A request for quote on matte acrylic cabinets usually gets one of two responses: a single price per linear metre, or a detailed breakdown that matches your drawings. The difference is almost never the supplier's willingness to help — it is what the buyer put in the enquiry. Cabinet pricing is built from dimensions, substrate, door construction, hardware and packing method, so an RFQ that leaves those out forces the factory to guess, and the guess becomes the number you have to renegotiate later.

This guide lists what a complete RFQ should contain when you are sourcing matte acrylic cabinets for a residential or apartment project, and what each item changes in the quotation. Use it as a checklist before you send drawings.

1. Drawings, not room photos

A photograph tells a manufacturer nothing usable about heights around windows, the depth of a return wall, or where services run. Send measured layouts even if they are hand-drawn, and mark for each wall:

  • Overall run length, plus base unit height and carcass depth you expect
  • Appliance schedule with make and model for anything built in — oven, cooktop, dishwasher, fridge, wine cooler
  • Position of the sink, tapware, sockets, switch plates, extraction ducting and gas outlet
  • Floor finish build-up, so the plinth height can be set after tiling or screed is laid
  • Ceiling height and any bulkhead, beam or drop that a tall unit has to clear

Where you do not have final appliance models yet, say so in the RFQ and ask for a price with a reserved cut-out size. That keeps the quotation valid instead of excluding the item entirely.

2. The finish you actually want, described precisely

"Matte" covers several different products. In our acrylic kitchen cabinet collection, matte acrylic sits alongside high gloss acrylic, metallic and patterned acrylic fronts, so the surface you name in the RFQ determines the panel make-up and the edge treatment. For matte doors, specify:

  • Colour or reference — a RAL code, an existing sample number, or a physical swatch you will post
  • Sheen expectation: soft-touch matt, standard matt, or anti-fingerprint matt
  • Edge detail: matching wrapped edge or a contrasting reverse, which matters on island ends and open shelving returns
  • Whether the same finish continues onto tall units, pantry fronts and any integrated appliance panels

Ask how many acrylic panel colours are included in the quoted price and what a non-standard colour costs. Some suppliers quote one standard colour and charge per variation; getting that stated up front prevents surprises across a multi-apartment order.

3. Carcass, door core and the hardware schedule

The acrylic surface is only one layer. Two quotations for "matte acrylic cabinets" can differ by a wide margin because of what sits behind the front. State in the RFQ what you expect, and require the supplier to confirm it line by line:

ItemWhat to specify in the RFQWhy it moves price
Carcass boardBoard type and thickness, edge band colour, moisture-resistant board for wet zonesGoverns durability near the sink and dishwasher, and carcass cost per unit
Door core and acrylic applicationPanel substrate, acrylic face, direction of grain or sheen on patterned frontsAffects flatness on tall doors and the minimum order for non-standard sizes
Hinges and slidesBrand line you accept, soft-close requirement, overlay, load rating for drawersHardware tier is often the largest single variable in a cabinet quotation
Interior fittingsShelf spans and loads, drawer widths, corner solutions, pantry and larder pull-outsFittings are priced per piece, so an unscheduled interior cannot be quoted at all
WorktopMaterial and thickness, edge profile, sink cut-out type, whether the top is includedWhether worktops are in scope changes the whole basis of comparison
Integrated lightingUnder-cabinet strips, in-cabinet sensors, transformer positionsRequires pre-drilling and wiring routes decided before production

If your project mixes finishes — matte acrylic on the perimeter and a different front on the island — list each group separately with its own quantities. A single blended figure hides where the cost actually sits.

4. Scope, quantities and delivery terms

Custom cabinetry is made to the space, so a supplier quoting custom built-in kitchen cabinets needs to know how many identical sets there are and where they land. Include:

  • Number of kitchens or units, with each layout identified separately if they differ
  • Whether wardrobes, laundry joinery, tall pantry walls or media units are also in scope, since one factory can supply them together and consolidate the shipment
  • Delivery address and the Incoterms you want priced — FOB, CIF or door-to-door
  • Packing method: flat-pack for container efficiency, or assembled carcasses where site access allows
  • Target on-site date, working backwards from your trade sequence rather than a wish date

Ask for the quotation split into product, packing, inland haulage to port and freight. A single delivered figure makes it impossible to compare two suppliers on the same basis.

5. Sample and approval route before mass production

Matte acrylic shows its character under site lighting, so a swatch alone is not enough for a project decision. Ask the RFQ response to cover:

  • A physical door sample or mock-up in the specified finish, with the cost and lead time for it stated
  • Who signs off the sample, and what happens if the approved sample and delivered panels differ in sheen
  • Whether a pre-shipment inspection report is offered, and what it covers — panel flatness, edge wrap, hardware function
  • Spares policy: replacement doors, extra shelf pins and spare hinge sets shipped with the original order
Practical point: request the sample early in the tender, not after award. A matte finish that reads well in a showroom can look chalky under warm 3000 K site lighting, and changing the panel specification after drawings are released is where projects lose weeks.

6. After-sales terms worth putting in writing

Cabinets fail at the hardware long before the fronts do. In the RFQ, ask what happens after delivery: which components are covered and for how long, how replacement hinges or a damaged door panel are supplied, and whether installation guidance is available on site. Our own service pages describe on-site installation, snag inspection, warranty coverage, spare parts and ongoing maintenance as part of the handover; response-time figures quoted on any supplier's website should be confirmed in your contract before you rely on them.

A short RFQ checklist

  • Measured layouts per wall, appliance schedule, service positions, floor build-up
  • Finish reference, sheen expectation, edge detail, colour-variation pricing
  • Carcass board, door core, hardware tier, interior fittings, worktop scope, lighting
  • Quantities, delivery address, Incoterms, packing method, required on-site date
  • Sample route, approval sign-off, inspection report, spares and warranty terms

Send that set of information to two or three manufacturers and the quotations become comparable line by line. Omit it, and you are comparing guesses.

SANTERSON has manufactured furniture and building materials since 2008 and supplies one-stop project furnishing across kitchens, wardrobes, bathrooms, lighting, flooring and outdoor ranges for villa and hospitality projects. If you send drawings and the finish reference above, we return an itemised quotation rather than a price per metre — contact us to start that process.