A raised panel wardrobe door cannot be priced from a single number. The profile on the door face, the board that carries it, the size of the carcass and the way the unit meets the wall all change what goes into the cost. Below is the information we ask for on every enquiry, and why each item matters, so that buyers, designers and builders can send a request once and get a comparable quotation back.

Why raised panel doors are quoted differently from flat doors

A flat slab door is one panel with one surface treatment. A raised panel door in our Raised Panel Wardrobes line is an assembly: a frame of rails and stiles around a central panel that stands proud of the frame, machined on both faces. That construction drives three separate cost lines — machining time on the door, the board specification behind the profile, and the hardware needed to carry a heavier leaf. Quote requests that only give a wardrobe width usually come back as a range rather than a price, because none of those three lines can be fixed yet.

The room data we need before anything else

Wardrobes of this type are made to measure for the opening they sit in, so we start with the space rather than the product.

  • Width, height and depth of each run, given as finished external dimensions, plus the floor-to-ceiling height at more than one point along the wall. Older villas and renovated apartments are rarely square, and a 15 mm difference across a four-metre run changes scribe widths and the door layout.
  • Position of skirting boards, architraves, light switches, sockets, air-conditioning grilles and door openings relative to the wardrobe line.
  • Whether the unit stops at the ceiling or is closed with a pelmet, and whether the ceiling itself is level.
  • For an alcove or recessed niche: the depth of the reveal on each side and whether the carcass should return into it.

A dimensioned floor plan, photographs from three angles and a short site note are usually enough. If drawings exist, send them; if they do not, we can work from measured photographs and confirm the sizes with you before production starts.

Door style, panel profile and how far the design goes

"Raised panel" covers a family of profiles, and the deeper and more moulded the profile, the more machining and finishing each door needs. When we quote, we ask which of these you are working to:

  • A classic raised panel, where the centre of the door is planed up from the frame — the look most often specified for traditional and cottage-style bedrooms.
  • A shaker profile, a flat centre panel inside a square frame, as in our shaker panel wardrobe design, which sits comfortably between classic and contemporary schemes.
  • A recessed panel, the inverse of raised, used where a flatter door face is wanted with the same framed language — see Recessed Panel Wardrobes.
  • A moulded or arched profile, where the frame itself carries curves; these need a drawing or a clear reference image before they can be priced.

Send a reference photograph or a drawing with the profile marked. Where you want the same door language repeated elsewhere in the project — paneled hinged doors, matching sideboards or integrated wall panelling — say so at enquiry stage, because repeat runs machined together cost less per unit than the same parts ordered separately.

Board material and surface finish

The substrate behind a moulded door must be suitable for machining a profile, and the finish determines how the edges of that profile read. We quote against what you specify, and we ask for four decisions:

ItemWhat to tell usWhy it changes the price
Door substrateSolid timber (for example oak, walnut or cherry paneled doors) or an engineered board with a moulded faceMachining time, movement allowance and finishing passes all differ
Carcass boardBoard type and thickness for the boxes, shelves and back panelsDetermines span of long shelves and fixing detail at the top
Surface finishPaint colour or lacquer system with a reference code, veneer species and grade, or melamine/acrylic decorCovering a raised profile takes more passes than a flat face; two-tone schemes add masking
SheenMatte, satin or high glossHigh gloss on a moulded profile needs additional sanding between coats

If you are matching an existing joinery item, send the make and model or a physical sample. Colour-matching from a photograph alone is not reliable, and we would rather flag that at quotation stage than at handover.

Internal layout and the hardware behind it

The inside of the wardrobe is where daily use is decided, and it is also a large part of the bill. We ask for the storage arrangement zone by zone:

  • Hanging areas — single or double hang, and whether long garments need their own bay.
  • Drawers — number, width, and whether they are internal drawers in a run or banked out of the carcass. Our drawer focused modular wardrobes layout is a useful starting point for bedroom storage.
  • Shelves — depth and spacing, plus where adjustable rather than fixed shelving is wanted.
  • Extras — trouser and jewellery trays, pull-out rails, shoe shelving, lighting inside the carcass, and a safe or ironing board bay if the project calls for one.

For hardware, tell us the door type and weight you expect, the hinge style ( concealed or visible, soft-closing or standard), drawer slide type and run, and whether handles are wanted at all. Handleless fronts need a different edge detail and a different pull system from a profiled door with knobs, and that detail has to be resolved before the door is machined.

Quantity, units and delivery terms

A quotation for one wardrobe and a quotation for forty bedroom units are prepared on different bases. For project enquiries we ask for:

  • Total quantity by unit type, with a room-by-room schedule where layouts differ between bedroom types.
  • Whether the units ship assembled or flat-packed — relevant to freight volume and to who fits them on site.
  • The delivery address, and your preferred Incoterms. We arrange sea, air and rail freight with customs paperwork and door-to-door delivery, so tell us how far you want us to carry the shipment.
  • The programme: when the units are needed on site, and whether the order is staged across phases or building blocks.

If you are sourcing for a villa or hotel fit-out outside China, sending the whole fixture schedule at once lets us place wardrobes, custom built-in kitchen cabinets, vanities and panelling on one production plan instead of three.

How our team works with the enquiry once it arrives

Our quotation process follows the steps set out for our design and custom service: a brief is reviewed, we come back with questions or a proposal, then details are confirmed before production. In practice that means:

  • We check the room dimensions against the door layout and flag anything that will not sit properly — a door that fouls a handle, a shelf that spans too far, a top run that cannot be scribed.
  • We return drawings with the profile, finishes and internal layout marked, for your sign-off.
  • We confirm dimensions and selected specifications in writing before cutting board. That confirmation is what protects both sides on a made-to-measure order.

A short checklist to send with your enquiry

  • Room dimensions at several points, plus skirting, switch and opening positions
  • Door profile — raised, shaker, recessed or a drawing of the moulding you want
  • Door substrate and carcass board specification
  • Finish with a reference code, sample or veneer species; sheen level
  • Internal layout by zone: hang, drawers, shelves, extras
  • Hardware type, and handles or handleless
  • Quantity by unit type, assembled or flat-packed
  • Delivery address, Incoterms and required on-site date
  • Drawings or photographs if they exist; the client and project name if the order is staged

Anything you cannot specify yet, say so plainly. We will propose an option and price it, rather than guess.

Ready for a quotation?

Send us the measurements, the profile reference and the finish you are working to, and we will come back with drawings and a firm price for your built-in wardrobe package — wardrobes, matching cabinetry and panelling produced together under one plan. Contact PHILLIP on +86-13928214007 or email santerson@qq.com, or use the form on our contact page.