A bidet rarely appears on the first page of a bathroom fixture schedule, and that is exactly why it causes problems on site. This guide sets out what a procurement team should record before ordering the Floor Standing Bidet 1038F, Ceramic Bidet Basin for Bathroom Hygiene from SANTERSON — the mounting detail, the drainage and rough-in information, the suite pairing, and the verification points that keep a guest-room or villa bathroom package consistent.
Why the bidet still belongs on a project fixture schedule
In hospitality and villa work across Australia, the Middle East and Southeast Asia, a bidet is specified where guests and residents expect personal hygiene fixtures as part of the bathroom, not as an optional extra. Omitting it from the schedule does not remove the requirement — it simply moves the decision to the contractor at a point when wall finishes, floor tiles and waste positions are already fixed.
Recording the bidet on the same schedule line as the water closet has a second benefit: it forces the team to confirm that the two fixtures were designed as a set. The 1038F is described by its product page as matching the 1038 series toilet, so specifying both together keeps bowl shape, glaze and proportions consistent across every guest bathroom.
What the 1038F record should state
The published product description gives three facts that belong in a procurement file, each written down in the supplier's own terms rather than paraphrased into assumptions:
- Structure. The 1038F is a freestanding ceramic bidet that is fixed to the wall at the back for support. It rests on the floor and does not carry a concealed cistern or a wall-hung frame.
- Body and glaze. The description refers to an ergonomic curved body for comfortable use, and to a glossy ceramic glaze that repels dirt and limescale so the fixture is simple to maintain.
- Suite pairing. It is offered as part of a complete bathroom sanitary suite with the matching 1038 series toilet, and is positioned for home bathrooms, hotels and high-end villa renovation.
Anything beyond those points — overall length, width, height, trap type, rough-in dimension, water connection size, flushing or spray performance, weight, warranty period — is not stated on the product page we are working from. Those values must come from the current technical sheet for the order in question and be recorded with a revision date.
The documentation checklist
Before a purchase order is raised, the following items should exist in writing, either in the specification document or in a supplier confirmation attached to the order:
| Item to document | What good looks like |
|---|---|
| Fixture identification | Model 1038F, full product title and the product page URL, so nobody substitutes a similar-looking bidet at a later stage. |
| Mounting method | Freestanding floor-mounted body with back-to-wall fixing. Confirm what fixing hardware is supplied and what the substrate must be capable of carrying. |
| Drainage and connection | Trap type, rough-in dimension, waste outlet position and water inlet size, taken from the technical sheet for this production run — not from a drawing detail carried over from another project. |
| Suite consistency | The matching 1038 series toilet recorded on the same schedule line, with glaze and colour confirmed as one batch reference. |
| Quantity by room type | Bidet count per guest-room type or villa floor plan, cross-checked against the room schedule so variations are not missed. |
| Surface and cleaning regime | The glaze described on the page, plus the cleaning agents the site's maintenance team is allowed to use, so warranties are not voided by the wrong products. |
| Packaging, handling and storage | Ceramics are breakage-prone; record packing standard, container loading plan and on-site storage before fixtures are delivered. |
| Inspection and snags | A named acceptance step on delivery — glaze defects, chips, correct model — with photographic records kept per batch. |
Where projects usually go wrong
Assuming the waste layout is universal
Floor-standing and wall-hung ceramics take waste differently, and rough-in dimensions vary between models. The 1038F's own page does not publish its trap or rough-in figures, so a contractor working from a generic bathroom detail risks setting the waste in the wrong place. Record the figure from the technical sheet before the slab or floor screed is poured.
Mixing series across floors
A hotel that pairs a 1038F bidet with an unrelated toilet will show the mismatch in every photograph the marketing team takes later. Keep the suite pairing on one schedule line and make substitutions a formal change, not a site decision.
Leaving the wall fixing to the installer
The 1038F relies on a back-to-wall fixing for stability. If the wall behind is stud partition, tiled substrate or masonry changes between room types, that difference should be documented in advance so the correct fixings and, where needed, reinforcement arrive with the fixtures.
Related fixtures worth documenting in the same package
Bathroom packages are easier to coordinate when comparable fixtures share one documentation format. For the alternatives and complements below, the same checklist applies — mounting method, drainage data, suite pairing, quantity by room type:
- Wall Hung Bidet 1004F — a wall-mounted option fixed with a back panel, which keeps the floor clear and changes what the waste and carrier arrangement must be.
- Two Piece Washdown Toilet 1038A — the two-piece WC in the same series family, listed with both floor and wall outlet options; useful where a project needs one consistent look across different drainage conditions.
- Wall Hung Toilet 1038W — the wall-hung counterpart, with a hidden tank and an empty floor area beneath.
- Wall Hung Basin 1038WB — the wall-mounted basin in the same group, so washroom and guest bathroom finishes read as one set.
How SANTERSON supports this part of a package
SANTERSON is a China-based furniture and building materials supplier working on villa, hospitality and office projects, with sanitary fixtures inside a wider range that also covers cabinetry, flooring, wall and ceiling finishes, lighting and furniture. For procurement teams this means one supplier can hold the ceramic suite, the joinery and the loose furniture for the same guest-room type, which reduces the number of separate schedules to reconcile.
The services the company publishes are the ones to write into the project programme: custom and OEM service for bespoke specification work, logistics and door-to-door delivery, and installation and after-sales support. Record the agreed scope, Incoterms, inspection points and contact names for each of those stages in writing; freight routing, import handling and site access differ by destination and should be confirmed per project rather than assumed.
Verification note. Dimensions, trap type, rough-in dimension, material standards and compliance requirements for the 1038F are not published on the product page used here. Request the current technical sheet and confirm local plumbing and building requirements with the project's engineer before any figure is issued for construction.
Request the 1038F technical sheet
Send the room schedule, the drainage conditions for each bathroom type and the required delivery destination, and we will confirm suite pairing options with the matching 1038 series toilet. Contact SANTERSON — Contact Us, phone/WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.