A glass modular wardrobe quotation can look complete on paper and still leave the expensive decisions undecided. Two proposals from two manufacturers may both state made-to-measure dimensions, both quote a full-height glazed unit, and both arrive with elevations attached — yet one includes the door system, the glass make-up and the fitting sequence, while the other quietly assumes them. This guide walks project buyers, contractors and interior consultants through what to look for in a proposal before it becomes a purchase order.

Start with whether modular is the right system at all

Modular wardrobes are built from repeatable carcass modules — hanging sections, drawer-focused sections, shelf-focused sections and combinations — assembled to fit a wall run. That construction suits bedrooms with straightforward runs and standard storage mixes, and it suits multi-unit work where the same detail repeats across several rooms. Our Glass Modular Wardrobes sit in that family: made-to-measure sizing, selectable materials and finishes, and a layout drawn to the project.

Where the room is irregular, where the storage brief calls for a dressing room you can walk into, or where the design intent is a glazed shell around an interior fit-out, ask the manufacturer to justify why modular modules are being used rather than a walk-in layout. A proposal that simply defaults to modular because it is easier to price is worth challenging. For bedroom layouts with floor space to spare, compare the modular quotation against Glass Walk in Wardrobes on the same drawings and see which system delivers the storage and sightlines the design actually asked for.

The line items that reveal a serious proposal

Read the quotation as a set of commitments, not a price. A manufacturer who has thought about your job will have written down the following; a manufacturer who has not will leave them to be discovered during production.

Line itemWhat a complete proposal statesWarning sign
Dimensions and datumsOverall width, height and depth per module, with heights referenced to a stated floor datum and notes on out-of-level walls or ceilingsA single "as built" note with no measurement record or site survey date
Glass specificationColour and surface of each glazed panel — clear, bronze, smoked or frosted — plus the glass type, thickness and edge treatment"Glass door" only, with no make-up, so a cheaper option is supplied by default
FramingFrame profile, finish colour and how the frame meets the wall and ceiling, including scribe or filler panelsFraming shown in the rendering but absent from the bill of quantities
Door systemHinged, sliding or folding; number of leaves; track, runner and hinge make and load ratingDoor type inferred from a picture rather than written into the specification
Interior configurationShelf spans and thickness, drawer count and runners, hanging rail positions, integrated lighting if requiredA generic "internal fit-out included" line with no layout drawing
Substrate and fixingsWall construction the unit is fixed to, fixing method, and who prepares the openingSilence on structural support, leaving it as a site surprise
Scope boundariesExplicitly lists what is excluded: trades, electrical connection, making good, protective film removalNo exclusions section at all, which usually means the buyer absorbs them

Check that the glass and the frame are specified together

Glazed wardrobe doors fail in two ways: the panel itself, and the way it is held. A proposal that names only "glass" invites substitution later. Ask for each glazed element to be described as a make-up — glass type and thickness, whether the surface is clear, frosted or textured, and how it sits in the frame. Our Aluminum Frame Glass Wardrobes are specified as framed glazed leaves, which is the detail you want to see written into any proposal you receive: frame material, frame colour, and the panel held within it.

Then check that the door system matches the room. Sliding leaves need clear run space and a track detail that tolerates the floor finish; hinged leaves need clearance in front of the opening; folding leaves need hardware rated for repeated use. If the proposal shows sliding doors but the drawings leave no room for the leaves to pass, raise it before production — this is one of the most common and most costly corrections on site.

Practical test: cover the price column of the proposal with your hand. If you cannot still tell what will be delivered — glass make-up, frame finish, door system, interior layout, fixing method — the document is a budget indication, not a proposal. Ask for it to be reissued.

Judge the manufacturer's process, not just their price

A wardrobe is only as good as the coordination around it, so ask how the quotation was produced and what happens next. A supplier working to a defined sequence will describe project brief and design proposal first, then quotation and detail confirmation, then production, shipment and follow-up — with drawings and production coordination handled between those stages rather than improvised afterwards.

  • Who draws the elevations? If the manufacturer prepares them from your room dimensions, ask what happens if site dimensions move after approval, and who pays for the revision.
  • What is confirmed before production starts? Written sign-off on finish samples, glass colour and interior layout should be a named gate, not an assumption.
  • How are custom requests handled? Bespoke finishes, textures and prototyping belong in the proposal narrative. Where you are buying under your own brand or for resale, ask how private labelling and packaging are priced.
  • What is the order quantity assumption? Minimum order quantities shape unit price on multi-unit jobs; a proposal that ignores them is not costing your real order.
  • How does delivery reach the door? Freight mode, packing and container loading, customs paperwork and the delivery point should be stated so you know where the supplier's responsibility ends.
  • Who installs and what follows installation? On-site installation, inspection with a snag list, spare parts and maintenance response should appear in writing, with terms and exclusions named rather than implied.

Compare like with like across proposals

Set every quotation into the same table before you decide: scope included, scope excluded, glass make-up, door system, interior layout, delivery terms, installation responsibility and after-sales terms. Differences in price usually trace back to a difference in one of those columns rather than to efficiency. A lower figure that omits track hardware, filler panels or making-good is not cheaper — it is unbilled.

Before you sign: seven questions to send back

  • Which glass type, thickness and surface finish is included for each glazed panel?
  • Which door system, hardware brand and load rating are quoted?
  • Is the interior layout drawn, or will it be decided during production?
  • What wall preparation and structural support do you require from the site team?
  • Where does your scope end — delivery point, installation, electrical connection, making good?
  • Which finish samples must I approve in writing before production begins?
  • What are the warranty terms, response commitments and spare-parts arrangements after handover?

SANTERSON manufactures made-to-measure modular and walk-in wardrobes alongside the cabinetry, doors, panels, lighting and bathroom fixtures used across the same project, so a wardrobe proposal can be read against one coordinated package rather than several disconnected suppliers. Send us your drawings and storage brief and we will return elevations, a specified bill of quantities with exclusions stated, and finish options for review.