A floor standing bidet looks like a simple ceramic item until it reaches site: the waste outlet does not line up with the pipe, the suite pieces do not match visually, or the glaze colour is slightly off across rooms. On our Floor Standing Bidet 1038F the body, back-to-wall fixing and glaze are fixed by the mould, so almost every surprise on site comes from something that was never written down before production. The list below is what we ask buyers, contractors and designers to close out before we open a mould order — the same checklist we work through on villa and hotel bathrooms.
1. Drainage layout: trap type and rough-in distance
This is the item that causes the most rework. A floor standing bidet is normally supplied with either an S-trap (floor outlet) or a P-trap (wall outlet), and the two need completely different pipework. Rough-in — the distance from the finished wall face to the centre of the waste — must be measured on site, not taken from a drawing that was drawn before the tiling build-up was decided. The 1038 series shows how sensitive this is: our Two Piece Washdown Toilet 1038A is offered with both S-trap and P-trap options, while the Wall Hung Toilet 1038W is a wall-outlet fixture only. Never assume that a matching suite shares one drainage arrangement.
Because the trap option and rough-in figure for the 1038F bidet are set on the technical sheet rather than in the catalogue description, we confirm both in writing against your as-built plumbing drawing before production starts. If the pipework is already cast, send us the photo and measurement first — we will tell you honestly whether the standard outlet can be met or whether the layout needs changing.
2. Water supply: tapware, taps holes and mixer type
Bidets are supplied with either pre-drilled tap holes or a single-hole configuration for a mixer, and the rim shape determines which tapware actually sits correctly on the deck. Confirm the tapware model, its spout reach, and whether the supply points are concealed in the wall or brought up from the floor. Concealed supplies must be set out before the tiles go on, because once the basin is fixed to the wall there is no room to chase a new outlet.
We need the tapware specification early if you want us to supply taps with the bidet, and we need it even earlier if someone else is supplying the taps — the drilling pattern on the ceramic has to match their body from day one.
3. Suite consistency: series, glaze colour and finish
The 1038F is designed to sit next to the matching 1038 series toilet so that the bowl shapes, seat heights and glaze read as one set. When a project mixes series or buys from two different batches, small differences in white tone and rim profile become obvious under bathroom lighting. Decide the whole suite at once — water closet, bidet, wash basin — and order it against one production run.
The 1038 family covers more than one installation style. If a guest bathroom needs a floating look with an empty floor line, the wall-hung options in the same series are the better fit; if a main bathroom has a floor outlet and more space, the freestanding bidet works well. Where a suite must be consistent but rooms differ in size, we often specify both formats on one project — and that decision belongs to you, not to whoever places the purchase order later.
4. Fixing method and the wall behind the unit
The 1038F stands on the floor and is fixed back to the wall for stability, so the finished wall must be able to take that fixing at the right height and depth. Confirm the wall build-up — stud and board, brick, or tiled substrate — and where the tiles stop, because the bracket position has to clear the tile line and land in solid support. A wall that will be rendered after the ceramic arrives shifts every fixing dimension.
5. Dimensions against the real room, not the plan
Overall length, width and height matter less than clearances: distance to the adjacent toilet or basin, the swing of the door, the position of the shower screen or towel rail, and whether the finished floor level has changed since the plumbing was set out. We work from your room dimensions with the final floor and wall finishes included, then check that the unit still clears everything around it.
6. Glaze quality and the maintenance expectation
The 1038F carries a glossy ceramic glaze chosen to resist dirt and limescale build-up, which is why it stays practical in family bathrooms and hotel rooms alike. What we do need agreed is the cleaning regime you expect from housekeeping or residents, because harsh acidic cleaners damage any glaze over time. If the project is in a hard-water area, tell us — it changes what we recommend for finish selection across the whole bathroom rather than just this one piece.
7. Quantities, spares and how the order splits
Bathroom fixtures get damaged in transit and replaced during defects periods, so a bare room-count order usually runs short at handover. We recommend adding spare units for each fixture type on multi-unit projects, and we plan the production run so spares come from the same batch as the main order — that is what keeps glaze tone identical.
Tell us how delivery must be split across phases or room types. A villa renovation and a boutique hotel both benefit from staged shipments; neither benefits from forty pieces arriving on one date when only eight rooms are ready for them.
8. Packaging, protection and handling on site
Ceramics need adequate protective packaging for the journey and for moving through a building under construction. Confirm the packing standard we apply, how cartons are labelled by room so fitters pick the right piece without opening everything, and where goods will be stored before installation. Fragile-item handling instructions should reach the site team, not just the buyer.
9. Documentation and inspection before shipment
Before production closes we confirm the technical drawing back to you for signature: outlet position, rough-in, overall dimensions, tap-hole pattern and colour code. Then each batch is checked against that signed sheet — glaze surface, no crazing or shipping damage, complete fixing sets in the carton. If your project has a consultant inspection or a pre-shipment sample approval step, we schedule for it rather than working around it.
What to send us before production starts
| Item to confirm | What we need from you |
|---|---|
| Drainage | S-trap or P-trap, rough-in measured on site, as-built plumbing drawing |
| Water supply | Concealed or exposed supplies, tapware model and spout reach |
| Suite scope | Room-by-room schedule: WC, bidet, basin, series per room type |
| Finish | Glaze colour code, one approved reference for the whole order |
| Wall condition | Wall build-up and tile line, fixing height clearance |
| Room dimensions | Clearances to door, screen and adjacent fixtures, finished floor level |
| Quantities | Order by room plus spares per fixture type, phased delivery plan |
| Sign-off route | Drawing approval, sample approval, pre-shipment inspection if required |
How our team helps close these points
As a furniture and building materials manufacturer working on villa, hospitality and residential projects, we handle bathroom ceramics as part of a wider fit-out rather than as an isolated line item. That matters here because the bidet decision touches tiling set-out, tapware, joinery and even the flooring order — all of which pass through one coordination process under our Custom & OEM Service, from drawing confirmation and production to logistics and door-to-door delivery at your site.
Send us the room schedule and the plumbing drawing. We will mark up every open point on the 1038F before production opens, flag anything that cannot be met, and put a signed specification in front of you first — which is considerably cheaper than fixing it after the tiles are laid.