Flush interior doors look simple on a drawing and cause the most rework on site. This guide shows buyers, contractors and project managers how to build a reliable door schedule for villas, hotels and apartment packages, how to keep Santerson's flush door ranges consistent with wall panelling and cabinetry, and what to confirm before an order is released.
Why flush doors create coordination problems
A Santerson Flush Interior Doors unit is specified to sit level with the finished wall face, with no projecting frame line. That clean look depends on three separate trades doing their work in the right order: the wall build-up, the concealed frame and hardware, and the final finish applied to the door leaf. When any one of them works from a different set of dimensions, the result is a leaf that sits proud, a gap that changes width along the reveal, or a finish line that no longer matches the surrounding panel.
The problem is rarely the product itself. It is quantity and specification drift: doors measured before floor finishes are set, openings changed after the schedule was issued, and matching items such as panelling or wardrobes ordered from a different finish reference. A door schedule that is treated as a live document removes most of that risk.
Building a door schedule that holds up
Before you request a quotation, prepare one table per floor or per room type and keep it as the single reference for every later revision. Each line should carry the information a factory needs to price and produce the item without guessing.
| Schedule field | What to record | Why it matters |
|---|---|---|
| Door tag and location | Room code, level, opening reference from the drawing set | Lets you trace a delay or change back to one line instead of arguing about a whole floor |
| Leaf size and wall build-up | Clear opening, finished floor level, total wall thickness including finishes | Flush detailing depends on the finished thickness, not the structural wall |
| Collection and operation | Hinged, sliding or concealed; which Santerson collection applies | Hardware, track and pocket provisions differ between collections |
| Finish reference | Sample code plus the surface it must match (wall panel, veneer, paint) | Prevents a door that matches the sample but not the wall beside it |
| Quantity basis | Counted from the drawing, then re-counted on site before release | Two counts catch duplicated and deleted openings |
| Interface notes | Skirting, architrave, thresholds, ironmongery, door closers | Items often fall between the door order and the joinery order |
Santerson's door listings describe made-to-measure sizing with material and finish options and layouts tailored to each project, so a schedule written in these fields converts directly into a workable enquiry. Confirm the dimensions and selected specifications for every line before production starts; that confirmation step is stated on the product pages themselves.
Counting quantities without double orders
Three practical habits keep the count honest across a multi-unit project:
- Count by opening, not by leaf. A pair of doors, a sliding set with a fixed panel and a pocket arrangement each need their own line, because the wall provision differs even when the appearance is the same.
- Group identical rooms into one type. In hotel and apartment work, repeat guest rooms or bedroom layouts should share one door type per room. Deviations are then visible as exceptions rather than hidden in a long list.
- Freeze the schedule at two points. The first freeze is for pricing and lead-time planning; the second is on-site verification of openings after walls, screed and services are complete. Record who signed off each freeze.
Where a project includes both new villas and renovation work, keep separate schedules. Existing openings rarely match drawing dimensions, and mixing them into one list is the usual cause of short or over-ordered quantities.
Matching doors to panelling, joinery and hardware
Flush detailing only reads as intended when the door and the surface next to it are treated as one specification. Santerson's Santerson Flush Hinged Doors sit in the hinged collection, while the Santerson Flush Sliding Doors sit in the sliding collection. The two need different wall provisions: a hinged leaf depends on the frame and reveal, whereas a sliding arrangement needs the track, pocket or surface guidance resolved before the wall is closed up.
Concealed variants follow the same logic. Santerson Handleless Concealed Doors remove visible hardware, so edge detail, opening allowance and how the leaf is gripped all have to be agreed early. Santerson Decorative Concealed Doors carry a pattern or motif, which means the design must be checked against the wall around it rather than viewed on its own. For a full-height wall where doors and panelling are intended to read as one surface, Integrated Door & Paneling is the item to specify together with the doors, not after them.
Where a project needs an ordinary hinged leaf instead of a flush detail, Standard Interior Hinged Doors can be scheduled alongside the flush lines. Mixing collections within one building is normal; what matters is that each line states which collection it belongs to, so the ironmongery and wall provision follow correctly.
Finish coordination across trades
Doors ordered from a China-based manufacturer alongside cabinetry, wall panels and flooring are usually shipped in one programme of containers. That is an advantage only if the finish references travel with the order. Paint codes, veneer species and surface sheen should be recorded once and reused across doors, wardrobes and panelling lines, because a supplier matching three separate items to three separate samples will produce three slightly different results.
Sequencing production, delivery and installation
Flush doors are late-stage items on site but early-stage items in procurement. The sequence that works in practice:
- Design and specification. Collections, finishes and hardware selected; schedule issued for pricing.
- Detail confirmation. Dimensions and specifications confirmed line by line with the factory before production is released.
- Production and quality checks. Made-to-measure leaves and frames built to the confirmed schedule.
- Logistics. Freight, customs paperwork and container loading arranged as part of the programme; delivery is tracked against the site sequence so doors arrive when walls are ready, not months earlier.
- Installation and snags. Hanging, alignment to the finished wall face, hardware adjustment and a snag list closed out before handover.
Santerson's service pages describe this path from design and specification through manufacturing, project coordination, door-to-door delivery and installation support. Treat lead times, freight terms and warranty terms as case-by-case items to be confirmed in writing for your project rather than assumed from marketing copy.
Site readiness check before doors arrive. Confirm that wall thickness including finishes matches the confirmed schedule, that floor levels are set, that recesses and pockets are built to the confirmed dimension, and that storage on site is dry and flat. Doors delivered into a wet or crowded site lose the accuracy you paid for in the schedule.
A short pre-order checklist
- Every line carries a door tag, level, collection, size and finish reference.
- Quantities counted from drawings and re-counted on site; both counts recorded.
- Hinged, sliding and concealed operations separated, with wall provisions noted for each.
- Finish references shared with panelling, wardrobe and joinery lines.
- Ironmongery, thresholds, skirting and architrave assigned to a named order line.
- Dimensions and specifications confirmed in writing before production release.
- Delivery sequence agreed against the site programme, with storage arranged.
A door schedule written this way does more than prevent shortages. It gives you a single document that ties quantities, finishes and site readiness together, so the finished wall reads as one surface rather than a set of products placed next to each other.
For door schedules, matching panelling and full project packages, SANTERSON supplies made-to-measure doors, joinery and building materials for villa, hospitality and office projects. Send your drawings and schedule for a quotation and specification review.
Email santerson@qq.com or contact PHILLIP on +86-13928214007 (phone/WhatsApp).