A freestanding cabinet looks simple on a drawing until it has to be manufactured, shipped and installed in the right room at the right size. Because our freestanding cabinets are made to measure rather than picked from a stock catalogue, the quotation you receive is only as good as the information you send with your enquiry. This guide walks through exactly what to prepare, what we ask for, and how our Custom & OEM Service turns that information into a firm price.

Why Freestanding Cabinets Are Quoted Per Project

Our freestanding pieces are configurable products. For each one we can adjust the dimensions, choose the material and finish, and adapt the internal layout to the space it will stand in. That applies across the ranges we supply:

Because size, material and layout are all variables, we do not publish a single price list for these units. What we can do is quote accurately once the enquiry contains the right details. If you are also specifying Freestanding Open Wardrobes or other built-in joinery for the same building, send everything together — grouped enquiries make production and shipping far simpler.

Information to Prepare Before You Write to Us

You do not need finished drawings to start a conversation. The items below are what we work with; if one of them is missing, tell us and we will help you fill the gap.

1. Room, project type and quantities

Tell us whether the cabinet is for a bathroom, bedroom, living room, lobby or guest suite, and whether the project is a private villa, a hotel or resort, an apartment block or an office fit-out. Give the number of units per type and per floor or unit type. A hotel enquiry that says "48 guest rooms, two room types" tells us far more than "about 50 cabinets", and quantity directly affects how we schedule production.

2. Dimensions and clearances

Send the width, height and depth you want, plus the available wall length and any fixed constraints: doors that swing into the space, skirting or cornice depths, pipes, power outlets, light switches and floor finishes that change the final floor level. For bathroom units, note where the basin, vanity or mirror sits relative to the cabinet. If you have a scaled floor plan, send it — a plan answers most of our questions in one file.

3. Material and finish

Our Custom Furniture Materials and Finishes options cover bespoke textures, surfaces and materials, so be specific: solid wood or engineered board, veneer species, lacquer or melamine surface, matte or high-gloss, and the colour reference you are working to. A paint code, a photograph of an existing finish, or a sample you already hold all help us match what you expect rather than what we assume.

4. Internal layout and hardware

Decide what the cabinet has to hold. Shelves for towels, drawers for linen, a closed lower section with open display above, glass front panels for a display unit, integrated lighting inside a case — each choice changes how the carcass is built. Mention doors you want (hinged, sliding or glass), handle style or a handleless detail, and any soft-close hardware preference.

5. Delivery location and site conditions

Give the delivery city and, for multi-unit projects, whether goods go to one central site or several. Lift sizes, stair access and floor level matter for tall units. Our Furniture Logistics and Door-to-door Delivery service covers freight by sea, air and rail together with the export paperwork, so the destination you name determines what we quote for transport.

What We Ask You to Confirm During the Enquiry

Our questionWhy it changes the price
Is this one-off or repeated across units?Repeated layouts are produced as a run; single bespoke pieces are built individually.
What is the target floor-to-ceiling height of the room?Full-height and made-to-measure sizing need different carcass construction and packing.
Which finish reference should we follow?Matching an existing joinery finish takes more sampling than choosing from our standard finishes.
Are glass panels or internal lighting required?Glazing, wiring and lighting add components that must be specified before production.
Who installs on site?Our Furniture Installation and After-sales Support team can work with your builder, or the units arrive for your own fitters.
Do you need samples before committing?Sample and prototype stages sit before bulk production and affect the overall programme.

How the Quote Is Prepared

Once your enquiry is with us, we follow the same sequence as for any other project. Our Interior Design Services team can start from space layout planning and produce Furniture Layout and 3D Interior Rendering, so you see the cabinet in its room before anything is cut. From there we confirm details with you — dimensions, material, finish, hardware — and issue a quotation that itemises unit price, packing, freight and any installation support. Production follows only after you approve those details.

For larger buildings, we usually quote the freestanding cabinets alongside the related built-in work — wardrobes, vanities, kitchen cabinetry and wall panelling — as one package. That is where working with a single One-stop Furniture and Building Materials Supplier saves you money and time: one production schedule, one container plan and one point of contact instead of several suppliers working to different drawings.

Working With Us on Australian Projects

Australian clients order furnishing packages from us for villas and hospitality developments, and our Australian Villa Furniture Projects pages include work in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Send your enquiry with floor plans measured in millimetres and note the delivery city, so we can plan Furniture Freight by Sea Air and Rail to the nearest port and coordinate handover at the site address rather than a depot.

Please treat lead times, freight rates, import duties and warranty terms as project-specific. We confirm these in writing for each order after your quantities, destination and specifications are fixed — we do not quote them from a standard table.

Example Enquiry You Can Adapt

Use this shape of message as a starting point, and we will come back with an indicative price once we have read your drawings:

Subject: Quote request — freestanding bathroom cabinets, 12 units

Body: Project: villa development near Brisbane. Six villas, two bathrooms each. Cabinet size approximately 900 mm wide x 450 mm deep x 850 mm high, to sit beside the vanity; floor plan attached. Finish: matte lacquer in warm grey to match a sample we can send you. Layout: two drawers over one open shelf, soft-close runners. Doors and handles as per our drawing. Please quote ex-works and door-to-door delivery to the site, and advise what else you need from us to firm up the price.

What Happens After You Send Your Enquiry

  • We read the drawings and dimensions, then come back with clarifying questions before pricing — this avoids rework later.
  • You receive a quotation covering the units, packing and the freight option you asked for, plus any design or sample stages.
  • After your approval, we produce the cabinets and keep you updated through production and quality control.
  • We arrange packing, container loading and shipping documents, then track the shipment to your site.
  • On arrival, installation support, inspection and after-sales cover are available for whatever project scope we agreed in writing.

Send Your Enquiry

If you want a price for freestanding cabinets, wardrobes or any other item in our range, send your plans, quantities and finish references through the contact page and we will reply with a quotation. The more detail you give at the start, the closer the first number is to the final one — and the less chance of a change order once production has begun. That contact page also lists our offices in China, Vietnam, Singapore and South Africa.