and Swim Spas. Naming the range matters commercially: it tells the factory that alternative sizes, cabinet finishes and equipment packages from the same series are acceptable substitutions only if you approve them in writing.

Write the model number once at the top and repeat it on every drawing, packing list and invoice that follows. Mixed references — "the 4.5 m spa", "the PC04", "unit 3" — are where project records stop matching physical deliveries.

Section 2: Fix the shell dimensions you build around

The catalog dimension for WS-PC04CH is 4500 × 3000 × 900 mm. Put those three numbers into the specification as the envelope your site works to, and state clearly which faces they describe — outer shell length, width and depth.

Then add the allowances your own project needs, and mark them as project additions rather than factory figures:

  • Clearance for access and maintenance — how much space is left around the shell for the pump, filter and control areas, and for anyone who later has to reach them.
  • Rim and coping build-up — the thickness of the paving or decking that will sit against the shell edge, so the finished opening does not crowd the water line.
  • Access route to the position — gate width, turning space and whether a crane or lift is needed, checked against the delivery method you have planned.

Depth of 900 mm also drives seat height, entry steps and how children or older users get in and out. Decide those details at specification stage, not on site.

Section 3: Count the equipment, do not describe it

Marketing copy describes a swim spa as "fully equipped". A specification has to count it. The catalog figures for WS-PC04CH are the baseline you write down and then confirm item by item with the factory:

ItemCatalog figure for WS-PC04CHWhat to confirm before order confirmation
Jet total46 pcsLayout of jets across the seating and therapy zones, and which zone each jet serves
Water pump1 pcDuty of the pump against the jet layout you have selected
Filter pump1 pcFiltration cycle and how the pump is scheduled to run
Control system1 setWhat the control set operates, where it is mounted and how it is reached from the deck
LED lights1 pcPosition of the fitting in the shell
Total power2.45 kWVoltage, phase and circuit protection required at the supply terminals
Features shownWater jets, LED lighting, OzoneWhether ozone is the water-treatment route chosen for this project
Treat every figure above as a catalog value to be re-confirmed in writing for the exact configuration you order. Where our product page and a quotation differ, the confirmed quotation governs — never let two versions of a number live in one project file.

Section 4: Separate what is included from what is optional

Catalog-listed options for this series include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a decision recorded against your project, not a tick on a generic list.

For each option line, write one of three answers: included, selected as an add-on, or excluded and handled by others on site. A heat pump is the clearest example — it changes the electrical load, so it cannot be decided after the circuit has been sized. Insulation changes how the shell behaves in a cold climate and how the surrounding build-up is detailed. Steps change the deck level. Sand filtration versus cartridge filtration changes where plant space has to be.

Section 5: State what the specification does not cover

Half of the disputes on a pool deck project come from silence. Write the boundary explicitly:

  • Site preparation, slab, waterproofing, drainage and paving — who designs and who builds them.
  • Electrical work up to the supply terminals of the spa, including the local electrician's scope and any permit applications.
  • Water supply connection, first fill and any local requirements for backflow prevention.
  • Local code, permit and inspection duties, which sit with the project team in the destination country.

We manufacture and ship to site under Logistics & Door-to-Door Delivery, covering freight forwarding, packaging and container loading, customs paperwork and tracking. Confirm the Incoterms, duties and delivery point for your destination in writing on each order — a landed price that stops at the port is not comparable with one that reaches the villa gate.

Section 6: Add the coordination clauses for project buyers

For hotels, resorts and multi-villa developments, add four clauses to the specification body:

  • Approval samples and drawings — which documents must be signed before production begins, and by whom.
  • Batch consistency — where several units of the same model are ordered, how shell colour, jet layout and control set are held consistent across the batch.
  • Site readiness date — the date your site can receive the unit, matched to the production and shipping plan rather than assumed.
  • Handover record — commissioning checks, spares handed over, and what falls under Installation & After-sales Support.

A worked example: reading one specification line properly

Take the power row. "Total power 2.45 kW" is a catalog figure, and on its own it is not enough for an electrician. Read as a specification line it should read: total connected load for the selected configuration, to be confirmed against the final jet and heating selection; supply voltage and phase to match the destination country's network; circuit protection and cable sizing by the local contractor to their code. Written that way, one number does three jobs — it prices the spa, sizes the circuit and protects you at handover.

Before you send the enquiry

Send the specification with four attachments and you will normally get a comparable, complete quotation back on the first pass: the model reference and range; the dimension envelope with your site clearances marked; the equipment table with each option marked included, add-on or excluded; and the list of works you are reserving to other trades.

If your project also needs poolside furniture, sun loungers, pergolas or changing-area fit-out, specify them in the same package under Outdoor Furniture for Villas and Resorts, so one production and shipping plan covers the whole outdoor area instead of three separate ones.

Send us your draft specification. Our team will mark up the equipment list, confirm the configuration against the selected options and return a quotation you can compare line by line with any other offer.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com