A swim spa that sits on a villa terrace, a resort garden or a clubhouse deck has to satisfy two very different sets of requirements at the same time. It must fit the physical envelope of the site and support the people who will use it, and it must also arrive as a documented line item that a purchaser, a main contractor and an M&E consultant can all check against the same drawing. Outdoor Swim Spa WS-S10 is one of the longer units in our configurable swim and hydrotherapy range, so the specification conversation usually starts with measurements. This article sets out exactly which dimensions matter, which project inputs we need from your side, and how those inputs translate into a quotation that matches the site.
Start With the Envelope: The Catalogue Dimensions of WS-S10
The published catalogue entry for Outdoor Swim Spa WS-S10 gives a shell size of 10000 × 2200 × 1420 mm — a ten-metre long basin, just over two metres wide and about 1.42 m deep. Those three numbers are the starting point, not the whole story. A ten-metre length is what allows the unit to read as a lap-length water feature rather than a compact spa, and it is also the number that determines whether the unit can pass through a gate, sit on a slab, or be lifted into position at all.
Before any comparison between models makes sense, the same three measurements should be recorded for every candidate. For context within our range, the catalogue entry for Outdoor Swim Spa WS-S12 lists 11740 × 2200 × 1470 mm against the 10000 × 2200 × 1420 mm of WS-S10. Both are long-format units, and the difference of roughly 1.7 m in length is often the deciding factor on a constrained terrace. If you are working through our Swimming Pools and Swim Spas category, note the length first and treat everything else as adjustable.
Site Measurements That Decide Whether the Unit Fits
When a purchaser sends us only the product dimensions, we can tell them almost nothing. The measurements that actually decide feasibility come from the site plan and from the route the unit takes on its way there.
- Clear opening length and width. Measure the narrowest point on the delivery route — gate, side passage, garage opening, lift lobby or courtyard entry — not just the final position. A 10 m shell cannot negotiate a 6 m straight run with a corner unless it is being craned over.
- Access for lifting. Note overhead obstruction height, whether a crane or hi-ab can be positioned, and the ground-bearing capacity of the area it would sit on while lifting.
- Finished slab level and tolerance. Give us the finished floor level at the spa position and how much adjustment you can make on site. A unit set below finished level creates drainage and access problems that are expensive to correct later.
- Clearance around the shell. Leave room for steps, for the plant access panel, and for filter and pump servicing. The catalogue width of 2200 mm does not include working clearance.
- Structural support. Confirm whether the slab or deck is designed for a full water load plus occupants, and share the structural engineer's notes with us rather than after order confirmation.
Usage Inputs: Who Uses the Water, and How
The second set of inputs is not measured in millimetres. They shape which equipment set makes sense, and they belong in the enquiry before a quotation is issued.
Lap swimming or hydrotherapy first?
The WS-S10 catalogue entry lists water jets, LED lighting and ozone as the features shown, with 76 jets in total across the shell. The captured specification for this model does not list a swim training system; the variant listed as WS-S10-T carries the same 10000 × 2200 × 1420 mm shell and additionally shows a swim training system. That is the practical question to settle early: if daily lap swimming is part of the brief, say so in the enquiry so we confirm which configuration carries the swim unit rather than assuming it is included.
Occupancy and programme
For a private villa, the number of regular users sets water volume and heating demand. For a hotel, resort or clubhouse, we also need the opening hours, whether access is supervised, and whether the spa forms part of a spa circuit with wet rooms. Commercial use changes the filtration duty and the maintenance routine, and it should be stated in writing at the enquiry stage.
Climate and season of use
Tell us where the project is and whether the water is expected to stay open through winter. That single answer determines whether a heat pump and insulation belong on the schedule, and it affects running-cost expectations far more than any other option.
Equipment and Services Inputs
The captured specification for WS-S10 records one control set, two water pumps, one filter pump, 76 jets in total, one LED fitting with 40 small LED lights, and a total power figure of 7.65 kW. Treat those as the catalogue configuration for the model as published, and confirm the equipment set and electrical requirements for the configuration you are actually selecting — options change the numbers.
| Input | What we need from your side | Why it changes the specification |
|---|---|---|
| Electrical supply | Available supply capacity, phase and distribution-board location relative to the spa | Determines how the 7.65 kW catalogue figure is delivered and whether additional circuits are required |
| Heating method | Heat pump, existing plant room, or solar-ready requirement | A heat pump is listed as an option in our catalogue; it changes both the schedule and running cost |
| Filtration | Preference for cartridge or sand filtration | Sand filtration appears as a catalogue option and affects plant space and servicing access |
| Water treatment | Ozone as shown, plus whether UV sterilisation is wanted | UV sterilisation is an option; commercial settings often specify both |
| Insulation and cover | Site climate and winter use expectations | Insulation is listed as an option and governs heat retention between uses |
| Steps and entry | Deck level, user profile, accessibility brief | Steps are a catalogue option; the correct type depends on finished level and users |
Where a project needs something the standard shell cannot provide, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool line covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas where a rectangular ten-metre basin does not suit the plan.
Commercial Inputs That Belong in the Enquiry
A swim spa rarely arrives alone on a project. It sits inside an outdoor package that also includes loungers, shade structures and hard landscaping, and it is delivered through a procurement route with defined responsibilities.
- Package scope. Tell us whether the spa is a standalone purchase or part of a wider order across furniture and building materials, so one shipment and one set of documentation cover both.
- Delivery terms. State the delivery address, port of entry and who is acting as importer. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork and container loading planning.
- Installation responsibility. Confirm whether your contractor sets the shell and connects services, or whether you want our guidance on setting, inspection and handover as described under Installation & After-sales Support.
- Approval drawings. Send the landscape or architectural drawing showing the spa position so we can return a dimensioned layout for your consultant to check.
A Simple Specification Checklist
Before you send an enquiry, these items are enough to let us respond with something usable rather than a set of follow-up questions:
- Site plan with the spa position, clear access route and overhead obstructions dimensioned
- Finished floor level at the spa position and the structural note for the supporting slab
- Intended use — lap swimming, hydrotherapy, family use or commercial spa circuit — and expected occupancy
- Project location and whether year-round use is required
- Available electrical supply and the distance to the distribution board
- Preferred options from the catalogue list: control system, UV sterilisation, water pumps, heat pump, sand filtration, insulation and steps
- Delivery address, import arrangements and who carries out installation
With those inputs recorded, comparing WS-S10 against a longer or shorter model becomes a matter of matching shell length to site, then matching equipment set to programme. Send us the drawing and the usage brief, and we will confirm the configuration, the included equipment and the electrical requirements in writing before production is scheduled.
Planning an outdoor swim spa as part of a villa, resort or clubhouse package? Share your site measurements and usage brief with our project team and we will return a specification for the WS-S10 shell, or a custom shape where the plan calls for one.