A glass modular wardrobe looks simple on a drawing. It is a run of carcasses, a set of glazed fronts and some internal fittings. The problems start when that drawing reaches the factory with half the decisions still open: which glass, which frame, which drawer stack, where the skirting stops, how the units meet a sloping ceiling. A manufacturer can build almost anything in this category, but they cannot read your mind — and a vague enquiry is how a project ends up with three rounds of drawings before production has even started.
The brief below is the one we would like to receive on day one. Send it and the quotation comes back with fewer assumptions attached; approve the shop drawings and the run goes into production on the same schedule as the rest of the joinery package.
Start With the Room, Not the Wardrobe
Modular wardrobes are built to project-specific dimensions, so the survey is the first deliverable and not an afterthought. A tape measure and a rough sketch are enough to start, provided they answer the same questions every time:
- Overall run length at floor level, plus the height at the left end, centre and right end. Ceilings in refurbished villas are rarely level, and three heights tell us whether the scribe goes on top or on one side.
- Depth available from finished wall face to finished floor finish, called out clearly as a bare-wall or finished dimension.
- What is in the way: skirting boards, light switches, air-conditioning grilles, downlights, door openings that swing into the run, and any services you want boxed in.
- Floor and wall finishes already fixed for the room, because a wardrobe abutting stone cladding is detailed differently from one abutting plaster.
If the units also have to pass through a lift lobby or a narrow stair on the way into the room, say so at this stage. It changes whether we deliver a run as full-height carcasses or as knock-down modules with a site assembly detail.
Decide What the Glass Has to Do
Glazing is where most of the cost and most of the disappointment sits, so we need the function before the appearance. Tell us whether the glass is there to hide the contents, to show them, or to bounce light around a narrow bedroom.
| What you want | What to specify in the brief |
|---|---|
| Contents out of sight, but not a mirror | Frosted or ribbed glass, and whether the surface faces in or out. Our Glass Modular Wardrobes are specified this way when a bedroom needs the run to read as a wall. |
| Contents partly visible, with some warmth | Bronze or smoked tinted glass. State the tint by name and ask for a sample offcut before the drawing is signed; tints shift noticeably between a brochure image and a north-facing room. |
| A wardrobe you can see straight into | Clear glass, which means the interior finish becomes part of the design. Specify the carcass decor and the back panel at the same time, not later. |
| A slim metal profile around the glazing | An aluminium-framed glazed front, with the frame colour and profile width written down. Frame finishes are chosen from our range rather than matched to a paint chip. |
For each glazed elevation, note the door type as well: hinged, sliding or a mix of both in one run. A sliding front needs track clearance at the head and a fixed return panel; a hinged front needs the opening direction and the adjacent wall shown on the sketch. Mixing the two on one run is common and completely workable, but it has to be on the drawing before the carcasses are cut.
Specify the Interior by How You Live in It
Modular wardrobe collections are usually organised around how the inside is used, and that organisation is a useful shorthand in a brief. If you already know the split, name it rather than describing it: hanging-heavy runs, drawer-led runs, shelf-led runs, or an open display section in the middle of a closed run.
Useful references on our site make that conversation faster:
- Hanging Modular Wardrobes for long-hang and double-hang zones, including where a rail should sit relative to the shelf above.
- Drawer Focused Modular Wardrobes when the run carries folded clothing, and state whether you want shallow jewellery height or full-depth boxes.
- Shelf Focused Modular Wardrobes for linen and storage zones, with the shelf pitch you actually use.
- Combination Modular Wardrobes when one bedroom needs all three in a single run, and give us the order of the zones from left to right.
Two details save a revision each time. First, tell us what goes at the top of the run — luggage, out-of-season bedding or nothing at all — because that decides whether the top compartment is a separate carcass or a shelf in the main box. Second, list any internal accessories you want quoted with the unit rather than added on site: pull-out trays, trouser slides, mirror panels, lighting inside the glazed sections.
Name the Materials You Are Prepared to Live With
Board substrate, edge treatment and surface finish are decisions you can delegate, but not decisions you should leave blank. Give us a shortlist rather than an adjective. "Matte" is not a specification; a matte lacquer front in a named colourway with a matching ABS edge is.
Where the wardrobe sits in a coastal villa or a bathroom-adjacent bedroom, say so plainly and ask which substrates and edges we recommend for that environment. We will quote accordingly rather than assume a standard interior build. If the finish has to match joinery already on site — a door, a vanity, a wall panel — send the make and model reference or a physical offcut. A photograph of a sample is not a colour standard, and matching from one is how a project ends up with two greys in the same room.
Say Where the Project Is and How It Arrives
Custom wardrobes are usually shipped, so the logistics section of the brief matters as much as the design section. Include:
- Delivery address and site access — apartment block with an elevator, villa with a driveway, or a heritage house with a narrow stair.
- Whether you want the units delivered flat-packed with assembly on site, or partly assembled to cut site labour.
- Which party handles freight, customs clearance and last-mile delivery. If we do, tell us the port and the delivery window your builder needs; our logistics and door-to-door delivery service covers freight forwarding, packing lists and documentation, but the Incoterms and duties are agreed per project.
- Whether installation is by your trades or ours. A glazed run installed by a joiner who has never seen our hardware is a different risk from one we commission on site.
Send the programme dates with this information — site handover date, joinery install window and the date you need drawings back. Production schedules are set against the whole furniture package, so a wardrobe run that arrives in the brief two weeks late will not be squeezed in at the end.
What We Send Back, and What We Need From You
With the above in hand, the sequence is straightforward. You send the survey, the elevation sketch and the material shortlist; we return a quotation with the assumptions written out, followed by shop drawings showing elevations, section through the run, door divisions, glass tints and internal fittings line by line. Those drawings are what you sign.
Before signing, check four things on the drawing: total height against your survey at both ends, door divisions where you expect them, the glass tint named in text rather than shown only as a colour swatch, and every internal accessory priced. Anything not on the signed drawing is a variation.
If the wardrobe is one line in a larger fit-out — bedroom storage plus kitchen cabinetry plus doors and wall panelling for the same building — it is worth sending the whole package together. We work as a one-stop furniture and building materials supplier, so one set of drawings, one production schedule and one container usually costs less in coordination time than three separate suppliers reconciling their own details. Our turnkey project solutions cover that scope from design coordination through to site handover.
Dimensions, glass tints, finishes and hardware options are confirmed per project against the approved shop drawings. Availability of specific board substrates, edge profiles and freight arrangements varies by destination and is quoted case by case.