A matte sliding door wardrobe usually looks finished on the drawing and awkward on site. The panel size changes by a few millimetres, the track clashes with the skirting, or the flat finish picks up every fingerprint in a shared corridor. None of that is a wardrobe problem. It is a coordination problem between the drawing package, the room build-up and the way people actually use the room. Below is the sequence we run on residential and villa projects so matte sliding door wardrobes arrive measured, specified and ready to install.
Why the matte finish raises the coordination bar
Sliding doors run on a track. That single fact drives most of the decisions: how much depth the door stack eats into the opening, where the top rail sits relative to the ceiling, and how much floor build-up the threshold can accept. A hinged door only needs swing clearance; a sliding door needs a working mechanism in three planes at once.
A matte surface then changes what people notice. Gloss reflects light and hides small plane deviations; a matte face scatters light, so a panel that is out of plumb by a few millimetres reads as visibly crooked, and any mark on the face shows up immediately. In bedrooms this is rarely an issue. In shared family bathrooms, guest rooms and high-traffic villa corridors, it becomes a maintenance question you should settle before the finish is signed off.
Because our wardrobes are made to measure with material and finish options selected per project, none of these decisions have a default answer. The dimensions, layout and finish all get confirmed against your drawings, which is exactly why they should be confirmed early rather than at the shop-drawing stage.
What to fix on the design drawings
1. Door stack and opening geometry
- Mark where the door panels stack when open, and check that nothing — a bed headboard, a door leaf, a light switch, an air-conditioning return — sits in that zone.
- Show the number of panels and their meeting stiles. Two-panel and three-panel stacks behave differently at the reveal.
- Note the room's corner conditions. A wardrobe returning into a corner is a different detail from a straight run, and sliding door corner wardrobes need the return dimension fixed before the carcass is drawn.
2. Ceiling, floor and wall build-up
- State finished floor level and finished ceiling level, not structural levels. Slab-to-slab dimensions are useless for a made-to-measure carcass.
- Show the floor build-up where the track sits: screed, adhesive, tile or timber, underlay. A threshold that cannot take the build-up forces either a scribe or a revised track detail.
- Record wall flatness and plumb along the run. Uneven plaster is normal; what matters is the deviation you are asking the installation to absorb.
- Decide the skirting treatment early — carried through behind the carcass, cut around it, or omitted under the wardrobe.
3. Services and fixings
- Confirm that no conduit, pipe or backbox is buried in the wall the carcass fixes to.
- Show any internal lighting: transformer position, cable route, and how the driver will be reached for maintenance.
- If wardrobe lighting is switched from a wall plate outside the joinery, place it clear of the door stack.
4. Interior layout against the actual brief
- Hanging lengths: full-height for coats and dresses, double hang for shirts and folded items at eye level.
- Drawer count and whether any drawer must clear a door handle or an adjacent panel.
- Shelving bays for folded stacks, plus reserve height for suitcases and off-season storage.
- Tall items — ironing board, vacuum, laundry basket — need their own bay, decided now rather than improvised on site.
5. Finish schedule
Name the matte face and the substrate together on the schedule, and keep the same naming across the joinery drawings, the finish schedule and the purchase order. Where a bedroom set mixes surfaces — a matte carcass with a glass front in an adjacent bay, for example — show that combination on one elevation so the reveals and edge trims can be reconciled rather than left to site. Our glass sliding door wardrobes are drawn and detailed the same way, which keeps mixed runs consistent.
Site requirements that decide whether installation goes smoothly
| Site condition | What to record | Why it decides the outcome |
|---|---|---|
| Floor level along the run | Levels at both ends and at intermediate points, with finished floor level marked | Sets the scribe allowance on the track and whether the door stack will run parallel to the ceiling |
| Wall plumb and flatness | Deviation across the full wardrobe length | A matte face makes small deviations visible, so the fixing method has to be planned, not improvised |
| Opening depth | Clear depth at head, middle and sill | Determines carcass depth plus track zone; the narrowest reading governs |
| Access route | Lift size, stair width, turning radiates, door widths on the delivery path | Decides whether the unit ships as a built-up carcass or in panels that can be assembled in the room |
| Wet areas | Ensuite and bathroom ventilation, distance from showers | Fixes board selection and edge treatment for high-humidity rooms |
| Other trades | Plasterer, electrician, floor finisher — who closes off before installation | Wardrobe installation is a finishing trade; it cannot start into an unfinished room |
| Handover sequence | Installation date against painting, flooring and snagging | Late paint or floor works damage matte faces that are difficult to patch invisibly |
Send finished levels, wall deviations and access constraints with your drawings. Those three items resolve most of the questions a made-to-measure wardrobe raises.
A coordination sequence that survives construction
- Brief. Room by room, who uses it and what has to fit inside.
- Drawing review. We check the layout against the dimensions you send and flag conflicts before anything is cut.
- Shop drawings for approval. Elevations, sections at the track and threshold, interior layout, finish schedule. Production does not start until these are signed.
- Manufacturing with pre-shipment checks on panel size, hardware set and finish.
- Packaging and delivery. Crating matched to the access route recorded at stage 1, with documentation prepared for import clearance.
- Installation, inspection and snag list. Doors adjusted to run true against the ceiling line, panels aligned so the matte faces read flat.
Where projects usually lose time
- Structural levels on the drawings. If the drawing shows slab levels, the carcass dimensions are guesses.
- Finish named by colour only. Matte grey from one board range is not matte grey from another; specify face and substrate.
- Track left to site. A threshold detail invented on the day usually ends with a visible scribe.
- Services found during installation. A backbox behind the carcass is fixable but slow.
- Delivery before the room is ready. Crates stored in a corridor get damaged; matte panels are not cheap to remake late.
Questions we get from project teams
How early should the wardrobe be specified?
At the point where finished floor and ceiling levels are fixed. That is usually enough to draw accurate elevations and sections, and it keeps the track detail out of the construction programme as a late variation.
Can the interior layout differ between rooms in one order?
Yes. Each unit is drawn to its own brief, so a master bedroom can be hanging-led while a guest room is shelf-led, all on the same carcass and finish specification.
What if the site opening is out of square?
Send the measured deviations. Scribe and filler widths are set from those readings at the shop-drawing stage, so the finished face still reads true — which matters more on a matte panel than on a glossy one.
Do you supply matching joinery in the same finish?
Where a project calls for it, wardrobes sit alongside custom furniture such as vanities and media units produced to the same finish schedule, so faces match across a room.
Getting started
If you have drawings in progress, send the elevations together with finished levels, measured wall deviations and the access route to the room. We will return shop drawings for your approval before anything goes into production.
SANTERSON manufactures made-to-measure wardrobes and interior joinery for residential and villa projects, from design coordination through production to delivery and installation support.