Open modular wardrobes are one of the easiest built-in items to get wrong on a residential or fit-out project, and one of the most expensive to fix after installation. Because there are no doors hiding the carcass, every dimension, edge detail and storage zone is visible in the finished room. The good news is that the same openness that exposes mistakes also makes these units straightforward to specify — if your procurement brief answers the right questions before production starts. Below is the sequence we use on our own wardrobe projects, and what we ask buyers, designers and contractors to confirm at each stage.

Why open modular wardrobes are specified differently from closed ones

A hinged or sliding door wardrobe tolerates a degree of variation inside the cabinet: shelves can be slightly uneven, hanging heights can be approximate, and the interior board colour rarely matters once the doors go on. An open modular wardrobe removes that tolerance. The carcass becomes the design. That changes three things in a procurement brief:

  • Finish quality moves from the doors to the body. Edge banding, visible side panels and shelf fronts all need a stated finish, not an assumed one.
  • Internal layout becomes external layout. Hanging zones, drawer banks and shelf bays must be drawn as they will be seen, because they are the façade.
  • Dust, sun exposure and tidiness become client-facing issues. The brief should record who advised the client on storage habits, since open storage asks more of the end user than closed storage does.

Start with the room envelope, not the catalogue

Modular means the unit is assembled from standardised modules; it does not mean the opening has to match a fixed size. On our projects we ask for a measured survey of the wall before any module split is proposed: finished floor level, finished ceiling or soffit level, skirting detail, door and switch positions, and — critically — which surfaces are true and which are out of square. A run that measures 2,410 mm in one corner and 2,385 mm in the other will not be corrected by the wardrobe; it is corrected by scribing, a shadow gap or an out-of-plumb carcass, and each of those has a cost and a visual consequence.

Our made-to-measure sizing covers the overall envelope and each module within it, so the brief only needs to be precise about what the site actually gives us. Specify the opening width, height and depth at three points along the run, note the floor finish build-up above slab, and state whether the unit runs to the true ceiling or stops below a service zone.

Decide the storage mix before you choose a look

Once the envelope is fixed, the next decision is what each module does. This is where most briefs are too vague: "wardrobe with shelves and hanging rail" cannot be priced or produced. Break the run into zones and give each one a job:

  • Hanging zone — single or double hang, and the garment lengths that drive rail heights (long coats need noticeably more drop than shirts).
  • Drawer bank — number of drawers, and whether they sit in a dedicated drawer-focused module or under open shelving.
  • Shelf bays — what sits on them, since folded stacks, boxes and display objects each want different bay heights.
  • Open display sections — where styling is expected, which affects shelf depth and lighting provisions.
  • Tall or end returns — the vertical termination of the run, often where a project looks cheapest if left undecided.

Where a project needs both open and closed storage in one wall, say so explicitly and identify which modules are open. Our Combination Modular Wardrobes exist for exactly that situation, and naming the mix in the brief prevents a quotation that assumes one or the other throughout.

Name the material and finish family in writing

"White wardrobe" is not a specification. For open units, specify at least four surfaces: exterior carcass panels, interior carcass panels, shelf fronts and edges, and drawer fronts plus hardware. Then name the finish family for each. Our wardrobe range covers melamine, lacquer, wood veneer, acrylic, solid wood and glass-fronted options, and those families behave differently under the same lighting and the same wear.

Finish familyWhat to watch on an open unit
MelamineBoard colour and texture must match across carcass, shelves and edges; edge banding is visible on every exposed side.
LacquerVery even surfaces, but sheen level and light reflection change how fingerprints and dust read on open shelving.
Wood veneerGrain direction and tone variation are visible across the whole run; state grain orientation for shelf fronts.
Solid woodMovement with humidity matters more where panels are exposed on both faces.
Glass and metal frameFramed modules read as design lines, so their positions must align with the storage grid.

Our material and finish options are project-specific, so the brief should carry the reference or sample code you approved rather than a colour name. Where several finishes appear on one wall, list which modules carry which finish — that is the detail most often left to chance.

Give the tolerances and interfaces someone has to own

Open wardrobes meet other trades at more points than closed ones do. Put each interface in the brief with an owner and a decision:

  • Floor — is the unit installed on the finished floor or set into it, and how is the plinth or shadow gap handled?
  • Ceiling and lighting — does a soffit exist, are recessed lights coordinated with shelf lines, and is integrated lighting inside the wardrobe scope or the electrical scope?
  • Adjacent wall finishes — wall panels, plaster and skirting must be resolved against the carcass edge, since there is no door frame to absorb a poor junction.
  • Doors and openings — confirm swing clearance in front of every hanging zone.

We also ask for the structural check on any wall the unit fixes to, because open units carry their load visibly and fixing detail depends on substrate. If a run exceeds a single module width, state whether it is one continuous assembly or separate runs with an expansion joint.

Write the drawing set so production and site agree

A workable wardrobe specification package for an open modular run contains four items. If your brief attaches all four, quotations become comparable between suppliers:

  1. Elevation of each face, with the module grid dimensioned and every open bay labelled.
  2. Internal layout drawing showing rail heights, shelf positions and drawer stacks — for an open unit this can be combined with the elevation.
  3. Finish schedule listing each surface, its finish reference and its edge treatment.
  4. Interface details at floor, ceiling and returns, plus lighting provisions.

We work from project drawings and coordinate production against them; where a buyer has only a concept image, we start with design and planning before quoting. That step is worth budgeting for on open units, because a change after cutting costs more than the change itself.

What to include in the RFQ line item

A wardrobe line that can actually be priced and installed reads like this:

  • Room, wall reference and measured opening (width × height × depth at three points).
  • Module split with open and closed sections identified by name.
  • Storage zones: hanging drop heights, drawer counts, shelf bay heights.
  • Finish schedule with sample references for carcass, shelves, edges and drawer fronts.
  • Hardware: handle or handleless, rail type, soft-close provision.
  • Interfaces: floor build-up, ceiling condition, lighting scope split.
  • Delivery route and installation responsibility, including who carries out the site survey and final inspection.

For projects sourcing built-in joinery alongside other fit-out items, it is worth grouping wardrobes with cabinetry and panelling in one procurement package. Shared board colours, matching edges and a single production run are what keep a whole apartment or villa consistent — which is why built-in furniture tends to be specified as a family rather than room by room.

Delivery, installation and handover clauses that save rework

Open modular units arrive as panels and modules, so the logistics and installation sections of the brief matter more than buyers expect. Confirm packaging and pallet marking by room and module reference, the delivery address and access route, and who stores the components on site until other trades finish. For projects shipped from our factory, we handle freight by sea, air or rail with customs paperwork and door-to-door delivery; the brief should still name the receiving party and the internal transport arrangement.

At handover, inspect what will be visible every day: edge condition after handling, shelf level across the run, drawer alignment, and whether the finished layout matches the approved elevation. We provide installation support and a snag inspection as part of project delivery; whatever the arrangement on your job, write the inspection into the programme rather than leaving it to the end.

Practical note: dimensions, finishes and configurations on our wardrobe pages are set per project. Treat published product information as the starting point for a quotation, and confirm the measured sizes and selected specifications for your own job before anything goes into production.

Frequently asked questions

Can an open modular wardrobe be made to a non-standard ceiling height?

Yes. Modules are sized to the measured opening, and a top closure panel or filler handles a run that does not reach the soffit cleanly. The brief needs the finished ceiling level, not the structural slab level.

Do open modular wardrobes work in bedrooms only?

They are most common in bedrooms and dressing rooms, but the same module logic appears in hallways, walk-in robes and utility areas. What changes is the storage mix — hanging drops versus shelf bays — and how much dust exposure the client is prepared to manage.

How do I keep an open wardrobe wall consistent with kitchen cabinetry on the same project?

Specify one board and edge palette across both. Name the finish reference once in the project schedule and apply it to wardrobe carcasses, shelving and cabinetry fronts, so a single production run covers all of them.

What is the most common mistake in a wardrobe procurement brief?

Leaving the internal layout to the supplier. On an open unit that layout is the appearance, so it needs to come from the design team with garment lengths and shelf contents stated.

If you are assembling a wardrobe or joinery package for a villa, apartment or hospitality job, send us the room drawings and finish references and we will confirm the module split, materials and configuration for your opening. See our turnkey interior project solutions for how built-in joinery coordinates with the rest of the fit-out.