A swim spa is one of the few outdoor purchases where shell, water systems and site works all have to agree with each other before a litre is filled. The checklist below follows the way Outdoor Swim Spa WS-S06B-T is quoted at SANTERSON, so you can take it straight to your builder, electrician or procurement team and use it as a request-for-information sheet.

1. Confirm the shell envelope against your site, not the other way round

Start with the footprint and work outwards. The catalogue lists WS-S06B-T at 5800 × 2200 × 1420 mm, a long-lane layout that is deeper in section than the standard WS-S06B shell of the same length and width. Measure three things before you shortlist anything:

  • The clear opening on plan, plus an access route for delivery — the shell travels intact, so door widths, gates and crane or HIAB reach matter as much as the final position.
  • Whether the unit sits above ground on a deck or slab, is partly recessed, or is fully sunk. Recessing changes drainage, ventilation to the equipment bay and access for servicing.
  • The finished height including steps. The 1420 mm depth assumes the catalogue shell; fitted steps and coping add to the level you have to design around.

2. Check which systems are in the quoted configuration

Model codes on the SANTERSON swim spa range describe a base build, and options change what actually ships. For WS-S06B-T the specifications shown on the site list one control system, one swim training system, one water pump, one filter pump, 40 jets in total, three LED lights plus 26 small LED lights, and a total power figure of 8.75 kW. Treat those numbers as the starting point for your enquiry and ask the factory to restate them in writing for the exact configuration you order — that single line protects you against the most common sourcing mistake in this category, which is comparing two listings that look identical but carry different pumps.

Item on the checklistWhat to ask the supplier
Swim training systemConfirm one unit is included and which nozzle arrangement is quoted. WS-S06B-T is shown with a swim training system; the closely related WS-S06B listing does not show that item, so do not assume the two are interchangeable.
Water pumpNumber of pumps and their duty. Plan area alone does not indicate the pump package, so ask for the pump schedule against your model code.
JetsTotal jet count and where they are laid out. Jet count drives pump sizing, so it belongs in the same conversation as the pump schedule.
Temperature settingWhether the control package includes temperature setting as a listed feature, and what heats the water. A heat pump is a catalogue option on this range, not an automatic inclusion.
OzoneOzonation is shown for this model; ask how it pairs with the filter pump cycle and what consumables you replace each year.
LED lightingNumber of main lights and small LED lights, plus how they are fed and switched from the control system.
Insulation and stepsBoth are listed options. Insulation is what keeps a year-round swim spa economical in cooler months; steps change entry height and site access.

Worth noting when you compare listings: the same 5800 × 2200 plan area also appears in a variant quoted with three water pumps, 48 jets and a waterfall at a higher total power figure. Plan size alone says nothing about the equipment package, which is exactly why the schedule has to be confirmed model by model.

Options recorded in the catalogue for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so confirm each option against the model you are ordering rather than the series name.

3. Lock down the electrical scope before production starts

Total power of 8.75 kW for the configuration shown is the figure to hand your electrician, but it is not a complete electrical brief on its own. A usable checklist entry asks: supply voltage and phase available at the site; dedicated circuit sizing and protection; routing and termination point for the cable; bonding and earthing details as required by the regulations in your country; and who supplies the isolator or distribution board. SANTERSON confirms the electrical requirement for the selected configuration, while a licensed local electrician carries out the installation — this is not a decision to leave open until delivery week.

4. Specify the base, drainage and weather exposure

A swim spa sitting on a poorly prepared slab will complain for years as noise, distorted panels and water pooling around the equipment bay. The checklist asks buyers to confirm:

  • A level, structurally adequate base sized beyond the shell footprint, designed for the filled weight plus occupants — your engineer signs this off.
  • Provision for overflow and any drain-down water, away from the equipment access side.
  • Ventilation if the unit is recessed or boxed in, so the equipment bay is not working in trapped humid air.
  • Exposure. Deck-level installations beside a pool carry chlorine-rich air; pergolas, outdoor furniture and hardtop structures nearby should be aluminium-framed so the whole terrace ages at the same rate.

5. Decide how it will be used, then match the model

The last item on a complete checklist is honest about purpose, because it decides which of the 5800 mm variants you should actually buy. Daily lap training points to a configuration with a swim current and temperature setting, which is what WS-S06B-T is shown with. A family or resort terrace where hydrotherapy and water features lead the brief points elsewhere in the range — for example the same plan size appears with a waterfall arrangement and additional water pumps. If the brief is still open, send it over and the configurations can be compared against it rather than pushing one fixed model.

6. Cover delivery, coordination and after-handover support

Swim spas rarely fail on the shell; they fail at the seams between trades. As a one-stop furniture and building materials supplier, SANTERSON handles this part of the job as part of project delivery: logistics and door-to-door delivery covering freight booking, packaging, container loading and customs paperwork, followed by installation and after-sales support for site commissioning, inspection and spare parts. Where a swim spa sits inside a wider villa or hospitality fit-out, it is coordinated with the surrounding scope — paving, pergolas, loungers, cabanas and bathroom fixtures — so one party answers for the whole outdoor zone instead of five.

For custom work, dimensions, cabinet finish and equipment layout can be developed through the custom and OEM service, which is the route project buyers take when a standard catalogue size does not suit the terrace plan.

Ready to price your configuration?

Send the shell size, the equipment list you want confirmed, the electrical supply available on site and one photograph of the intended location to the SANTERSON team. You will get back a specification sheet for that exact configuration — including the pump schedule, jet layout, options included and what is quoted separately — so any comparison against another quotation is like for like.