Integrated door and paneling work looks simple on a rendering: one continuous wall, one finish, one door that disappears into it. In production it is one of the least forgiving items in a fit-out, because the leaf, the frame, the hinges and the surrounding panels all have to agree with each other before anything is cut. A quotation based on a picture alone almost always moves after the first workshop drawing. The list below is what we need from architects, builders and project buyers to price Integrated Door & Paneling properly the first time.
Why this scope is quoted differently from a standard door
A stocked door leaf and its casing can be priced from a schedule line. An integrated assembly cannot, because the wall finish and the door are manufactured as one visual system: the panel layout has to run across the opening without an awkward cut, the reveal has to match the panel joint, and the hardware has to sit inside a build-up that was designed around it. Where concealed or Flush Wall Aligned Doors are involved, the wall build-up, the load path for the hinges and the floor covering all influence the leaf size and the swing. That is why we treat it as made-to-measure joinery rather than a door line item, and why an early enquiry saves weeks later in the programme.
1. Drawings: plan, elevation and section
Send what you already have — even at concept stage. A marked-up PDF is enough to start. We are looking for:
- Room plans showing every opening in the paneled wall, with door positions and swing direction.
- Wall elevations with overall width and height, finished floor level and finished ceiling level.
- A horizontal section through the paneled wall, so we can see the substrate, the panel thickness and how the door frame is meant to meet it.
- Setting-out dimensions from fixed references — a corner, a grid line or a doorway — rather than relative measurements between fittings.
- Any detail at returns, corners, arches and reveals, plus skirting or shadow-gap intentions.
2. Wall build-up and site conditions
The door has to be anchored into something, so the wall construction matters as much as the finish. Please tell us whether the substrate is masonry, stud partition, or a frame we are asked to supply; the total thickness including plasterboard, render or tiling; and whether the wall is load-bearing or partition. Where concealed doors are specified, note the floor covering at the threshold and any underfloor heating, because both affect clearance at the bottom of the leaf. If site dimensions have been taken on a completed base build, say so — measured openings from an occupied or partly finished property usually differ from drawing dimensions, and we quote to whichever is confirmed.
3. Door specification
The door itself needs its own line of detail. This is where most of the price variation sits:
| Item | What to confirm |
|---|---|
| Opening type | Hinged, sliding or pocket; single or double leaf; concealed frame or visible frame. |
| Leaf size | Clear opening width and height, plus required floor clearance at threshold and carpet. |
| Swing and hand | Left or right, inward or outward, and any obstruction from furniture or sanitaryware. |
| Hardware | Hinge load rating for the leaf weight, lock or privacy set, handle style — including handleless concealed door details where a flush face is required. |
| Finish of the leaf face | Painted, veneered or laminated to match the surrounding panel, and whether the face is to be site-decorated or factory-finished. |
| Performance | Acoustic separation, moisture exposure or fire rating requirements. State the requirement as written in your specification; we confirm what the assembly can meet before production. |
4. Paneling scope and finish schedule
For the wall, we need the panel system you want and how far it runs. Our Wall Panel Systems and Custom Niche Paneling are both specified per project, so tell us which walls are paneled, whether the panel joints are vertical or horizontal, the required board width, and how you want the joints expressed — shadow gap, flush butt joint or a decorative trim. Where a niche, shelf or display recess breaks the panel run, include its dimensions and any lighting intention; recessed details change both manufacturing and lead time. If your project also uses wood veneer panels or stone and marble panels elsewhere, send those schedules too so the door face can be matched across the whole job rather than per room.
For finishes, one of these is usually enough: a manufacturer code with substrate, a physical sample sent to the factory, or a reference to an item already in our catalogue. Paint colours quoted by name alone are not reliable across materials, so we ask for a RAL or brand code and confirm the sheen level.
5. Quantities, phasing and tolerances
Give us a schedule rather than a total: each opening, its size, its finish and its room. Note which bathrooms or rooms repeat, since repeating modules can be produced together and priced better than one-off units. Tell us the sequence in which rooms need to be handed over, because integrated paneling is installed after wet trades and floor finishes, and it is usually the last item before handover. If your site works to a fixed tolerance regime — for example, a maximum flatness deviation on walls before panels go on — include it; that determines whether we supply a leveling frame or work to your substrate.
6. Logistics and installation
Panel boards and door leaves are long, heavy and easily damaged, so delivery details change the packaging and therefore the cost. Please confirm the destination city and site access, floor level, lift or stair constraints, and whether goods arrive to a builder's warehouse or directly to site. Tell us who installs: our installation and after-sales support service covers on-site fitting and snag inspection, while many buyers prefer their own joiners and simply need clear fixing drawings and setting-out plans. We also arrange freight by sea, air or rail with door-to-door delivery, so if you want us to handle the shipping leg, include the Incoterms you expect to trade on.
A short checklist before you send an enquiry
- Plans, elevations and at least one section through the paneled wall.
- Confirmed finished floor and ceiling levels, plus substrate type and wall thickness.
- Opening schedule: size, swing, hardware and lock type for every door.
- Panel layout, joint detail, niche or shelf positions, and lighting provisions.
- Finish reference by code or sample, including the leaf face.
- Any performance requirement copied from your specification.
- Quantities, repeat modules, delivery address and site access, installation responsibility.
What you receive back
With the above in hand we return an itemised quotation by room and opening, a material and finish schedule, and workshop drawings showing panel set-out, joint positions and door details for your approval before production. If your project also needs other built-in work — vanities, wardrobes or full-height storage walls — sending those drawings in the same enquiry lets us coordinate one manufacturing run instead of several. Our interior design services cover space planning and 3D rendering when a project is still at concept stage, and our custom and OEM service covers bespoke sizes, finishes and private-label requirements.
Send your drawings and opening schedule to start a quotation for integrated doors and wall paneling. Contact SANTERSON with your project location, room list and target programme, and we will confirm the specification points that still need closing before production.