Bathroom Lighting & Accessories

A vanity lighting quotation rarely fails because of price. It fails because the information on both sides does not match: a mirror that is 100 mm wider than the fitting, a driver behind a cabinet that no one planned for, or a finish that cannot be produced in the size required. The checklist below shows exactly what to send so that our team can quote vanity lighting once, accurately, and move straight into production.

Start With the Room, Not the Fixture

Our bathroom lighting is made to measure rather than picked from a fixed size chart. That means we need the space before we can price the fitting. Send us the wall elevation or a simple sketch of the vanity zone: overall wall width, the position of the mirror and basin, the height of the countertop, and where the existing electrical outlet sits. A photograph taken straight on, with the measurements marked on it, is usually enough to start.

If the lighting has to coordinate with other pieces in the same room, tell us which ones. Vanity lights are most often specified alongside a double vanity or a mirror cabinet, and we produce those to the same finish family. Specifying them together avoids the mismatch that appears when the joinery comes from one supplier and the lighting from another.

What We Need in Writing

ItemWhy it changes the quote
Overall length and height, plus distance from countertop to fittingSets the frame profile, the diffuser length and how the fitting is supported.
Mounting method: wall bracket, recessed into a niche, or integrated into cabinet joineryDetermines the sub-frame, the fixing detail and whether a rebate has to be machined.
Switch and driver location, and who supplies themA driver hidden inside a cabinet needs access space and ventilation; a surface switch changes the cable route.
Frame finish and diffuser typeFinish samples and diffuser choice are priced per batch, so state them at enquiry stage rather than after tooling.
Quantity and how it is split across rooms or buildingsA single villa with four bathrooms and a block of apartments need different packaging and spares planning.
Delivery address, port of discharge and IncotermsCrating volume and freight mode are calculated from the destination, not from the fitting alone.
Target on-site date and the inspection milestoneFixes the production slot and the point by which drawings must be signed off.

Electrical Details to Confirm Early

This is the part most enquiries leave out, and it is the part that causes rework. Supply voltage and frequency at site, local wiring practice for bathrooms, the switching arrangement, and whether dimming is required all affect the driver we quote. For fittings installed close to a basin or shower enclosure, the protection rating has to be agreed with the project electrician before order confirmation.

We do not certify an installation against local regulations on your behalf. Tell us the voltage, frequency and the zone the fitting sits in, and we will match the luminaire and driver accordingly; your electrical contractor confirms compliance for the site.

How Our Quotation Comes Back

Once the above is with us, you receive a specification sheet showing the proposed fitting with its dimensions and finish, the unit price against the stated quantity, packaging and crating details, and the freight option for the named destination. Where the fitting integrates into joinery (an illuminated mirror cabinet, or Santerson Wall Sconces arranged along the vanity wall), the drawing also shows the interface our team needs from the cabinet maker.

Drawings go back and forth until the dimensions are signed off. Production does not start on an unconfirmed drawing, because made-to-measure work cannot be resized afterwards without remaking the frame.

Three Mistakes That Delay a Quote

  • Sending only a photograph. A picture of a showroom fitting tells us nothing about your wall width or mounting condition. Add the measurements.
  • Quoting one bathroom and ordering for twelve. Send the full room schedule so we price the real quantity and plan spares in the same batch.
  • Leaving the driver and switch to site electricians at the last minute. State the switching layout at enquiry stage, otherwise the fitting arrives with the wrong cable entry.

Send Your Enquiry

What to include in your first message

Room schedule and quantities; wall elevation with dimensions; mounting method; finish preference; voltage, frequency and switching arrangement; delivery destination; target on-site date. Send it as one enquiry and we will return a specification sheet and priced quotation for the whole set.

For projects that also need the joinery, ceramics and accessories for the same bathrooms, send those schedules in the same enquiry. Coordinating lighting with vanities, mirror cabinets and wall panels at one time keeps finishes consistent and puts everything on a single production and delivery plan.