A sliding panel TV system looks simple on a rendering and behaves very differently on site. Before the panels are cut, edge-banded and packed, six groups of decisions decide whether the wall works: opening dimensions, track and hardware layout, cable routes, screen support, finish continuity with the surrounding joinery, and how the whole assembly is delivered to the site. This article sets out what a project team should lock down before production begins on a made-to-measure Santerson Sliding Panel TV System.

Why this product type is confirmed differently from a fixed media wall

A full height media wall is static: once the carcass is fixed to the wall, the job is largely done. A sliding panel system carries moving elements — panels that travel along a track, hardware that has to stay aligned after months of use, and a screen or artwork that sits behind them. Each moving element adds a tolerance that must be resolved on paper before manufacturing starts.

Santerson lists these systems as configurable products rather than fixed catalogue sizes. The product pages state that finish, layout and dimensions are specified per project, and they explicitly ask buyers to confirm dimensions, panel materials and mechanism requirements for each order. That is the practical difference from an off-the-shelf cabinet: nothing is decided until the site dimensions and the mechanism choice are on the same drawing.

1. Opening dimensions and how they were measured

Send the width, height and depth of the wall zone, and say how each figure was taken. A finished-floor-to-soffit height is not the same as a structural slab height; a tiled wall face is not the same as the plaster behind it. Sliding systems need clearances at both ends of the track and space for the panels to stack when open.

  • Overall envelope: width, finished height, available depth from the finished wall face.
  • Stack zone: how far the panels travel when open, and what sits in that path — a doorway, a corner, a light switch.
  • Floor condition: floor covering type and thickness, underfloor heating, and whether a threshold or bottom track can be fixed to it.
  • Wall condition: substrate material and its ability to carry the load of an upper track and hanging panels.
Where the wall is not square or the floor is not level, say so in the enquiry. Out-of-square openings are common in renovated villas and older apartment blocks, and they change both panel sizing and track fixing details.

2. Track, hardware and mechanism

The mechanism is the decision that shapes everything else. Panel count, panel width, weight and travel direction all follow from it. Santerson's related sliding collections are listed with made-to-measure sizing and material and finish options, and their pages ask buyers to confirm track, hardware and opening dimensions for each project — the same questions apply here.

Item to confirmWhy it matters before production
Top-hung or bottom-rollingDetermines what the wall must carry, and whether a floor track interrupts the finish.
Panel count and stacking sideSets panel widths and the clear stack zone.
Single or double trackA second track allows panels to pass each other; it costs depth.
Hardware duty class and finishMatching hardware to panel weight avoids sagging and hard running later.
Soft-close, push-open or handleless edgeChanges the panel edge detail, so it must be chosen before panels are made.
Replacement partsAsk which rollers and track components are stocked as spares for a project order.

3. What sits behind the panels, and how it is reached

The panels usually conceal something that still needs servicing: the television, a set-top box, a soundbar, a console, or a shelf of devices. Confirm access before the carcass is built.

  • Screen type and mounting: fixed to the wall, on an articulating arm, or recessed into an integrated TV panel. Each has a different fixing detail and ventilation need.
  • Ventilation: devices in a closed recess need an air path. State the device list and heat output early.
  • Reach and sightline: remote control line of sight, whether devices must remain usable with panels closed, and where sockets land relative to panel edges.
  • Cable routes: trunking positions, cable count, and where the pull-out points sit after the panels move through their full travel.

Where lighting is part of the design — a lit niche or an illuminated display section — confirm the electrical specification at the same time. Santerson's backlit feature wall listings ask for lighting specifications per project, and integrated LED sections need driver positions and a switching plan that the electrician can see on the drawing.

4. Panel materials and finish continuity

Panel faces are normally specified to match the rest of the joinery, so this is where sample approval matters most. Santerson's paneling range covers wood veneer, matte lacquer, textured and stone or marble looks, each listed with made-to-measure sizing and finish options.

  • Sample first: approve a physical sample of the panel face against the adjoining wood veneer panels or matte lacquer panels before the order is released.
  • Grain direction: state whether grain runs vertically or horizontally, and who decides at panel joints.
  • Edge detail: exposed panel edges are visible when open; confirm the edge banding or solid edge treatment.
  • Wear expectation: for a family living room or a hotel guest room, ask which finishes are specified for higher traffic.

5. Storage layout behind and beside the panels

Sliding panel TV walls rarely stand alone; they close off storage. Decide what is open, what is closed and what is hidden before production, because internal partitions are fixed once the carcass ships.

6. Delivery, site readiness and installation sequence

A made-to-measure sliding wall arrives in the middle of a fit-out, so the surrounding trades have to be ready for it. Santerson's service pages describe a workflow that runs from design consultation and material selection through manufacturing, project management and site coordination, then installation and handover; logistics covers freight by sea, air or rail with packaging and container loading arranged for the order.

  • First-fix dependencies: sockets, data points, driver positions and any structural fixing must be complete before panels are measured for final production.
  • Trade sequence: agree who sets the track, who makes good around it, and who hangs the screen.
  • Packaging and access: confirm panel sizes against lift doors, stair turns and corridor widths at the delivery address.
  • Snag stage: panel alignment and running action are checked on site after installation; leave time for adjustment before handover.

A short pre-production checklist

StageConfirmed item
Site surveyFinished dimensions, squareness, floor and wall substrate, stack zone clear of obstructions.
MechanismTrack type, panel count, travel direction, hardware duty class, opening method.
Behind the panelsScreen mounting, device list, ventilation, cable routes, socket positions.
AppearanceApproved panel sample, grain direction, edge detail, matching adjoining panelling.
StorageInternal layout, open versus closed sections, niche and lighting dimensions.
DeliveryIncoterms and delivery address, access route for long panels, installation responsibility.

Two points are worth repeating. First, do not release production on the basis of a rendering alone; the numbers that matter come from a site survey of the finished condition. Second, put the mechanism decision before the finish decision — panel size and edge detail follow from the hardware, not the other way round.

Send us your drawings