A Santerson Sliding Panel TV System is made to measure for each project, with finish, layout and panel dimensions agreed before production starts. That flexibility is the reason a written installation plan matters: the panels arrive sized for one opening, on one wall, with one set of services behind them. Where the plan is incomplete, the site team improvises, and improvised joinery work is where media walls lose budget and finish quality.

The sections below set out what to settle before production is released, so the wall can be installed in one visit rather than several.

Why a sliding panel media wall needs its own installation plan

Sliding panels move. A fixed Santerson Full Height Media Wall only has to sit flat against a prepared surface; a sliding system has to carry weight along a track, clear the floor covering, and stay aligned after the room has been used for a season. Three things have to be true at once: the substrate is straight and able to take the load, the opening geometry matches the panel layout, and the television, sockets and cabling are exactly where the drawings say they are.

Because these systems are configured per project rather than ordered from a fixed size list, dimensions, panel materials and the sliding mechanism are confirmed before manufacture. The installation plan records those confirmations in a form the site team can follow.

Site survey: the measurements that decide everything else

A surveyed drawing is more useful than a design-stage sketch. The information to provide:

  • Overall width and height of the wall, taken at several points, plus the floor-to-ceiling height at both ends of the run.
  • The position of fixed obstructions: beams, columns, skirting, light switches, air diffusers and door reveals.
  • Finished floor level, with the floor build-up noted, so the lower track or guide sits at the right height above the covering.
  • Wall construction and its fixing method. Plasterboard, masonry and timber framing each need different fixings and, in some cases, additional backing.
  • Photographs of the wall before and after first fix, from both ends of the run.

If the wall is not square or the floor falls across the run, raise it at survey stage. That information changes how panel sizes are set out, and it is far cheaper to absorb in a drawing than on site.

Panel layout, travel and clearances

Fix the operating layout on paper before anything is cut:

  • How many panels slide, which direction each one travels, and where each panel parks when open.
  • The overlap between panels, so no gap appears at the meeting edges when the system is closed.
  • Whether the panels run on an upper track, a lower track or both, and what happens at the ends of the track.
  • Clearance for handles, profiles and any reveal between panel face and adjacent wall or joinery.
  • The opening you actually need in daily use: the television viewing position, the shelf access behind the panels, and whether a person can stand in front of the wall while a panel is moving.

Where the brief calls for storage as well as a screen, specify both systems in one finish. Santerson Sliding Storage Panels use the same panel language as the media wall, so faces, edges and profiles can be matched across the room instead of repeating the same decision twice. Where panels from more than one system meet on the same wall, record the junction detail in the plan as well.

Television, services and cable routes

This is the section most often left out of a joinery drawing, and it causes the most return visits. For each screen on the wall, record:

  • Screen size, its weight, and the bracket type and fixing method you intend to use.
  • The exact centre height and the recess or opening dimensions around it.
  • Where power, data, aerial and HDMI points sit relative to that centre, and whether they are reachable once the panel is closed.
  • How cables pass behind a moving panel. A route that works for a fixed panel can bind or pinch when a panel slides past it.
  • Ventilation to the equipment bay if devices sit inside the enclosure, and how they are reached for servicing and remote control operation.

If the design includes lighting, settle that at the same time. Santerson Backlit Feature Walls sit in the same Media & TV Walls range and treat the same wall zone as an illuminated surface, so where lighting is combined with sliding panels the driver positions, access and circuit details need to be on the drawing before the panels are made.

Finishes, materials and how they will be protected on site

Confirm in writing which finish has been selected for the panel faces, and how that finish behaves next to adjoining materials. Veneer, lacquer, glass and textured panels take light differently, so review a sample under the room's actual lighting before production is released.

  • Approved finish samples referenced by name on the drawing, with one signed set held on site.
  • Edge and profile details where panel faces meet glass, stone or metal trim.
  • Which trades are allowed to work near the panels after delivery, and who signs off protection.
  • Storage conditions between delivery and installation: upright, dry, and out of other trades' traffic routes.

Sequencing, access and delivery

A made-to-measure wall system is scheduled late in the programme by design. Before it ships, confirm:

  • Painting, flooring and first-fix services are complete on that wall.
  • The delivery route to the room is clear, and the panels will pass lifts, stairwells and doorways intact.
  • Who prepares the substrate and who installs the system, and on which dates.
  • Whether other joinery in the same finish, such as media storage, shelving or wardrobes, is installed in the same visit to keep finishes consistent.

SANTERSON's services cover design coordination, production, logistics and door-to-door delivery, then installation support with inspection and snagging at handover. Naming those stages against real dates in the plan is what keeps a media wall from becoming a punch-list item that runs into the next trade.

Handover checklist

  • Panels travel smoothly over the full length of their run, with no binding at the ends.
  • Gaps between panel edges are even when closed and when open.
  • The television, sockets and any lighting operate with panels both open and closed.
  • Fixings, tracks and guides are secure after several open-close cycles.
  • Finish is clean on all visible faces, including edges that show when a panel moves.
  • Snag list signed, with spares and care instructions handed to the client.

What the enquiry should carry

If a media wall has to hide a screen, hold storage and still read as a designed surface, the enquiry should carry the surveyed dimensions, the wall construction and the services layout. With those three items, panel sizes, materials, finish and mechanism can be confirmed for that opening, and drawings returned for the site team to build to, with installation support at handover.