A wardrobe submittal is where a high gloss lacquer wardrobe stops being a picture on a spec sheet and becomes something a contractor can build around, price and sign off. Below is the package we ask for on villa and apartment projects, and what each part needs to say before production starts.
Why the submittal matters more for lacquer than for other finishes
A high gloss surface shows its edges, its light reflections and every mismatch between one door and the next. A matte melamine panel can hide a small deviation; a mirror-depth lacquer door cannot. That is why our matte lacquer and high gloss items in the same collection go through different approval steps, even when the carcass drawing is identical.
Our Lacquer Wardrobes line is made to order. Finish, layout and dimensions are set per project rather than chosen from a fixed size chart, so the submittal is not paperwork we file after the fact — it is the document the quotation and the workshop drawings are both built from.
1. Drawings: three levels, not one
One drawing is never enough for a made-to-measure joinery package. We submit at three scales so that each reviewer can check the part they are responsible for.
- Layout plan. Wardrobe run against the room, door swing direction, clearance in front of sliding and hinged doors, and how the unit meets adjacent walls, skirting and ceiling.
- Elevation drawings. Each face with module widths, door split, handle or profile detail, and where plinths and scribes sit.
- Cross sections. Carcass depth, shelf and hanging-rail heights, the panel build-up at the door edge, and how the unit is fixed to the wall and supported at the floor.
If your drawings show only a plan and one elevation, we will ask for sections before confirming. It is cheaper to request them in week one than to raise it on site.
2. Finish schedule: colour, sheen and sample
| Item | What we record |
|---|---|
| Colour reference | RAL or NCS code, or a client-supplied painted sample board. A screenshot is not accepted as a colour source. |
| Sheen level | High gloss, matte or metallic range — stated per elevation, because a single room often mixes them. |
| Applied sample | A sprayed board in the selected colour and sheen, signed and dated by both sides before batch production. |
| Grain direction | Where a wood-effect lacquer is used, the grain run is marked on the elevations. |
The signed sprayed board is the single most useful attachment in the file. High gloss reads differently under warm 2700K downlight and cool daylight from a north-facing window, and no printed colour chart captures that. We produce the sample first, then lock the batch to it.
Related finishes worth deciding at the same time
Most bedroom joinery packages do not stop at one door type. If your submittal covers a two tone lacquer run or a glass and lacquer combination, the glass spec — tint, thickness, edge polish — belongs in the same schedule so that the door frames and the infill are approved together.
3. Substrate and construction
Lacquer is a finish applied to a substrate, so the submittal has to name both. We state the board used for doors, carcass and back panels, the edge treatment on visible edges, and the hardware set: hinges with soft close, slides, lifts and any integrated lighting. Where a unit sits near an ensuite or an external wall, we flag that in the same section so the board choice can be reviewed against the actual room conditions.
4. Tolerances, site conditions and interfaces
This is the section most often left blank, and it is where cost appears later. A high gloss door only reads as flush if the wall behind it is flat. The submittal should record:
- Floor level tolerance across the run, and who is grinding or packing before our installers arrive.
- Plaster set-out: where services are allowed to cross, since we scribe to a fixed face line.
- Scribe and filler widths at walls and ceilings, with the finish method for those fillers.
- Interfaces with flooring, skirting, cornices and adjacent joinery — who trims off, and when.
We ask for a site survey dimension set taken from the finished floor and finished wall faces, not from structural drawings. If your package is still at concept stage, say so in the submittal; we will price to a provisional set of sizes and mark it clearly as such.
5. Configuration and internal fit-out
Alongside elevations we attach the internal layout: hanging heights for long garments and short garments, drawer bank positions, shelf spans with their load note, lighting to display niches, and any accessories. For walk-in rooms, the same logic extends to island walk in wardrobes and the wall runs around them, where aisle width and drawer pull-out have to be checked against each other rather than assumed.
6. Packaging, delivery sequence and installation plan
High gloss panels travel badly when they are packed like ordinary flat-pack. Our submittal states the protective method for door faces, the crate marking system that ties each panel to an elevation number, and the delivery sequence if the site has restricted storage or lift access. We ship by sea, air or rail with the customs paperwork handled on our side, and the crate labels match the drawing numbers so the crew is not decoding a manifest at 7 a.m.
For multi-apartment work we recommend staging deliveries by unit rather than by shipment. It keeps gloss panels out of corridors where they will be knocked.
7. Approvals, sign-off and what changes after
- Named approver on the client or contractor side, with a date against each revision.
- A drawing revision block — every change initialled, not silently redrawn.
- The signed finish board reference number quoted on the production order.
- A cut-off point after which dimensional changes carry rework cost; state it plainly.
Practical rule: if a change lands after the sprayed sample has been approved, expect both a drawing revision and a new sample. That is the honest answer, and saying it in the submittal prevents an argument three weeks later.
What we need from you to start
- Room drawings in DWG or PDF, with finished floor and wall levels marked.
- The colour and sheen intent, even if it is only a reference image plus a RAL guess.
- Who signs off: main contractor, interior designer or end client.
- Delivery destination and any lift or access limits.
Send what you have. A submittal does not need to be complete on day one — it needs to be complete before the order goes into production, and we will mark every open item in red so nothing is approved by silence.
Send us your wardrobe drawings
SANTERSON is a China-based furniture and building materials manufacturer working on villa, apartment and hospitality projects. We prepare the submittal package with you — layout, elevations, sections, finish schedule and installation sequence — before anything enters production.
Contact PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com