A mid-century whole-house cabinetry package is not a set of boxes that arrive and get screwed to the wall. It is joinery, wall panelling, lighting, stone and doors meeting each other on site. The installation plan is where that meeting is decided — before production starts. Here is what we ask buyers, designers and site contractors to have in writing.

Why mid-century built-in joinery needs a written installation plan

Warm wood grain, flush handleless fronts, arched niches, floating shelves and integrated bench seating all share one requirement: the surrounding building fabric has to be ready when the cabinets arrive. A wardrobe that runs floor to ceiling against a wall that is out of plumb will show gaps at the architrave. A bay-window desk with drawers needs a recess of the right depth, or the drawer fronts sit proud of the reveal. A floating sideboard with a stone counter needs solid blocking in the wall behind it, not plasterboard alone.

In our mid-century whole house custom cabinetry & built-in storage project, the joinery was designed around conditions that already existed on site: an integrated bay-window desk with multi-layer drawers, open staircase bookshelves, a vertical slat partition, and wood-grain kitchen cabinets sized to the appliances. Each of those items depends on something the builder controls — window reveal depth, stair geometry, slab level, appliance positions, power and light points. The installation plan records who does what, and in which order.

Before production: site survey and the dimensional record

Everything downstream rests on a measured survey taken after the main structural and wet work is finished. Our survey captures:

  • Wall lengths, heights and floor levels at several points per room, so out-of-level slabs are known and can be compensated for with scribes and plinth packs rather than discovered on the day.
  • Plumb and square checks on walls that carry full-height panelling or a concealed wardrobe.
  • Window reveals, sill heights and radiators or pipework that affect a bay-window desk or bench seat.
  • Stair flights and landings — going, rise and string line — for any bookshelf or storage built against them.
  • Positions of sockets, switches, downlights, data points, sprinklers, air-conditioning grilles and floor drains.
  • Door openings, architrave profiles and skirting details that the joinery has to return to.

We recommend the buyer's site representative countersign this record. A dimension changed after drawings are released is a variation, and it moves the production date.

Interface drawings: the part most plans leave out

Production drawings show the cabinet. Interface drawings show what the cabinet touches. For a whole-house package we ask for these to be issued together with the shop drawings and circulated to the builder, the electrician, the plumber and the stone supplier:

Joinery itemSite preparation it depends onWho confirms it
Floating sideboard / floating shelves with stone counterTimber or steel blocking set at the drawing level; wall finished to true plane before brackets go inBuilder, from our setting-out plan
Integrated bay-window desk and drawersReveal depth and sill height as built; skirting removed or returned to the joinery lineBuilder / site supervisor
Full-height concealed wardrobe in flush panellingFloor level tolerance, ceiling set-down, architrave line, opening allowance for sliding or hinged leavesBuilder and designer
Kitchen cabinets around appliancesAppliance models fixed before drawings; appliance power, extraction and drain points at the specified coordinatesBuyer / M&E contractor
Built-in lighting in niches, shelves and cabinet interiorsDriver access point, switched feed, low-voltage runs in the correct conduitElectrician, from our wiring schedule
Stone or travertine counter and splashbackSupport framing, edge return detail, template taken after cabinets are setStone supplier / us
Barn door, pocket door or flush interior door in a panelling runRough opening size, header support, floor track recess or pocket cavityBuilder, from the door schedule
Staircase bookshelf and slat partitionFixing substrate behind the finish lining; clear headroom at the stairBuilder / stair contractor

Sequence and lead time: what has to be finished before delivery lands

Custom cabinetry is made to millimetre dimensions, so it should be one of the last trades in. Our recommended sequence for a villa or apartment fit-out:

  1. Structure, services rough-in, screed and plastering complete; wet trades dry and tested.
  2. Final survey and drawing sign-off; appliances, taps, stone and hardware fixed.
  3. Production in the factory, with our own inspection before packing.
  4. Painting and floor finishing up to the joinery line, leaving final touch-up for after installation.
  5. Packaging, container loading and shipping under the agreed Incoterms; delivery date confirmed against site access.
  6. On-site installation, then snag inspection and handover.

Two practical points buyers often miss. First, storage: a whole-house package arrives in many crates and needs a dry, lockable area close to the work face. Second, access — lift dimensions, stair widths, turning radii and whether a crate will pass a doorway should be checked before the container is booked, not when the truck arrives. Our logistics and door-to-door delivery service covers freight forwarding, packing lists, container loading plans and shipment tracking, so the crate schedule can be matched to site access in advance.

What we put in the installation pack

Every package ships with documentation written for the person holding the drill, not only for the architect:

  • Packed crate list with a room-by-room label, so crates open in installation order rather than at random.
  • Setting-out drawings with dimensions from fixed site reference lines.
  • Assembly sequence per unit, including which panels are site-trimmed and which are factory-finished.
  • Fixing specification: fixing type per substrate, blocking requirements, load notes for anything hung on the wall.
  • Clearance and ventilation notes for appliance housings and any wet or outdoor-adjacent cabinetry.
  • Interface drawings for stone, glass and doors, with template responsibility marked.
  • Finish schedule: wood species and stain or veneer reference, lacquer or laminate code, hardware model, hinge and runner type — so on-site corrections match what was ordered. In our custom mid-century modern whole house custom furniture project, that schedule covered the warm wood tones, travertine elements, arched doorway and handleless fronts running from the entrance cabinet through the living-room sideboard to the bedroom wardrobe and integrated bay-window platform.
  • Snag list template and a sign-off sheet for handover.

Site conditions checklist before the first crate opens

  • Floors level within the tolerance stated on the setting-out drawings; any deviation reported before installation starts.
  • Walls and ceilings at final finish level, with blocking installed at marked heights.
  • All services tested and commissioned; no open chases behind the joinery line.
  • Power for built-in lighting terminated and live-tested.
  • Painting and flooring complete up to the joinery, protection laid in the work area.
  • Dry, secure storage; crates kept flat and unopened until their room is ready.
  • Site access confirmed: lift, stair, doorway widths, parking and unloading time.
  • A named site contact who can answer dimensional questions the same day.

Snagging, tolerance and handover

Built-in joinery is judged on lines: door fronts flush across a run, consistent shadow gaps, arch curves matching the opening, drawer fronts aligned in pairs. We ask for a joint snag walk with the client's representative after installation, covering front alignment, door and drawer operation against the finished floor, silicone and sealant lines, stone joints, and hardware function. Items are logged, closed out on site where possible, and photographed for the record.

After handover, warranty terms, spare parts and maintenance guidance follow the scope agreed in the contract — see our installation and after-sales support page. We suggest the client keeps the finish schedule and hardware list with their building manual; matching a veneer or replacing a runner years later is far easier when the codes are on file.

Tolerance figures, blocking details and interface dimensions in this article are typical practice for timber and engineered-board built-in joinery, and are given as planning guidance rather than fixed specifications. Exact requirements depend on the wall build-up, floor system and installation standards of your project — confirm them with your designer and contractor before production is released.

A worked example: where the plan earns its keep

Take a mid-century run that combines an arched wall niche with built-in lighting, layered floating shelves, a full-height flush wardrobe and an integrated vanity — the arrangement in our arched niche & full house custom wall cabinet project. Four different trades are involved. The arch shape has to be set out on site before the panelling is ordered. The niche lighting needs a driver position that stays reachable after the wall is closed. The wardrobe's flush panels require the floor and ceiling lines to be within tolerance across the whole wall, or the vertical joints will read out of plumb. The vanity counter needs its support and its waste confirmed in advance. Written into an installation plan, these are line items with owners and dates. Left out, they become three weeks of delay and a variation order.

How we work with buyers on a whole-house package

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, and supplies whole-house cabinetry together with the flooring, wall panelling, doors, lighting and stone that surround it. Our process runs through consultation, design and planning, production, logistics, installation and after-sales, under turnkey interior project solutions for villas, hospitality and offices. Cabinet sizes, materials, wood colours, arch profiles and storage layouts are all customised to the plan and to how the household is actually used.

Send us your drawings or a room-by-room brief, and we will return a survey schedule, a proposal for the storage layout, and an installation plan you can circulate to your builder.

Planning a whole-house joinery package?

Talk to us about site survey, 3D design, production and on-site installation for mid-century built-in cabinetry. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the contact page.