Open display units look simple on a drawing. A run of shelving, a few recesses, some objects sitting on them. The trouble is that this simplicity pushes decisions onto site, and by the time the unit reaches the wall those decisions are expensive to change. Below is what we ask buyers and designers to settle before a Santerson open display unit goes into production, and why each one changes the outcome.

What an open display unit is actually doing in a project

An open display unit is built-in shelving whose purpose is to show something rather than hide it. That single difference drives everything else. A closed cabinet can be planned around storage volume; an open unit has to be planned around sightlines, object sizes, lighting and dust. In a villa living room it usually carries books, ceramics or collected pieces. In a hotel lobby or a residence with guest-facing areas it may carry merchandise, awards or curated objects chosen by the interior designer.

Our Display Cabinets range also covers enclosed options — glass front display cabinets and curio cabinets — and that choice itself is a project decision. Glass fronts protect what is on show and reduce cleaning; open fronts are cheaper to access and read as more relaxed. If the objects are valuable, dusty or handled by guests, an enclosed front usually wins.

The room and how people move through it

Before dimensions, look at traffic. An open unit in a corridor or behind a dining setting takes knocks from passing chairs and shoulders, so shelf edges, side panels and any protruding trim need to sit out of the strike zone. A unit that faces a window wall receives direct sun, which affects both finish colour over time and what you place on it — textiles and paper fade, ceramics and metal do not.

Then look at what the unit is next to. In an open-plan living and dining space, an open display unit often reads as a room divider, and in that case both faces need a finished treatment rather than one nice front and a plain back. Tell us this early; a two-sided unit is a different build from a wall-recessed one.

Wall construction and what it can carry

This is the detail most often discovered late. Open shelving has no closed carcass to stiffen it, so the fixing depends entirely on the substrate. Timber studs, masonry, steel framing and light-gauge partitions each take fixings differently, and a tall run carrying books loads far more than its own weight suggests.

  • Recessed or surface mounted? A niche built into the wall needs the wall set out around it. Surface-mounted units only need a sound, plumb face.
  • Floor to ceiling or part height? Full-height runs behave like floor to ceiling systems and usually need top restraint as well as bottom fixing.
  • What goes on the deepest shelves? Weight decides shelf span, board thickness and whether a midspan support is needed. We would rather size for the intended load than guess.
  • Is the wall flat? On older or renovated walls, scribing and shadow gaps are planned in; they are not something to fix on site with sealant.

Dimensions: made to measure, but decided by what you display

Our open display units are configured as made-to-measure pieces, so overall size is not a limitation. The real question is bay sizing. A shelf that holds a row of paperbacks needs a different depth and spacing from one holding a single sculpture or a stack of art books laid flat. Working backwards from the objects gives you a bay grid; working forwards from a pretty elevation usually gives you wasted height.

Fixed versus adjustable shelving is another fork. Adjustable pins give flexibility, but the holes are visible and the boards are lighter. Fixed boards with concealed fixings look cleaner and carry more, which is why they suit heavier display loads. Mixed arrangements — fixed structural boards with a couple of adjustable bays — are common and practical.

What we need from your project pack

  • Room, wall location and the traffic the unit will sit in
  • Wall build-up and substrate, with a set-out drawing where the unit is recessed
  • Overall height, width and depth, plus bay heights if you have them
  • What will actually be displayed, including anything unusually heavy or oversized
  • Material and finish selection, matched to surrounding joinery
  • Whether integrated lighting is required, and where power is available

Finish, and how it has to sit with the rest of the joinery

Open units are highly visible, so the finish matters more than on storage you close away. We can match veneers, lacquers and laminates across kitchen, wardrobe and media cabinetry, which is what keeps a living wall from reading as three unrelated purchases. Two things to settle at specification stage: sheen level, because a high-gloss panel in a bright room shows every fingerprint and every shelf shadow; and edge treatment, since exposed shelf edges are the part that gets chipped.

Where the surrounding scheme uses pale walls and soft materials, a darker unit becomes the anchor. Where the joinery is already dark, an open unit in a lighter finish keeps the wall from feeling heavy. Send us samples or the joinery schedule and we will match to that rather than invent a colour.

Lighting decided before production, not after

An unlit open unit in a dim room simply goes dark, and the objects disappear. Lighting is far easier to plan into the boards — channels, cable routes, transformer position and a switch or sensor location — than to add later with surface fittings. If you want lit shelving, tell us at design stage and we will coordinate it with integrated cabinet lighting, or point you toward an enclosed illuminated display cabinet where the light can be contained properly.

Colour temperature should match the room, not the catalogue. Warm light flatters timber and ceramics; cooler light suits stone and metal. And check glare: a fitting at eye level across an open bay puts a lamp directly into the sightline of anyone seated nearby.

How it combines with the rest of the storage wall

Very rarely does an open unit stand alone. It normally forms part of a larger wall where closed volumes hide clutter and open bays give the eye somewhere to rest. Planning that mix as one order keeps profiles, board thicknesses and reveals consistent — which is exactly what makes a wall look built rather than bought.

Useful companions in our range include open display niches set into integrated storage walls, open modular units for more flexible layouts, and mixed open and closed storage where both roles share one elevation.

A quick rule from the workshop: if you cannot say what sits in each bay, the bay sizes are not finished yet. Send us the object list and we will set out the grid with you.

Maintenance you should expect from an open unit

Open shelving collects dust on every horizontal surface, including the top of each board where objects do not stand. In a busy hotel or show residence that means a cleaning routine and safe access to upper bays. It also means shelf surfaces take handling wear, so finish choice is partly a maintenance decision. Where cleaning access is difficult, an enclosed front or a deeper recess with limited depth is often the more sensible specification.

A short pre-production checklist

  • Substrate confirmed and set-out drawing issued for any recessed work
  • Bay grid agreed against the actual objects to be displayed
  • Fixed and adjustable bays identified on the drawing
  • Finish and sheen matched to the surrounding joinery schedule
  • Lighting, power and switch positions shown on the drawings
  • Two-sided treatment confirmed where the unit divides a space
  • Cleaning access to upper bays considered
  • Delivery route, lift sizes and stair access checked for long boards

Getting it specified correctly the first time

The projects where open display units go wrong are almost never about aesthetics. They are about a wall that could not carry the load, a bay grid that did not fit the objects, or lighting added too late to be routed properly. Those are all resolved on paper for very little effort, and they are resolved by sending us more information rather than less.

As a manufacturer handling furniture and building materials for villa, hospitality and office projects, we build these units to the dimensions and finishes on your drawings, and our team reviews substrate, loading and lighting before production starts. Share your drawings, joinery schedule and object list with us and we will come back with a set-out that fits the wall you actually have.

Send us your drawings

Share the room, wall build-up, dimensions and what you plan to display. We will confirm bay sizing, finish matching and lighting routes before anything is manufactured.