A wall-hung toilet looks simple on a drawing. It is one of the few bathroom fixtures where the specification has to be correct before the wall is closed, not after. If you are sourcing the Wall Hung Toilet 1038W, Rimless Ceramic Wall Mounted WC for Modern Bathroom for a villa, apartment or hotel room package, a short list of confirmed details in your first message to the supplier is usually what decides whether the quotation comes back in a day or drags on for weeks.

Below is what we ask project buyers, contractors and designers to have ready. It mirrors the information we need on our side to quote, produce and ship sanitary ware as part of a wider fit-out order.

1. The drainage layout: trap type and rough-in

This is the item that causes the most rework. A wall-hung WC is fed by a concealed cistern and discharges into the wall, so the outlet arrangement has to match what the site is actually building. The 1038W page describes an 180 mm P-trap wall drainage arrangement with a compact bowl size suited to smaller bathrooms, and is mounted with a concealed tank system.

Before you send an enquiry, confirm from your plumbing drawings:

  • Whether the outlet is a wall (P-trap) or floor (S-trap) arrangement. If the site has a floor outlet, a two-piece model such as the Two Piece Washdown Toilet 1038A, which covers both trap options, may be the practical substitute.
  • The finished-floor and finished-wall line, so the rough-in is measured from a completed surface rather than a structural one.
  • Cistern type and carrier frame brand if one is already specified, plus the actuator plate size and position.
  • Whether the wall is masonry, steel stud or timber stud, and the available cavity width.

Send the drawing even if it is a sketch with dimensions. Trap and rough-in details appear on product pages as catalogue descriptions; we confirm them against the current technical sheet before production, so treat any published figure as a starting point rather than a fixed installation dimension.

2. Quantity, mix and how the units will be installed

Sanitary ware is rarely ordered one piece at a time. Tell us:

  • Total quantity, plus the breakdown per room type or floor if the project repeats layouts.
  • Whether you want the whole 1038 series look or a mixed package, and whether matching basins should be quoted in the same order.
  • Installation route: our own on-site installation support, your local plumber, or supply only.
  • Spare-parts needs at the time of ordering — replacement seats, actuator parts and spare units for hotel stock are cheaper to produce in the original batch than as a small follow-up run.

For hospitality work we normally quote wall-hung WCs together with the rest of the bathroom package. That is where a single supplier listing bathroom sanitary fixtures saves time: basins, wall-hung bidets, vanities, mirror cabinets, shower systems and vanity lighting can be specified against one set of drawings instead of six separate datasheets.

3. Finish, glaze and the look you are matching

The 1038W is titled as a rimless wall-mounted WC and described on its page as vitreous ceramic with a seamless glaze and clean minimalist lines. If your design intent is more specific than "white", send us:

  • A finish reference or photo of the sample you are matching — gloss level matters when bowls sit next to basins from another batch.
  • The basin and bath shapes in the same room, so we can check that the bowl outline reads as a set.
  • Any brand customisation requirement, which we handle under custom and OEM service, including marking and packaging for private-label programmes.

4. Site conditions that affect packing and delivery

Ceramics travel well when they are packed for the last leg, not just the first one. Share:

  • Destination city and the delivery address type — port, warehouse or a finished hotel floor.
  • Lift dimensions, service-lift limits and stair access if units go to upper floors of an occupied building.
  • Your preferred Incoterms and whether you want us to arrange freight, customs paperwork and door-to-door delivery as part of the order.
  • The on-site sequence: when bathrooms will be closed up, so production dates can be set backwards from that milestone rather than forwards from today.

We ship internationally through our logistics and door-to-door delivery service, covering sea, air and rail freight with the associated paperwork. Import duties, taxes and transit terms are confirmed per shipment, so state your country early in the enquiry.

5. What a complete first enquiry looks like

Item to supplyWhy we need it
Model reference and link (1038W)Locks the correct bowl, glaze and series
Trap type and rough-in from finished surfacesDetermines carrier frame, cistern and wall build-up
Cistern / carrier frame brand and plate sizeAvoids mismatch between frame and pan height
Quantity split by room typeSets batch size, packing list and container plan
Matching items in the same packageKeeps glaze, shape and delivery date consistent
Destination, access route and IncotermsDrives packing spec and freight quotation
Programme dates for wall closure and handoverAnchors production and shipment milestones

6. Questions worth asking us back

  • Which technical sheet applies to the batch you are quoting, and can it be issued with the quotation?
  • What packing standard is used for multi-unit orders travelling inland after discharge?
  • How are snags, replacements and spare parts handled after handover, under our installation and after-sales support service?
  • Can the order be combined with cabinetry, lighting or flooring from the same project package to reduce shipments?

Send us the model reference, your trap arrangement and a quantity list, and we will return a specification-matched quotation for the 1038W together with the rest of the bathroom package. Contact SANTERSON to start.