A cabinet enquiry rarely fails over colour. It fails over numbers nobody wrote down: the height under the window sill, the depth that has to clear a radiator, the run of skirting a door must swing past. If you are specifying matte pvc cabinets for a villa or apartment fit-out, the quality of your drawings and the completeness of your project inputs decide whether the quotation you receive is comparable across suppliers — and whether the carcase arrives fitting the opening it was built for.
SANTERSON manufactures these cabinets to order rather than to a fixed modular size. The product page states three things plainly: made-to-measure sizing, material and finish options, and a layout tailored to the project. That flexibility is useful, but it moves work upstream onto you. This guide sets out what to measure on site and what to send with your enquiry so that a made-to-measure quotation can be checked line by line.
Start With the Room Envelope, Not the Cabinet
Before any door style is chosen, record the shell the cabinets have to live inside. Kitchen failures are usually clashes with existing elements, not faults in the carcase.
- Run lengths along each wall, measured corner to corner at two heights — floor level and worktop level. Older villas and renovated properties are rarely square, and a 15 mm difference between the two readings tells you which wall needs a scribe or a filler panel.
- Finished floor level. Note the floor build-up that will exist at installation, not the bare slab. Cabinet heights and appliance recesses are quoted from the finished surface.
- Projection of obstructions: radiators, downpipes, window reveals, skirting, door architraves and any ceiling bulkhead. Give the distance from each obstruction to the wall face and its height above floor.
- Ceiling height and its variation across the room. Tall units that run to the ceiling need this figure at both ends of the run, not one average.
- Opening widths and positions for doors and windows, including the direction each door swings, because a swing arc dictates where a tall unit cannot stand.
The Worktop and Appliance Numbers That Lock Everything Else
Worktop thickness and appliance choices set carcase heights and depths, so decide them before you request a quotation rather than after. Carry these figures into your drawing:
| Input | What to record | Why it matters at this stage |
|---|---|---|
| Worktop material and thickness | Product name or sample reference, plus the finished edge detail you want | Determines carcase height and whether doors need a clearance adjustment at the counter line |
| Integrated appliances | Model numbers or dimensional drawings for oven, hob, extractor, dishwasher, fridge and wine cooler | Appliance recesses are built around published dimensions; a late model change means rebuilt tall units |
| Sink and tap | Cut-out size, bowl depth, tap reach and whether the sink is undermount or top-mount | Sets base-unit width, drawer placement under the bowl and the strengthening needed in the base |
| Hob and extractor route | Duct route, ceiling void depth, damper position | Affects upper-unit depth and whether a decorative hood case is required |
| Electrical points and lighting | Socket positions, switching, and any internal cabinet lighting circuits | Drill patterns for internal lighting must be planned before panels are machined |
| Plumbing waste position | Waste height off floor and distance from the wall | Constrains drawer layout beneath the sink run |
Where an appliance has not yet been selected, send the dimensional envelope you are willing to work within — maximum width, height and depth of the recess — and ask for that zone to be quoted as a variable line. That keeps the rest of the quotation firm while leaving one item open.
Interior Layout: What to Specify Inside the Carcase
Made-to-measure sizing is only valuable if the inside is planned as carefully as the front. For each unit in the run, state what it has to hold.
- Storage type per unit: deep drawers for pots, pull-out larder racking for dry goods, cutlery trays, shelf stacks for dishes, or open display niches. Storage habits change drawer counts more than aesthetics do.
- Corner treatment, since this is where cost and usability diverge sharply — a magic corner, a carousel, pull-out shelves, or simply a blind corner with a door. Quote the option you intend to buy, not all three.
- Tall-unit role: oven housing, pantry, integrated fridge, utility store, or a combination. Each has a different ventilation and access requirement.
- Laundry and utility integration, if the kitchen shares a wall with laundry plant. Stacked units and pull out laundry hampers need their own service clearances and access paths, which should be drawn rather than assumed.
- Internal finish: shelf load rating for heavy items, and edge treatment on visible carcass interiors where open shelving is exposed.
Finish Selection: Why Matte Needs Samples Under Your Own Light
A matte surface reads very differently under halogen downlights than under cool LED strips, and it shows handling marks that a gloss finish hides. Two practical points follow.
First, order a physical sample panel and view it in the actual room at both day and night before signing off the colour. Second, decide early whether you want a handleless profile or a visible handle, because the routing differs and it changes the minimum gap between adjacent doors.
The flat, low-reflection surface used across this collection; suited to minimalist and two-tone schemes where gloss would compete with stone or glass.
A timber-look alternative in the same wood grain pvc cabinet line, useful when you want a warm accent run against matte fronts.
Display sections from the same family, such as a Santerson Glass Front Pvc Cabinet, break up a long run of solid doors.
Send the finish reference for every unit, including panels that are only visible when a door opens. Where you want two tones — for example a darker tall-unit block against lighter base units — list them as separate line items so pricing is not confused by a single blended description.
A note on naming. Product titles and specification blocks on product pages do not always use the same wording for the same item; some pages in this range describe plywood construction while others describe PVC. Treat material as something to confirm against your own quotation, and keep the exact finish reference you approved in the order paperwork.
Project Inputs That Belong in the Enquiry Package
For a project enquiry, drawings alone are not enough. The following inputs let a manufacturer price the job once instead of three times:
- Room drawings with dimensions marked, plus elevations of every cabinet wall showing sockets, windows and obstructions.
- Unit schedule — one line per unit: width, height, depth, door or drawer configuration, finish reference, internal fittings.
- Scope beyond the kitchen. Where cabinetry continues into wardrobes, media walls or vanities, send those elevations too; matching finishes across rooms is far easier to price and to produce in one batch. The same supplier also builds Santerson Floating Vanity units and full-height storage walls, so a single finish schedule can cover several rooms.
- Delivery address, access conditions and floor level, since vehicle size, lift dimensions and stair widths determine how panels reach the room.
- Programme dates: site handover date and the date cabinets must land on site, working backwards from that.
- Who installs. Decide whether your own trades fit the units or whether installation support is requested; either way, state it so responsibilities are clear in writing.
SANTERSON's services span design coordination, custom and OEM work, logistics with door-to-door delivery, and installation with after-sales support. For a project buying from one supplier for furniture and building materials, that means the same enquiry can also cover flooring, wall panelling, lighting and bathroom ceramics — items that otherwise get specified late and then clash with the cabinet colour or threshold heights.
A Pre-Order Checklist
Confirm before the order is released
- Two height readings per wall run, and a written note of which walls are out of square.
- Finished floor level confirmed for every room in the cabinetry scope.
- All appliance model numbers fixed, or clearly marked as open with a dimensional envelope.
- Worktop thickness agreed in writing, with sample reference.
- Corner and tall-unit internals specified, not left to "standard".
- Finish samples viewed in the room under its own lighting and signed off by name and date.
- Handle or handleless profile chosen for every door run.
- Delivery access route measured, including lifts and stair turns.
- Site programme dates stated, with the required on-site date working backwards from handover.
- Responsibility for installation, inspection and snagging named in the order.
Send measurements and inputs this complete, and a made-to-measure quotation becomes something you can compare line against line rather than a single figure you have to trust. If your drawings are at concept stage, share them anyway with the unknowns labelled — early review of an incomplete set is cheaper than a rebuild after panels are cut.