A project order of oak solid wood wardrobes is made to measure for the rooms it will furnish, so the delivery plan has to be built around the same drawings that drive production. Below is how we walk buyers, contractors and project managers through specification, packing, freight, customs clearance and installation handover — and where projects most often lose time.

Why a Wardrobe Order Is Planned Differently from Loose Furniture

Our Oak Solid Wood Wardrobes are supplied as part of the Solid Wood Wardrobes collection for residential projects, with made-to-measure sizing, selectable material and finish options, and a layout tailored to each space. That flexibility is exactly what makes the logistics more demanding than shipping loose furniture.

A wardrobe built to a specific wall cannot be reordered quickly if it arrives damaged or if the opening on site has changed. Panels are long, carcass sections are heavy, and doors and hardware must reach the same room at the same time. So delivery planning starts before production, not after it.

Step 1: Lock the Specification Before Anything Moves

Confirm dimensions and selected specifications for each project while there is still room to change them. For every wardrobe in the order, we ask for:

  • Room-by-room dimensions, with finished floor and finished wall levels stated, plus clearances for skirting, cornices, doors and light switches.
  • The layout for each unit: hanging zone, drawer bank, shelving, and any corner or full-height section.
  • Door type and opening direction, because hinge side and swing clearance are fixed at production.
  • Finish selection and the reference used to approve it. Timber tone and grain vary between boards, so a written finish reference protects both sides.
  • Site conditions the joinery must sit against — floor covering, wall build-up, and whether the unit is built in or freestanding.

Where the project also includes other fitted items from the same range, such as Walnut Solid Wood Wardrobes in a second bedroom or paneled units elsewhere in the house, we schedule those under one production batch. Same-batch production keeps grain and finish consistent across rooms and, more importantly for delivery, lets everything travel in coordinated shipments rather than separate parcels arriving on different dates.

Step 2: Choose the Incoterms and Decide Who Handles What

The single biggest scheduling decision is where our responsibility ends and yours begins. Our logistics service covers global freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, with commercial invoices, packing lists, certificates of origin and import documentation prepared on our side.

In practice projects choose between two arrangements:

ArrangementWho clears customsSuits
Door-to-door delivery to the site or port of entryWe arrange the paperwork; you confirm local import requirementsBuyers and builders who want one point of contact for production and freight
Delivery to port with your own clearing agentYour agentLarge projects that already work with a local broker and want control over duties and inspection

Whichever route you pick, ask your clearing agent early what they need for timber furniture on your import route — declaration detail, treatment or fumigation certificates where required, and the declared value basis. Duties and taxes depend on your country's rules and the declared classification; we do not quote them, and neither should your schedule assume a figure you have not confirmed.

Step 3: Plan Packaging and Container Loading Around the Site Sequence

Solid timber panels and doors are the parts most likely to be damaged in transit, so packing is specified per unit rather than per carton type. Panels are protected edge to edge, doors and carcass sections are packed so weight does not sit on a finished face, and hardware for each wardrobe is boxed and labelled against its unit.

Container loading then follows the installation sequence, not just volume. Wardrobes needed first in the programme load last or pack on top; units for later rooms go deep in the container. This matters most when a site cannot receive everything at once — a villa under renovation may have only one secure room available until the flooring and painting trades finish.

Two practical points to settle with your site team before loading:

  • Storage on site. Solid wood joinery should stay in its packing, off the ground and covered, until installation. Confirm you have that space, and confirm the building is watertight and services are on before large deliveries arrive.
  • Access. Long panels need a route from the truck to the room. Measure lifts, stair widths, door openings and turning spaces; if a panel will not fit, that problem is far cheaper to solve while it is still on the drawing.

Step 4: Build One Delivery Window Around the Site Programme

Work backwards from your practical-completion date and leave room for the trades that must finish before joinery goes in: flooring levels set, walls plastered and painted, electrical positions fixed, and site clean done. Wardrobes installed before those steps risk damage or an out-of-level fit.

Then align three dates on one line:

  • Production completion for the batch.
  • Vessel or rail departure and expected arrival at your port of entry.
  • Clearance, local transport and the installation crew's start date.

Freight schedules shift — weather, port congestion and rolling bookings all move arrival dates. Rather than promise a transit figure we cannot control, we track each shipment and report movement against your programme, so your site team can re-sequence other work instead of standing idle waiting for a container.

Step 5: Receiving, Inspection and Snag List

On arrival, check cartons against the packing list before anything is opened, then open in room order and inspect faces, edges and hardware against the approved specification. Photograph any damage on the packaging and the item at the point of unloading — a dated photo set resolves claims far faster than a description written days later.

Our after-sales service covers inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. For an international order, the practical value of that is spare panels and hardware being produced and shipped against the original batch reference, so a replacement matches the finish already installed.

Step 6: Installation Handover

Made-to-measure joinery is only finished when it is level, fixed, and doors aligned on site. We provide on-site installation and guidance as part of our project service, and handover closes with a joint inspection against the approved drawings and finish references. Sign off room by room — it keeps any remaining items small and traceable.

A Short Checklist for Your Enquiry

If you want an accurate delivery plan rather than a rough estimate, send these with your enquiry:

  • Room drawings or dimensions for each wardrobe, with finished levels noted.
  • Door type, opening direction and internal layout per unit.
  • Finish reference and any matching items elsewhere in the project.
  • Delivery address, port of entry, and who will clear customs.
  • Your site programme: flooring and painting completion, storage available, access route.
  • Practical-completion date you are working to.

SANTERSON is a China-based furniture and building materials manufacturer providing one-stop project supply from design and production through door-to-door delivery, installation and after-sales support. Send us your drawings and programme and we will return a production and delivery plan you can build your site schedule around.

Send Your Wardrobe Drawings

Share room dimensions, finish references and your site programme. We will confirm the specification, packing plan and freight arrangement for your project order in one reply.