An outdoor swim spa of this size is not a product you simply place on a plan and hope it fits. The Outdoor Swim Spa WS-130CⅢ-U sits near the long end of our configurable swim and hydrotherapy range, and projects succeed or fail on whether the design drawings, the civil works and the equipment schedule agree with each other before production starts. The following coordination checklist is written for architects, main contractors and procurement teams who are specifying the unit as part of a villa, resort or clubhouse scheme.

Start from the footprint, not the brochure image

The catalogue lists this model at 11830 × 3000 × 1430 mm. Treat those figures as the starting datum for setting-out, and confirm the final shell dimensions against the production drawings for the configuration you order. On site you then need to reconcile three separate measurements on the same drawing sheet:

  • Structural footprint — the cabinet outline that the slab or deck opening must receive.
  • Finished rim level — whether the spa is recessed, semi-recessed or raised on a plinth, and how the coping meets the surrounding paving.
  • Service envelope — clear access to the control system, pumps, filter pump and jet circuit, which must remain reachable after the finishes are installed.

Where the spa is set into a timber deck or stone terrace, show the coping detail and the fall of the surrounding finish away from the rim on the same sheet. A dimension conflict discovered in the workshop costs a revision; the same conflict discovered after tiling costs a demolition.

What the specification sheet actually tells the services engineer

Recorded on the product page for WS-130CⅢ-U

  • Catalogue dimensions: 11830 × 3000 × 1430 mm
  • Control system: 1 set
  • Water pump: 4 pcs
  • Filter pump: 1 pc
  • Jet total: 23 pcs
  • LED lights: 5
  • Total power: 11.85 kW
  • Features shown: water jets, LED lighting, ozone

Figures are transcribed from the product page for this model and apply to the catalogue configuration. Confirm the equipment list, electrical load and control arrangement for the specification you order.

Four water pumps plus a filter pump against a total power figure of 11.85 kW is the number the electrical designer must design to — cable sizing, protective device, isolation, residual-current protection and the location of the control panel all follow from it. Ask for the wiring diagram and the required supply characteristics early, because the plant-room or equipment-bay position is constrained by both cable length and access.

It is also worth noting that a variant with the same shell size — WS-130CⅢ — carries a swim training system and a different pump and jet arrangement. If the brief calls for counter-current swimming, say so in the specification rather than assuming the model suffix decides it; the equipment schedule, not the model name, is what should be tendered.

Options that change the drawings

Catalogue options for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each of them has a consequence somewhere other than the spa itself:

  • Heat pump — outdoor position, condensate drainage, noise distance to neighbours and an addition to the connected load.
  • Sand filtration — plant footprint, valve access and a drain point for backwashing.
  • Insulation — wall build-up and total external dimensions in a recessed installation.
  • Steps — the approach side, the effective water depth at entry and how steps meet the coping.
  • Ozone and UV sterilisation — equipment location, ventilation and maintenance access.

Decide these options before the mechanical and electrical drawings are issued. Adding a heat pump after coordination is normally what forces the plant bay to move.

Where a custom shape changes the conversation

Not every terrace takes an 11.8-metre rectangle. Where the layout calls for a square, round, oval or curved basin to suit the space and how it will be used, our Customizable Shape Outdoor Spa is developed from an acrylic shell with structural reinforcement for gardens, terraces and leisure areas. In that case the coordination sequence shifts: the design intent comes first, and the manufacturer's shop drawings become the setting-out document that the civil package follows.

Coordinating the spa with the rest of the outdoor package

A swim spa is rarely the only outdoor element on a project. Sun loungers, cabana daybeds, pergolas and poolside dining have to be set out around splashing zones, shading, drainage channels and maintenance routes. Coordinating those items with the same supplier keeps levels, finishes and delivery phases consistent — see our Outdoor Furniture for Villas and Resorts range and the wider Swimming Pools and Swim Spas category.

Our Turnkey Villa Furnishing service covers design consultation and space planning, material selection and product specification, manufacturing and quality control, then project management with site coordination. On the delivery side, Furniture Logistics and Door-to-door Delivery handles freight forwarding, packaging and container loading, customs paperwork and shipment tracking, while Furniture Installation and After-sales Support covers on-site installation, inspection and snags. Import terms, duties, transit times and site access should be agreed for each project individually.

The pre-production sign-off list

  • Confirmed shell dimensions and finished rim level on the setting-out drawing.
  • Equipment schedule signed off: control system, pumps, filter pump, jets, lighting, ozone.
  • Total connected load and supply characteristics agreed with the electrical designer.
  • Access to equipment and filters maintained in the finished layout.
  • Options fixed — heat pump, sand filtration, insulation, steps, UV.
  • Coping, drainage fall and waterproofing detail resolved with the civil package.
  • Delivery route, offloading method and crane or lifting requirement agreed before shipment.

Send us the layout drawing, the intended use of the spa and your services constraints, and we will return shop drawings and an equipment schedule for that configuration — including dimensions, pump and jet arrangement, total power and the options you have selected — so everything is agreed before production begins. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or through our contact page.