A glass walk-in wardrobe looks decisive on a rendering and difficult to judge on paper. By the time a commercial proposal arrives — for a serviced-apartment tower, a villa compound, a boutique hotel floor or a show-flat package — the difference between two quotes often sits in details that are easy to skim past. The checklist below follows the order in which those details actually appear in a quotation, from the schedule of works through to handover.
1. What the proposal is actually pricing
Before comparing prices, confirm that both suppliers are quoting the same object. Walk-in wardrobes are made-to-measure work: layout, dimensions and finish are specified per space, so a low total usually means something has been left out rather than something has been improved. A usable proposal states, room by room and unit by unit, what is included and what is excluded.
- A dimensioned layout for each wardrobe, not one representative elevation reused across every room type
- Which walls, ceiling heights and floor conditions the design was set out against
- What is inside the carcass: hanging rails, shelving, drawers, lighting provisions, accessories
- What is outside it: skirting returns, architraves, cornices, scribes, packers, fixing to the substrate
- Explicit exclusions — on-site preparation, electrical connection, making good, and any trades the client must supply
2. Glass specification: read it line by line
"Glass" in a wardrobe quotation can cover several very different products at very different prices. Ask each proposal to name the glass type, the thickness, the tint or surface treatment and the frame system holding it. In our range, for example, Glass Walk in Wardrobes sit within a walk-in collection where finish, layout and dimensions are specified to suit each space and project, so the specification line — not the collection name — is what determines cost and performance.
- Tint and transparency: clear, bronze, smoked and frosted glass behave differently in a small room. Clear glass opens a space up but shows everything inside it; frosted and smoked surfaces conceal contents while still passing light. Decide which behaviour the design brief actually calls for before choosing.
- Framing: an aluminium-framed glass door is a different build from a glass door with minimal visible edge framing. Frame profile, colour and finish should be listed, since they drive both price and how the joinery reads against adjacent wall finishes.
- Hardware on glass: hinges, handles, channels and any integrated lighting provision should appear as separate line items with make and model where possible.
- Finish samples: request physical samples of glass, frame profile and carcass board before signing off. Photographs shift tint; a bronze that reads warm on screen can read flat against a pale stone floor.
3. Layout: does the plan match how the space will be used?
A glass walk-in is judged in use, not in elevation. Walk the layout with the operator's programme in mind — guest turnover, housekeeping routine, resident storage habits — and check the working dimensions against it.
| Layout type | Where it works | What to check in the proposal |
|---|---|---|
| U-shaped run | Dedicated dressing rooms with access on three sides | Clear walking width between opposing runs, and whether the corner returns are usable or lost space — see U Shaped Walk in Wardrobes |
| L-shaped run | Rooms where the wardrobe wraps one corner | Corner access, rail heights and how the glass doors clear the return wall when open — see L Shaped Walk in Wardrobes |
| Island unit | Larger dressing rooms with a central element | Circulation on all four sides and the island's top surface use — see Island Walk in Wardrobes |
| Open configuration | Boutique retail, display settings, schemes where concealment is not required | Dust provisions and how contents are presented — see Open Walk in Wardrobes |
4. Interior fit-out and lighting
Glass doors make the interior part of the visible design, so the inside specification deserves the same scrutiny as the outside. Check that shelf spans are stated with their load intent — glass shelves and timber shelves behave differently over a long span — and that drawer units, rails and accessories are listed with quantities per unit rather than "as required".
Integrated lighting is where walk-in wardrobes most often disappoint. A proposal should state the fitting type, colour temperature, mounting position, how the fittings are switched or sensed, where the driver sits, and who runs the supply to the wardrobe. If none of that appears, lighting has been priced as an allowance or omitted entirely, and it will surface later as a variation.
5. Manufacturing, tolerance and site interface
Ask how the quoted dimensions were obtained. Made-to-measure joinery should be set out from site-verified dimensions, not from drawing dimensions alone, because floors, walls and ceilings are rarely square once finished. Confirm who re-checks dimensions before production starts, and at what point the order becomes fixed.
- Who is responsible for the interface with flooring, wall finishes and ceiling — joiner, framer or finish trade
- How the unit is anchored, especially for tall runs and glass doors where weight sits on one edge
- Whether prototyping or a first-article unit is offered before the full batch is released
- What tolerance is allowed on-site, and who makes good any gap left behind
6. Packaging, freight and delivery sequence
Glass and cabinetry are two of the least forgiving items to ship, so the logistics section of a proposal is not administrative filler — it is a risk statement. Look for glazing protection method, crate or carton specification, container loading plan, shipment tracking arrangements and customs documentation handled by the supplier. For international projects, confirm whether delivery is to port or door-to-door, who carries cargo insurance, and which Incoterms apply.
Then check sequencing. Glass-fronted wardrobes should arrive after wet trades and floor finishes are complete, in a sequence that lets units be installed without other trades working around them. A supplier who plans the delivery order alongside your programme saves the re-handling that damages glass.
7. Installation, snagging and after-sales
The final section decides whether the finished result matches the rendering. Confirm who installs — supplier-supplied crews, local contractors under supervision, or a hybrid — and what site conditions they need: clearance, storage, power, hoisting access for full-height glass panels.
- A written snagging process with a defined sign-off point per unit
- Warranty terms stated in writing, including what is covered on hardware, glass and boards respectively
- Spare-parts availability, since hardware fails years after handover, not in week one
- Named contact for post-handover issues, with a stated response arrangement
A quick red-flag list. A single generic elevation quoted across all room types; "glass" specified without type, thickness and tint; lighting shown only as an allowance; no site verification step before production; freight quoted to port with no delivery plan; and warranty language that covers "products" but never names hardware or glass.
How a single supplier simplifies this review
Comparing wardrobes is harder when they arrive as one package among many trades. Santerson works as a furniture and building materials manufacturer and one-stop supplier, covering design consultation and space planning through custom/OEM manufacturing, logistics and door-to-door delivery, installation and after-sales support — so the wardrobe schedule can be checked against the same drawings, finishes and programme as the cabinetry, joinery, doors and lighting around it. That single point of coordination is what keeps a glass walk-in specification consistent from proposal to handover.
All dimensions, layouts, finishes, freight arrangements and warranty terms shown in a proposal should be confirmed for your specific project before order release.