A design brief tells a panel manufacturer what the wall should look like. It rarely tells them what to build. The gap between those two things is where wall panel projects lose time: substituted finishes, re-drawn elevations, and panels that arrive on site without the reveal, return or door detail the drawing assumed. Below is how we read a brief at SANTERSON, and the information an enquiry needs before we can price wall panel systems properly.
What the brief usually gives you — and what it leaves out
Most interior design briefs arrive as a concept board, a set of room elevations, and a finish schedule with three or four names in it: oak veneer, fluted panel, stone-look surface, lacquered reveal. That is enough to fix the look. It is not enough to fix the build.
Wall panel systems here mean more than a decorative feature wall. The term covers the panelling that finishes a whole wall and everything built into it: veneered and textured panels, stone or marble surfaces, niches, shelving, partitions and concealed doors. In practice we quote it as one system with cabinetry, because the same sheet material, finish reference and set-out drawing carry across both.
A panel line on an elevation is ambiguous by nature. The same drawn rectangle could be a veneered substrate panel, a flexible stone veneer applied over plasterboard, or a wall system that also carries a concealed door. Each answer has a different sub-frame, a different set-out, and a different lead time. If the enquiry does not resolve those questions, the manufacturer prices one option and the site expects another.
The six inputs we need before quoting
These are the items our team works through with designers, builders and project managers on villa and hospitality jobs. Send them with the first message and the enquiry usually comes back with a usable price and a build drawing rather than a list of follow-up questions.
| Input | Why it changes the quote |
|---|---|
| Room-by-room quantities, not a total square metreage | Panels are made to measure. A single figure for the whole floor cannot be turned into cut sizes, and offcuts are decided per room. |
| Substrate and existing wall condition | Plasterboard over timber studs, masonry, and a curved soffit each need different framing and fixings. |
| Finish family, with a reference sample or image | Veneer, textured panel, stone or marble look and lacquer are quoted separately. A written name alone is not enough to match grain and sheen. |
| Set-out drawing or grid dimensions | Panel widths, joint spacing and reveal depth determine the number of pieces and whether a design needs rebating on site. |
| Integration items: doors, niches, lighting, skirting | Concealed doors, display niches and integrated cabinet lighting are built into the same system and must be drawn before production. |
| Delivery address, access notes and installation responsibility | Pack size follows container loading; floor level, lift dimensions and stair access follow the largest panel. |
1. Quantities per room, not one total
Send an area schedule by room or by elevation number. Panel sizes are made to measure for each project, so a total figure only supports a rough budget allowance — it cannot be cut into production sizes. Where the drawing is still developing, mark which elevations are frozen and which are provisional; we price those two categories differently.
2. What the panel has to sit on
Tell us what the wall currently is, or what the builder intends to construct behind the finish. A flat masonry wall and a service wall with pipework behind it take different framing. For curved surfaces, note the radius; bendable panels such as our flexible rammed earth panel follow a curve that a rigid veneered panel cannot, and the two are not interchangeable.
3. Finish family with a physical or visual reference
Names travel badly between countries. "Grey oak" means different things to three suppliers. Pick a finish family — veneer, textured, stone and marble, glass or lacquer — and attach the reference: a sample number, a photograph of an installed wall, or a mood board image. Our textured panels and stone and marble panels are both offered with selectable material and finish, so the reference is what locks the specification.
4. Set-out: joint spacing and reveal depth
The visible design of a panelled wall is mostly joints. State the intended module width, whether joints are tight or shadow-gap, and how deep a reveal the designer expects. If the drawing does not show it, say so — we will propose a set-out for approval before production rather than assume one.
5. Everything that has to disappear into the wall
This is where late enquiries cost the most. A concealed door in a panelled wall, an illuminated niche, or shelving with integrated lighting all change the framing and must be coordinated before panels are cut. Our Custom Partitions & Paneling range covers these as one system: integrated door and paneling keeps a door leaf flush with the surrounding panels, and custom niche paneling carries display recesses at set positions. List these items in the first enquiry even if their sizes are still tentative.
6. Delivery and installation, stated as facts
Give the delivery address, floor level, lift or stair dimensions, and who is installing. We handle logistics and door-to-door delivery, and installation support is available, but pack sizes are planned around container loading and the largest single panel has to physically reach its room. Those two constraints decide maximum panel dimensions more often than the design does.
How a good enquiry reads
Compare these two openings from real enquiries:
"Please quote wall panelling for a villa, light oak look."
"Villa, Level 2. Elevations D1–D7 frozen, D8 provisional. Feature wall behind lift lobby, measured area to be confirmed from the drawing; substrate plasterboard on timber studs, to be framed by builder. Veneer finish family, reference sample attached, tight joints at 600 mm module with a shadow reveal to skirting. One concealed door at D5, one display niche at D6. Delivery to Sydney ground floor, forklift access; our contractor installs. Please return a set-out drawing for approval."
The second enquiry is longer to write and shorter to resolve. It removes the guesswork that causes re-drawing.
From enquiry to production: what happens next
With those inputs in hand, an enquiry normally moves through the same steps as any custom job:
- A set-out drawing and specification for your approval, including panel sizes, joint detail and finish reference.
- Confirmation of dimensions and selected specifications by both sides before anything is cut.
- Production with our own quality control, coordinated under custom and OEM service where the project needs bespoke finishes or branding.
- Packaging, container loading and door-to-door delivery to the site address you supplied.
- Installation support and after-sales follow-up once the panels are on site.
A short pre-enquiry checklist
- Elevation numbers referenced, frozen and provisional marked separately
- Areas listed per room or per elevation
- Substrate and wall construction stated
- Finish family chosen, reference sample or image attached
- Joint module, reveal depth and skirting detail specified or flagged as open
- Doors, niches, shelving and integrated lighting itemised
- Curves given with a radius
- Delivery address, access constraints and installer named
If your project needs the panels, cabinetry and other fit-out items coordinated by one supplier rather than several, that is how we work: SANTERSON manufactures furniture and building materials in China and supplies them to villa, hotel and office projects internationally, with design coordination, production, logistics and installation handled under one contract.
Send your brief. Attach the elevations and the area schedule, name the finish family, and list what has to be built into the wall. We will come back with a set-out drawing and a quotation you can compare line by line.