A swim spa sits between two procurement worlds. It looks like a piece of outdoor leisure equipment on the drawing, but it behaves like a small mechanical plant once it arrives: pumps, filtration, water treatment, lighting and a control system all need power, access and a place to be serviced. That is where most enquiries go wrong. The specification sheet comes back with a model number and a photo, and nobody has recorded what the electrical supply has to deliver or which items are actually included.
Outdoor Swim Spa WS-125AⅢ is a useful example, because the catalogue entry for this model already shows the kind of information a buyer needs to confirm line by line. Below is how we build a specification that both sides can sign off on before production starts.
Start with the shell dimensions, not the features
The catalogue lists WS-125AⅢ at 5500 × 2300 × 1350 mm. Treat those three numbers as the starting point for a site check rather than a finished answer. External length, width and depth tell you whether the unit fits the terrace, setback or plant-room route you have planned, but they say nothing about clearance for the cabinet access panel, the delivery path from the kerb, or how much room the steps need in front of the entry point.
Write the site dimension into the specification next to the catalogue figure: the finished footprint, the clear opening on the access side, and the maximum overall height including any coping, decking edge or insulation layer you intend to add. If the spa is being set into a platform or surrounded by poolside furniture, record that too — loungers and a bar set need maintenance clearance around the filter pump, not just a pleasant arrangement.
Record what the catalogue actually states for this model
For WS-125AⅢ the published figures are as follows. Use them as your baseline column in the specification table and add a second column for "confirmed for this order".
| Item | Catalogue value for WS-125AⅢ | What to confirm before ordering |
|---|---|---|
| Model | WS-125AⅢ | Exact model code, including any suffix such as the -U variant |
| Catalogue dimensions | 5500 × 2300 × 1350 mm | Finished site footprint, access clearance, delivery route |
| Control system | 1 set | Controller type and mounting location |
| Swim training system | 1 set | Whether the swim current is required for this order |
| Water pump | 1 pc | Pump duty and quantity per selected configuration |
| Filter pump | 1 pc | Filtration route and service access |
| Jet total | 20 pcs | Jet layout and seating position it serves |
| LED lights | 3 pcs | Number and position of fixtures |
| Total power | 8.05 kW | Supply capacity, circuit protection and cable route at site |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Which features are included versus optional on your quote |
One habit saves a great deal of correspondence: do not merge the catalogue row and the quoted row into one column. When a buyer and a factory both read "Jet total: 20 pcs" without a confirmation column, each assumes the other has verified it against the order.
Do not compare model codes as if they were configurations
Codes that look adjacent are often different products. The WS-125AⅢ-U shares the same 5500 × 2300 × 1350 mm shell as WS-125AⅢ, but its published equipment list differs: four water pumps instead of one, a jet total of 23 rather than 20, one LED light instead of three, and a total power figure of 11.85 kW against 8.05 kW. The swim training system is not listed for the -U version.
That difference changes the electrical work at the villa far more than it changes the look of the unit. If your architect has sized a supply around one figure and the order ends up with the other model, the fix happens on site at the worst possible moment. State the full model code — suffix included — in the specification header, in the packing list request and in the proforma invoice description.
Size the electrical scope as a separate line
The catalogue total power figure is a starting value for coordination, not an instruction to your electrician. Before ordering, ask for the connection details of the confirmed configuration: supply voltage and phase, running current, circuit protection, earthing and bonding arrangement, and where the isolator should sit relative to the cabinet. Then have the local electrical contractor confirm that the planned supply covers it.
For projects in Australia we would rather see this settled during design than at handover. Import rules, licensed-requirement questions and local wiring practice vary by state and by council, and they are decided by your local contractor and certifier — not by a supplier's catalogue. Our role is to give the exact equipment list for the configuration you have chosen so that the local party can price and approve the electrical work properly.
List options separately from the base unit
Catalogue-listed options across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs its own line with a yes or no against it. Two of them drive site decisions:
- Heat pump. It changes the power calculation and usually the noise profile, which matters when the spa sits near bedroom windows or a neighbour's boundary.
- Insulation. It affects the shell build-up and therefore the finished dimensions you recorded in step one.
If you want an alternative water-treatment approach, ask for it explicitly rather than assuming the catalogue default. Ozone appears as a standard feature on this model; UV sterilization is listed among options, and whether they are combined or substituted should be written down.
Match the spa to how it will actually be used
A specification is easier to defend when it records the intended use. Three different briefs produce three different configurations:
- Daily lap training. The swim training system and the flow it produces are the priority; jet count matters less than current quality.
- Hydrotherapy and recovery. Jet layout, seating depth and water temperature stability lead the discussion. Our swim spa with massage jets, LED and water features sits at this end of the range.
- Family leisure and entertaining. Water depth, entry steps, lighting and how the spa relates to the surrounding terrace furniture carry more weight than pump count.
Where a villa project needs an unusual footprint — a curved wall, an internal courtyard, a non-rectangular room — the standard catalogue shell may not be the right answer at all. We also produce customised outdoor spas in square, round, oval and curved shapes, which is a different specification conversation: shell form first, then equipment.
Run the whole pool category through one coordination sheet
Swim spas rarely arrive alone. A villa package normally includes loungers, dining and shade structures alongside the water feature, and each item has its own delivery date and its own site prerequisite. Keeping the spa in a separate email thread from the rest of the outdoor scope is how projects end up with a crane booked for a unit that cannot be placed because the decking was poured first. The Swimming Pools and Swim Spas category is best treated as one line group on your coordination sheet, with dates and site conditions aligned against the rest of the package.
A pre-order checklist
- Full model code with suffix written the same way in every document
- Catalogue dimensions plus finished site footprint and access clearance
- Equipment list copied line by line, each row marked confirmed
- Total power figure carried into the electrical scope and signed off by the local contractor
- Options listed with yes/no, including heat pump, insulation and sterilization choice
- Jet layout and LED positions agreed against seating arrangement
- Delivery route from kerb to final position checked for width, height and turning room
- Steps, coping and surrounding furniture shown on the same site drawing as the shell
- Spares and service access identified before the enclosure is built
Figures quoted here are transcribed from the published catalogue entry for WS-125AⅢ. Included equipment, electrical requirements and available options vary by configuration, so confirm them against your quotation before ordering.
Send us your draft specification
If you are specifying a swim spa as part of a villa or hospitality package, we can review it against the confirmed configuration — equipment list, power requirements, options and coordination with the rest of the outdoor scope. Our turnkey project service covers design coordination through to delivery and installation support.