An outdoor swim spa is one of the few amenities a resort or serviced-apartment project can monetise directly, yet it is also one of the hardest line items to lock down on time. The Outdoor Swim Spa WS-PC08T sits in the middle of our configurable swim and hydrotherapy range, and buyers keep asking us the same handful of questions about it. This guide walks through those questions in the order a procurement team actually has to answer them.

What the WS-PC08T Is Designed To Do

The WS-PC08T is an eight-metre outdoor unit built around two separate jobs: lap-style swimming against a counter-current, and hydrotherapy for guests who want jets rather than lengths. The catalogue lists it at 8000 × 3000 × 1500 mm, with a swim training system, a control system, a filter pump, twenty-eight water jets, three LED lights and ozone sanitation. Total installed power is listed at 10.85 kW.

That footprint matters more than the feature list when you are testing a site layout. A spa of this size needs a clear rectangle roughly eight metres long and three metres wide, plus working space around it for circulation, plant access and housekeeping routes. If your pool deck was drawn before the spa was specified, this is usually the point where the landscape architect gets a phone call.

Where It Fits in a Hospitality Programme

In practice the WS-PC08T works best where a project needs one shared wellness asset rather than a full pool plant. We see it specified for boutique hotels and resorts with a limited outdoor area, serviced apartments and apart-hotels that want a fitness and recovery offer without a licensed pool operator on duty all day, villa and estate developments sold as part of a lifestyle package, and gym or spa extensions where a lap pool was never affordable.

The jet count is what separates it from a pure swim unit. Twenty-eight jets means the same vessel can run as a recovery pool after classes or a treatment add-on, which is why operators often place it adjacent to a gym or treatment room instead of burying it in the garden.

Reading the Specification Sheet Properly

ItemCatalogue figure
ModelWS-PC08T
Catalogue dimensions8000 × 3000 × 1500 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc / 1 pc
Jet total28 pcs
LED lights3
Total power10.85 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Treat these as catalogue figures for the base configuration, not as a finished bill of materials. The number that most often surprises a project is total power: 10.85 kW is a substantial dedicated load before you add heating. Electrical capacity, cable routing and the location of the isolator need to be settled with the M&E consultant early, because they drive cost far more than the spa itself if they are left late.

Our catalogue records the figures above as shown on the product page. Included equipment and electrical requirements change with the selected configuration, so confirm both against your signed specification before any site preparation begins.

Options That Change the Number You Actually Pay

The optional accessories in our catalogue are where a project's real cost and running profile get decided:

  • Heat pump. The single biggest driver of guest usability. A spa that is not heated to a comfortable temperature in shoulder season sits empty, so decide the target water temperature and the seasonal use pattern before you price the plant.
  • UV sterilisation alongside the standard ozone. Relevant where guest turnover is high and you want to keep chemical dosing modest.
  • Sand filtration. A different filtration route from the base filter pump; compare running costs and backwash arrangements with your facilities team.
  • Insulation. Often treated as optional and then regretted. In cooler or windy exposed sites it materially reduces heat loss overnight.
  • Steps and access. Affects both guest experience and accessibility review; agree the entry arrangement with the design team rather than at handover.
  • Additional water pumps and control systems. Configuration-dependent, and availability varies by model.

Comparing It Against Neighbouring Models

Buyers usually shortlist within the same eight-metre family, so it is worth knowing what changes between them. WS-PC08ST is narrower and slightly shallower at 8000 × 2400 × 1470 mm, with a lighter jet package and lower total power — a sensible answer when deck width or electrical capacity is the binding constraint. WS-PC08U keeps the same 8000 × 3000 × 1500 mm shell but shifts emphasis toward jet count and pump quantity. If the width of that shell is simply too much for your terrace, our wider Swimming Pools and Swim Spas range covers shorter and differently proportioned units.

Where a project needs a specific shape or a spa built into a terrace edge, we also produce customised outdoor spas to a defined outline. That route takes longer to detail, so bring it to us at concept stage rather than at tender.

The Procurement Sequence We Recommend

1. Fix the location before you fix the model

Confirm structural support, drainage, wind exposure and privacy screening first. A spa is a water-filled vessel with a permanent load; the slab or deck beneath it must be designed for that, not adjusted afterwards.

2. Issue one specification sheet, not three

Base unit, options, and the electrical and plumbing interface belong on a single document signed by the client, the M&E consultant and the supplier. Splitting them across trades is where scope gaps appear.

3. Confirm the configuration in writing before production

Included equipment varies with the selected build. A written configuration sheet listing pumps, jets, lighting, sanitation and insulation removes the argument later.

4. Plan delivery and lifting as a line item

An eight-metre shell needs a route to site that can accept it. Craning over a building or through a narrow street changes the price, so confirm access with your logistics coordinator before the shipping method is booked. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking.

5. Book commissioning and handover training

Handover should include water chemistry, filter cycles, control-system operation and a documented maintenance routine agreed with the operator. A spa handed over without trained staff is the fastest way to a warranty claim.

Buying It Inside a Wider Fit-Out

Specifying a swim spa separately from the rest of the outdoor and wellness package tends to create interface problems: decking finishes that do not meet the shell, lighting that clashes with control locations, and loungers delivered by a different vendor on a different date. As a Hospitality Project Furnishing supplier we coordinate poolside furniture, outdoor lounging, bathroom fixtures, lighting and finishes alongside the spa under one programme, through our six-stage workflow of consultation, design and planning, production, logistics, installation and after-sales. For buyers sourcing several categories from China, that single point of coordination is usually worth more than any individual unit price.

A Short Checklist

  • Deck rectangle confirmed with circulation and plant access, not just the 8000 × 3000 mm shell
  • Dedicated electrical capacity sized against the configuration's total power
  • Heating target and insulation decision made before pricing
  • Sanitation route agreed (ozone as standard, UV if specified)
  • Access, lifting and crane requirements surveyed
  • Written configuration sheet signed before production starts
  • Maintenance routine and operator training included in handover

Send us your swim spa enquiry

Tell us the site, the guest profile and the target water temperature, and we will confirm which configuration of the WS-PC08T fits — including options, electrical interface and delivery route.

Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com

Contact SANTERSON