A mixed open and closed storage wall looks simple on a mood board and turns into the most negotiated item on the joinery schedule once ordering starts. The Santerson Mixed Open & Closed Storage collection is made to measure, so the quantity question is never "how many boxes" — it is how many runs, how each run is subdivided, and which other built-in elements have to arrive with it. This guide walks through the counting logic, the coordination points, and the information you need on the drawing before a quotation can be trusted.

What You Are Actually Ordering

Integrated storage walls are specified as wall systems rather than as freestanding furniture. A single elevation can carry closed carcasses, open shelving, display niches and a sliding panel front, all in one continuous run with matching finish and profile lines. Because dimensions, layout, material and finish are set per project, the unit of measure on your schedule should be the linear metre of wall or the individual module — whichever matches how your site drawings are dimensioned — not a piece count copied from a showroom photo.

Three product families usually sit in the same conversation, and mixing them up is the most common source of quantity errors:

  • Mixed Open & Closed Storage — the main carcass run, combining closed storage with open bays in one wall system.
  • Open Display Niches — recessed or frameless display openings set into the same wall build-up.
  • Sliding Storage Panels — panel fronts that close off part of the run, which brings track, clearance and hardware coordination with it.

Where a living-room scheme is being built from modular components instead of a fixed wall build-up, the matching range is Santerson Mixed Open & Closed Systems under Modular Living Systems. Same open/closed logic, different measurement basis: modular units are counted as units and stacks, wall systems as runs and metres. Decide which one you are pricing before you count anything.

Counting the Run: A Practical Quantity Method

Work from the architectural elevation, not from a 3D render. Renders flatter proportions and hide the ceiling line, skirting, doors and services that consume wall length.

Step 1 — Establish net wall length

Take the gross run length and subtract everything the storage wall cannot occupy: door openings and their swing or pocket allowance, radiator or service risers you are not boxing in, curtain recesses, switchboards that must stay accessible, and any structural column. Record the deductions as line items so a site team can check them later.

Step 2 — Split the net length into functional zones

Assign each stretch to a job: hanging storage, drawer storage for everyday items, closed cupboards for bulky or unsightly items, open bays for books and objects, niches for display. A wall that is all closed looks like a wardrobe; a wall that is all open collects dust and shows clutter. Most rooms need both, and the split should follow what the room actually stores.

Step 3 — Set module widths to the finish detail

Open bays and closed doors read best when their joints line up with each other and with adjacent joinery. Fix your module widths after you know the door style and profile, because rebates, panel thickness and handle detail eat into clear opening width. If a run will not divide evenly, put the tolerance in one wide closed cupboard rather than shaving 20 mm off every module.

Step 4 — Count heights as full height or partial

Ceiling-height runs need a top closure strategy: run to the ceiling with a fixed filler and dust-proof top, or stop below and accept a shelf gap. Santerson Full Height Storage Walls is the reference detail when the wall goes floor to ceiling in one build-up. Whatever you choose, note it on the elevation — top closure changes both the panel schedule and the site sequence.

Step 5 — Add the interface items

Integrated lighting inside open bays, a countertop or stone surface in the same wall zone, an integrated media storage position with cable routes, and matching decorative concealed doors that disappear into the panelling all belong on the same schedule. List them against the run they attach to.

A Quantity Sheet That Holds Up in Production

A workable schedule for a storage wall carries the following columns. Anything missing becomes an email chain during production.

FieldWhy it matters
Run ID and roomTies the item to one drawing elevation, so two rooms with similar joinery are never confused.
Net length × height × depthDepth changes with the use: shallow for display and media, deeper for hanging and bulky storage. State it per run.
Module breakdownNumber of open bays, closed doors, drawers, niches — with widths, so the factory and site read the same wall.
Door and panel typeHinged, sliding or concealed front determines hardware, clearance and the wall build-up behind it.
Material and finishSpecified per project; record the exact sample reference used at approval, not just a colour name.
Services and lightingCable routes, transformer access and driver locations for lit niches and open shelves.
Interface itemsAdjacent panelling, flooring transition, skirting treatment, stone or counter surfaces in the same zone.
Site condition dateThe date levels, floor heights and finishes were confirmed — critical for made-to-measure work.
Made-to-measure means the drawing is the order. Dimensions, storage layout, finish and any electrical provision are confirmed against the final configuration before production starts; a quantity sheet that only gives overall length will not carry those decisions.

Coordinating the Storage Wall With the Rest of the Fit-Out

Storage walls rarely stand alone. They meet flooring, wall panelling, doors and lighting, and each junction needs an owner on the programme.

Flooring first, or joinery first

Decide whether the wall sits on the finished floor or on the subfloor with a perimeter shadow gap. Engineered oak runs — for example European Oak Herringbone Engineered Wood Flooring or Charcoal European Oak Engineered Wood Flooring — set the completed floor level, and that level drives the carcass height. Fix the floor build-up before heights are frozen.

Panelling and doors in the same language

When the storage wall continues into wall panel systems, or when a doorway has to read as part of the joinery, profile direction, joint spacing and finish have to match across trades. Specify panelling and doors with the joinery package rather than in a separate later lot; matching samples ordered late is how visual continuity gets lost.

Lighting inside the open bays

Lit niches and shelves need driver access, a switched or controlled circuit, and a cable route decided before the carcass closes. Integrated cabinet lighting and matching sconces should appear on the same reflected ceiling and power drawing as the joinery elevation.

Bedroom storage in the same finish family

Where wardrobes sit in the same corridor or room, keep them in one specification so carcass, door and handle details match. Boutique Style Walk in Wardrobes and the modular wardrobe range are usually scheduled alongside the wall system rather than after it.

Sequencing, Delivery and Site Readiness

For villa and apartment projects working with a one-stop furniture and building materials supplier, the storage wall is usually one of the last joinery packages to install and one of the first to be measured. That timing gap is where errors come from.

  • Confirm final floor levels, wall straightness and ceiling heights on site before final dimensions are released.
  • Freeze the finish sample reference in writing; keep the approved physical sample until handover.
  • Book the second-fix date around the wall: paint touch-up, flooring edge detail and skirting all meet it.
  • Check service routes — power, data, lighting circuits — are installed, tested and documented before panels close.
  • Protect carcasses during later trades; specify who is responsible for protection until practical completion.

SANTERSON's project route covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Freight by sea, air or rail, customs documentation and door-to-door delivery sit in the same package, which matters when joinery, building materials and loose furniture are ordered together for one building.

Project scope, transit arrangements and site support are agreed per project. Confirm current terms, dimensions and technical specifications for the configuration you are ordering rather than assuming a standard package applies.

Five Mistakes That Cost Money on Storage Walls

  • Counting from the render. Renders hide openings and services; measure from the elevation with deductions listed.
  • Splitting open bays evenly everywhere. Even joints look tidy but waste height on tall items. Vary bay heights to what is stored, keep the joint line consistent.
  • Leaving sliding panels to a later lot. Track positions, wall build-up and clearance affect the carcass; decide them at specification stage.
  • Naming finishes by colour alone. "Matte grey" is not a specification. Record the sample reference and the surface texture.
  • Ignoring top-of-wall closure. A dust gap at ceiling height is a maintenance item forever; choose the detail and draw it.

A Short Pre-Order Checklist

  • Elevation drawings with net lengths, deductions and levels confirmed on site
  • Module schedule: open bays, closed doors, drawers, niches, widths and heights
  • Door and panel type per zone, including any sliding or concealed fronts
  • Material and finish references approved against physical samples
  • Electrical provisions for lighting and media, with driver access noted
  • Interfaces with flooring, panelling, doors and skirting assigned to a trade
  • Delivery window matched to the site programme and storage on site

Get those seven items onto one document and the quotation stops moving. The wall becomes a set of confirmed dimensions instead of an open discussion.

Where Mixed Storage Works Hardest

In villas and apartments, the same mixed logic repeats across zones. A media wall carries open shelving for books and closed carcasses for consoles and games. A hallway run hides coats and hoover equipment behind doors while leaving a niche for keys and post. A study pairs closed filing with open shelves within arm's reach of the desk. Each zone is one line on your schedule, drawn at the same scale, in the same finish family as modular living systems elsewhere in the building.

For hospitality and serviced-apartment work, the split also drives housekeeping. Closed fronts reduce dusting and make contents invisible to guests; open bays need curated objects and a cleaning routine that can reach them. Specify which party curates the open shelves at handover, and keep the open proportion modest in rooms cleaned on a fixed cycle.

Planning a storage wall, wardrobe package or a wider villa fit-out? Send your elevations and finish references to the SANTERSON team for a project-specific specification and quotation.