Wall panelling is one of the largest visible surfaces in a villa or apartment, and it is also one of the items that most often stalls a project. The panel schedule is signed off late, the sample on the conference table looks different from the sample on the wall, and three people each believe they already approved the finish. If your project specifies Santerson Matte Lacquer Panels, the fix is procedural rather than technical: decide early who signs off what, in which order, and against which physical reference. The guidance below sets out that sequence for a project where the panelling comes from our factory in Foshan and the site team is overseas.

Why matte lacquer panels need more approvals than most finishes

Our matte lacquer panel offering sits in the Paneling Systems collection and is made to measure: finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size. That flexibility is exactly what creates the approval load. A standard-size item can be ordered from a data sheet. A made-to-measure wall system cannot.

Three characteristics of this product drive the extra sign-offs:

  • The finish is light-sensitive in a specific way. A low-sheen lacquer reads differently under downlights, under a window's daylight, and under the warm LED strip in a display niche. A sample approved flat on a desk can look wrong once it is fixed vertically and lit from one side.
  • Every panel in the run must match. Panels are produced together for one wall or one apartment. If a colour or sheen decision changes after production has started, you are not replacing one board — you are re-running a set.
  • The dimensions are project-specific. Setout, reveal lines, and the interface with skirting, doors and built-in joinery all have to be agreed before cutting. Those are design decisions, not factory decisions.

The practical consequence: approvals for this item should be planned as a chain of small confirmations, each tied to a document or a physical sample, rather than one signature at the end.

Who is actually in the approval chain

On most villa and residential projects we supply into, four parties touch the panel decision. Naming them at the start — with one person holding the pen for each item — removes most of the arguments later.

RoleWhat they are decidingEvidence they need before signing
Owner or client representativeColour family, sheen level, where panelling appears room by roomA physical sample viewed in the actual room, plus a setout drawing showing panel lines
Interior designer or design leadPanel layout, joint positions, interfaces with lighting and joinery, consistency across floorsDimensioned elevations and a sample board with the selected finish
Builder or site foremanSubstrate preparation, setting-out tolerances, sequence relative to painting, electrical and flooringPanel sizes and fixing detail, plus the wall flatness tolerance you will work to on site
SANTERSON project coordinatorManufacturability of the setout, panel module sizes, packaging split, what can still be changed and until whenYour approved drawings and a written confirmation of the finish reference

One rule keeps this from becoming a committee: each line item has one approver and several consulted parties. If the interior designer owns layout and the owner owns colour, write it down that way. Overlapping ownership is where "I thought you approved it" comes from.

The five approval gates, in order

This is the sequence we recommend for a project using made-to-measure panelling. Each gate has a deliverable and a decision; nothing moves to the next gate on a verbal yes.

Gate 1 — Scope and schedule freeze

Confirm which rooms receive panelling, which walls within those rooms, and how the panelling relates to other finishes in the same space. Our wall panel systems range covers related configurations, so if one wall is going to be stone-look and another lacquered, decide that pairing now rather than at production. Deliverable: a marked-up plan showing panelled walls, with the room list initialled by the design lead.

Gate 2 — Sample review on site, not in the office

Request samples of the shortlisted matte lacquer finishes and view them against the actual wall, at two times of day, with the intended lighting switched on. Take the sample board to the site rather than asking people to imagine it. Deliverable: a written record naming the approved sample reference, dated, signed by the owner's representative. Keep the physical sample itself — it becomes the reference for inspection on delivery.

Gate 3 — Setout and dimension sign-off

This is the gate most often skipped and most expensive to revisit. Panel module widths, joint positions, door and reveal lines, and the treatment at internal corners are all fixed here on dimensioned elevations. Send those elevations to us before production is scheduled; we will flag modules that are awkward to manufacture, transport or fix, and propose adjusted setouts that keep the design intent. Deliverable: signed elevations with dimensions, plus confirmation from the builder that site dimensions match.

Gate 4 — Production release

Production should start only after Gates 2 and 3 are both closed in writing. After release, treat the finish reference and the panel schedule as frozen; anything further is a variation with a cost and a lead-time consequence, and it should be priced and acknowledged as such. Deliverable: your purchase confirmation quoting the approved sample reference and the signed drawing revision numbers.

Gate 5 — Delivery inspection and installation handover

On arrival, check panels against the retained physical sample and against the approved schedule before the installers open cartons. Then inspect the first installed wall as a mock-up — one wall, fully fixed, under real lighting — before the crew repeats the detail across the project. Deliverable: a snag list from that first wall, closed out before the remaining panels go up.

Where a project genuinely cannot run five gates, protect two of them at all costs: the on-site sample review and the setout sign-off. Those two are what prevent a full panel set being re-made.

What each approver should be shown, not told

Approval meetings fail when people are asked to approve an adjective. "Matte grey" means three different things to three people. replace adjectives with references:

  • A sample reference for the finish, and the physical board in the room.
  • Dimensioned elevations rather than a mood image, so joint positions can be measured.
  • A written note of the lighting condition under which the sample was approved.
  • The interface detail at skirting, ceiling line and window reveal — drawn, not described.

This matters especially where panelling meets other custom items in the same project. A bedroom combining wall panelling with matte lacquer wardrobes, or a hallway running the same panel language into integrated door and panelling, needs one approver for finish consistency across both. Otherwise you end up with a wardrobe approved by one person on one day and panels approved by another under different lights.

Running the chain when the factory is in China and the site is abroad

For projects outside China, the approval chain adds distance but not complexity. Our project coordination covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover — so the same coordinator who took your sample request can be the person who confirms production release on your side.

Three habits make a cross-border chain work:

  • Ship samples early, in parallel with design development. Sample transit time belongs to Gate 2, not to the production window. Request samples while elevations are still being drawn.
  • Version your drawings. Every elevation should carry a revision number and date. Production release quotes those numbers. This is what stops an outdated setout reaching the cutting list.
  • Consolidate shipments deliberately. Panels, joinery and other fit-out items from the same project ship together more cheaply and arrive in one sequence for installation. Tell us early which packages belong to the same phase so packaging and container loading follow your install order rather than our production order.

Approval records that protect you commercially

Keep four documents, and keep them in one place. They are what turn a disagreement into a short conversation:

  • Sample approval sheet — product name, sample reference, rooms it applies to, who signed, date, lighting condition.
  • Approved elevations — revision-numbered, dimensioned, with joint positions.
  • Production release — your written confirmation naming the sample reference and drawing revisions.
  • Delivery and snag record — inspection notes against the retained sample, plus the closed-out mock-up list.

Specifications for these panels are confirmed per project rather than assumed from a data sheet. Materials, dimensions and finish performance for your chosen configuration should be verified against the production drawings before release; we would rather correct a setout on paper than on the wall.

Before you send the approval pack to us

  • Room-by-room panelled-wall schedule, initialled by the design lead
  • Approved sample reference and the retained physical sample location
  • Dimensioned elevations with revision numbers
  • Builder's confirmation of site dimensions and substrate preparation
  • Named approver for finish, layout and interfaces — one person each

If you are specifying panelling alongside other fit-out items on the same project, bring the whole package to us at once. As a custom furniture and interior products manufacturer working on villa and apartment projects — including recent work in Sydney, Melbourne, Perth and Willoughby — we coordinate the panel schedule against cabinetry, doors and other made-to-measure items so that one approval chain covers everything that has to match. Send us your elevations and sample references and we will return a manufacturability review with any setout adjustments before you release production.