A mirror cabinet looks like a small item on a bathroom schedule until it arrives on site with the wrong depth, a light that cannot be wired to the local circuit, or a door that swings into the basin tap. Most of those problems are settled at specification stage, not during installation. The Santerson LED Mirror Cabinet is a configurable product made to suit each space, which means the buyer, not the factory, decides what gets built. This guide sets out the fields worth writing down before an enquiry goes out, so the quotation you receive matches the cabinet your drawings show.
Start from the wall, not from the catalogue
Santerson's mirror cabinets sit in the bathroom range alongside Standard Mirror Cabinet, Santerson Round Mirror Cabinet and Santerson Tall Mirror Cabinet. The LED version is described as a configurable unit for residential bathroom projects, with finish, layout and dimensions specified per space. Because the size is not fixed, your first job is to measure the wall rather than browse for a model number.
Record four numbers before you write anything else:
- Finished width and height of the wall area the cabinet may occupy, taken from finished surfaces rather than structural walls, so tiling and waterproofing thickness are already included.
- Required projection from the finished wall face, checked against the basin, tap spout and any shower screen or door that has to clear it.
- The height of the vanity top or countertop below, and the position of mirror centre relative to the user's eye line for that room type — guest bathroom, main family bathroom or a bedroom ensuite each sit differently.
- Clearances on both sides, since a hinged door needs swing space while a mirrored front on a tall unit usually does not.
Send these as a dimensioned sketch with the enquiry. A hand-drawn elevation with numbers is enough; what matters is that the factory and your site team are reading the same wall.
Specify layout and storage before appearance
The LED mirror cabinet page describes a configurable layout, so storage can be arranged around how the room is actually used. Walk through the items that will live inside — daily glasses and toothbrushes, medicines that need to stay out of reach, hair dryers and straighteners that need a socket nearby, spare towels or toiletries bought in bulk for a rental or serviced apartment.
Then state plainly in the specification which of those go behind a mirrored front and which stay open. Adjustable shelving heights are worth requesting where bottle heights vary, and a shelf arrangement that keeps tall items below eye line avoids the cabinet reading as cluttered once it is in use. For guest bathrooms and short-stay accommodation, fewer visible items and more closed storage usually means less housekeeping time.
Treat the lighting as an electrical item
Write down how the light is switched and where it is fed from, because these two decisions change both the cabinet and the first-fix electrical work:
- Switching method — a wall switch on the lighting circuit, a pull or touch control on the cabinet itself, or a sensor. Say which one you want.
- Feed location — whether the supply is already in the wall behind the cabinet or must be extended to it, and at what height.
- Position of the light source — perimeter lighting around the mirror face gives even, shadow-free reflection for shaving and make-up, while top-down light casts shadows under the brows. If you also want Vanity Lighting or Santerson Integrated Cabinet Lighting inside the cabinet or on a matching wall unit, list it in the same enquiry so one wiring plan covers everything.
- Which bathroom zone the cabinet sits in, and what your local electrician requires for fixtures near water. Santerson confirms product ratings per configuration; final compliance with local wiring rules is signed off by your electrical contractor on site.
Lock down finish, material and hardware
Finish and material options are specified per project, so name them rather than describing a mood. State the cabinet body material, the front finish, and whether the same finish must carry across other joinery in the property — vanities, tall cabinets or wardrobes ordered from the same range can be matched to one finish schedule if you ask for it at quotation stage.
For hardware, list the door type (hinged or mirrored front), handle style or a request for a handleless edge, and soft-close where the cabinet is in a bedroom ensuite or a hotel-style bathroom that sees heavy daily use. If your project uses private labelling or bespoke detailing, Santerson's Custom & OEM Service covers custom design and prototyping, bespoke finishes and material choices; confirm the options and minimum order quantities available for your configuration.
A specification block you can copy into an enquiry
| Field | What to write |
|---|---|
| Room and quantity | Which bathroom(s), unit type, number of cabinets per room and per project. |
| Dimensions | Width, height and projection from finished wall face; vanity top height; side clearances. Attach a dimensioned elevation. |
| Layout | Open versus closed storage, shelf count and whether shelves adjust, any dedicated space for appliances or medicines. |
| Lighting | Switching method, feed location and height, light position around the mirror face, matching vanity or cabinet lighting if required. |
| Finish schedule | Body material, front finish, whether it must match other joinery in the same project. |
| Hardware | Door type and opening direction, handle or handleless edge, soft-close requirement. |
| Site conditions | Wall construction behind the cabinet, waterproofing detail, who installs on site, delivery address and access constraints. |
| Confirmation list | Ask the supplier to confirm dimensions, materials, lighting and electrical details, hardware and installation requirements for your configuration in writing before production starts. |
Where a clear specification saves the most time
Santerson works as a furniture and building materials supplier covering design consultation, material selection and product specification, manufacturing, logistics and door-to-door delivery, then installation support. That workflow only holds together when the item is specified once and carried through every stage. For a single bathroom renovation, an incomplete spec costs a delayed cabinet. Across a villa or apartment project, where mirror cabinets appear in several bathrooms and must match vanities, wall panelling and lighting from the same package, the same gap multiplies across rooms and trades.
Two practical habits prevent most of it. First, issue one specification table per room type — identical bathrooms on different floors should share one document rather than three loosely written notes. Second, require a written confirmation of dimensions, materials, lighting and hardware back from the supplier before production is released, and circulate that confirmation to the electrician and tiler who are working to the same wall.
If you are specifying bathrooms for a villa, apartment or short-stay project, send the dimensioned elevation and the fields above together as one enquiry. Santerson's team reviews the configuration with you before production, and can coordinate the mirror cabinet with the vanities, basins, shower systems, lighting and cabinetry in the same package through Turnkey Solutions.