A quotation for a corner wardrobe can look complete on the page and still leave the costly decisions undecided. Before you sign a purchase order, work through the proposal in the order the room actually gets built: opening dimensions, door travel, internal layout, materials, then delivery and installation.
Start With What the Proposal Says About Your Opening
Corner units fail most often at the corner itself. A credible proposal for sliding door corner wardrobes should state finished height, width and depth for each leg of the unit, plus the internal corner dimension and how the two runs join. If only a nominal overall width appears, ask for a dimensioned elevation of both walls and a plan showing clearance for skirting, architraves, power points and any bulkhead.
Sliding doors need travel space that hinged doors do not. Check that the proposal shows which panel slides over which, where each panel parks when open, and how much of the opening stays accessible once a panel is drawn back. Where the corner geometry is tight, compare the sliding option against hinged door corner wardrobes or an open corner arrangement, and ask the manufacturer to say plainly which layout they recommend and why.
Check That the Internal Layout Matches How You Store Things
The external finish is what you see; the internals are what you use. A proposal worth accepting shows a shelving and hanging diagram for every compartment, including the dead corner zone. Look specifically for:
- Hanging rail heights, split between long garments and short garments.
- Adjustable versus fixed shelf positions, and shelf depth in the return leg.
- Drawer or pull-out provisions in the corner, where a fixed shelf is hardest to reach.
- Lighting provisions, with the switch position and cable route shown on the drawing.
- Top-of-unit storage: whether it is closed, open, or left to the site builder.
Where a whole-room scheme is involved, ask for the wardrobe to be drawn alongside the built-in furniture package rather than as an isolated item. Consistent carcass construction, matching finishes and one set of site levels across bedroom, hallway and laundry joinery is easier to achieve when everything is detailed together.
Read the Materials Schedule, Not the Marketing Line
Two proposals at the same price can be built very differently. Ask for each of the following in writing, with the option you have been quoted named explicitly:
| Item | What to confirm in the proposal |
|---|---|
| Carcass and back panel | Board type and thickness, edge banding, and how the unit handles out-of-square walls |
| Door substrate and surface | Whether the door is lacquer, melamine, acrylic, veneer or glass, and the exact colour or grain reference |
| Glass (if specified) | Thickness, safety grade as stated on the specification, tint or finish such as clear, frosted, smoked or ribbed, and framing detail |
| Sliding hardware | Track and roller make or duty rating, panel weight allowance, adjustment method, and spare-part availability |
| Finish samples | Physical sample reference under your own lighting before production starts |
Glass fronts change both the look and the build. If light passing through the doors matters in your room, ask to see glass corner wardrobes in the same finish family, and confirm how the frame is fixed and whether hardware is visible from inside the cabinet.
Test the Manufacturer’s Process Behind the Number
Price differences between suppliers usually reflect what happens after the order. A manufacturer handling custom work should be able to walk you through design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, and final installation and handover. SANTERSON describes exactly that sequence on its turnkey furniture and building materials pages, alongside interior design services covering layout planning, drawings and production coordination.
Use those stages as your evaluation checklist. For each stage, ask who is responsible, what document is produced, and what you approve before the next stage begins. A supplier who cannot name the drawing you will sign off before cutting is a supplier who will change-order later at your cost.
If your project also needs flooring, wall panels, doors, lighting or bathroom joinery from the same source, that coordination is where a one-stop furniture and building materials supplier earns its place: one set of levels, one finish schedule, one delivery window and one point of contact for snags.
Logistics and Installation Terms to Nail Down
For an overseas order, the proposal should be explicit about packaging and container loading, the shipping mode quoted (sea, air or rail), who prepares customs paperwork, and where your delivery obligation begins and ends. Confirm whether the quoted price is delivered to site or to a port, and how panels are protected at the corner mitres, which are the most easily damaged edges in transit.
Then confirm the installation arrangement in writing: who installs, who prepares the walls and floors beforehand, how snags are recorded and closed out, and what happens if a panel arrives off-size. Ask for the sequence in which the wardrobe is installed relative to flooring, paint and skirting, since a made-to-measure unit assumes site conditions that must already be final.
Before you sign: dimensioned drawings of both runs and the corner; a named materials and hardware schedule with a physical finish sample; an internal layout diagram covering the dead corner; stated shipping terms and delivery point; and a written installation and snag process.
Frequently Asked Questions
What drawings should I expect before production?
Elevations of each wall run with finished dimensions, a plan showing door travel and clearances, an internal layout for every compartment, and a finish schedule referencing the sample you approved.
When is a sliding door the wrong choice for a corner?
Where the return leg is too shallow for panels to stack, where ceiling or floor levels are badly out of level and cannot be corrected, or where you need full simultaneous access to both runs. Ask the manufacturer to compare the sliding option with hinged and open layouts on your drawings.
How do I compare two proposals at different prices?
Normalise them: same board thickness and edge treatment, same hardware duty rating, same glass specification, same delivery point, same installation scope. Price gaps almost always sit in hardware, board thickness and what "installed" includes.
Send your opening dimensions, a photograph of the corner and your storage requirements, and ask for a dimensioned proposal with the materials schedule named line by line. That single request separates suppliers who have engineered the corner from those who have only priced a box.