A media wall looks simple on a drawing and complicated on site. Before a Santerson Integrated TV Panel can be made, priced and shipped, someone has to answer a long list of questions about the wall, the screen, the services inside the wall and how the room will actually be used. This article sets out the measurements and project inputs that let our team quote a buildable design rather than an approximation.
Why the Input List Matters More Than the Finish
Integrated TV panels sit at the intersection of joinery, wall cladding, electrical work and AV equipment. Unlike a freestanding cabinet that can be adjusted after delivery, an integrated panel is fixed to the structure and hides services behind it. A missing dimension or an undecided screen size does not just delay production; it usually means a panel arrives that cannot receive the television, or a recess that clashes with a socket already on site.
Santerson has manufactured furniture and building materials for project work since 2008, and media walls are made to order rather than stocked. The product page states that finish, layout and dimensions are specified per space, and that dimensions and technical needs must be confirmed for each project. Everything below is the practical detail behind that sentence.
Group 1: Room and Wall Dimensions
Send the wall first, before any aesthetic discussion. We need:
- Total wall width and floor-to-ceiling height, measured at a minimum of three points along each direction, because walls are rarely square or plumb.
- Floor finish build-up — the thickness of the screed, adhesive and final floor covering. A villa still in structure will have a bare slab; the finished level determines where the base of a full-height panel actually sits.
- Ceiling condition — exposed slab, plasterboard, coffered, or a bulkhead that the panel must meet or wrap around.
- Obstructions: skirting lines, radiator positions, downlights, air diffusers, switch plates, door and window reveals, and any column or beam projection into the wall plane.
- Room depth and viewing distance, which governs how deep the panel assembly can be and what screen size is comfortable to watch from the seating line.
- Adjacent finishes, including the material of the returning wall and ceiling, so the reveal and shadow gap can be resolved rather than guessed on site.
Group 2: Television and Equipment Inputs
The screen is not a decorative rectangle; it is a piece of equipment with a fixing pattern, a cable exit and a service clearance. Please provide:
| Input | Why we need it |
|---|---|
| Screen size and model, or the size range under consideration | Sets the opening proportions, mounting batten positions and weight distribution across the wall. |
| Mount type: fixed, tilt, full-motion arm or flush recessed | A pull-out arm needs a deeper pocket and a clear access zone behind the screen. |
| VESA pattern and unit weight if known | Determines reinforcement and the substrate behind the panel. |
| Bezel style (standard or ultra-thin) | Affects whether the screen sits proud, flush or recessed within the panel face. |
| Sources to be housed: soundbar, media player, console, AV receiver, set-top box | Each item needs a shelf, ventilation and a route for its cabling. |
| Speaker arrangement, including in-wall or in-shelf speakers | Cut-outs and acoustic detailing must be resolved before the panel is machined. |
Group 3: Services Behind the Wall
This is where most enquiries lose time. Tell us what already exists and what is still to come:
- Position of the mains outlet and low-voltage points, measured from a fixed corner and from finished floor level.
- Cable types and counts: HDMI, fibre, ethernet, speaker cable, aerial feed. Note whether conduit is already installed and whether it has a draw wire.
- Power for integrated lighting, including driver location and switching arrangement. Driver access matters more than driver position — a driver sealed behind a fixed panel cannot be replaced.
- Ventilation requirements for any enclosed equipment bay, especially for components that generate heat.
- Who is responsible for first-fix electrical work, and at what stage. Our panels are manufactured to receive your services, not to replace the electrician's scope.
Group 4: Layout and Storage Intent
Once the wall and services are defined, the layout conversation becomes concrete. Useful inputs:
- Open versus closed ratio. Projects that want the television to disappear when off usually lean toward closed storage; projects with books and objects lean toward open shelving. The Storage & Display Combo is the middle path most villa clients settle on.
- Shelf spans and expected loads, particularly for books, ceramics or stone objects. Long unsupported spans need a different substrate than display shelving for light decor.
- Door mechanism preference: hinged, sliding or push-to-open handles. Sliding fronts pair naturally with the Sliding Panel TV System when the screen should be concealed.
- Cable management preference: grommet, slot, or a fully hidden trunking route inside the carcass.
- Lighting intent. Where the wall itself carries the light design, Backlit Feature Walls are a separate specification with their own driver and heat considerations.
Group 5: Finish, Substrate and Compatibility
Media walls rarely sit alone. Send the finish schedule for the room, not just the panel:
- Veneer, lacquer, laminate or painted surface, with a reference sample or a supplier code where one exists.
- Whether the panel must match wall panelling, concealed doors or cabinetry elsewhere in the same building. Matching grain direction and sheen across trades is a manufacturing decision, not a site one.
- Edge and reveal detailing: shadow gap width, flush or protruding frame, and how the panel meets skirting or a continuous floor line.
- Any wear expectation — a family living room and a hotel lounge suite are specified differently even when the drawing looks identical.
Group 6: Project and Commercial Inputs
For multi-unit or contract work, add:
- Quantity per type and the number of repeating layouts. Repeating one detail across several villas is a different exercise from bespoke panels for a single residence.
- Site address, access constraints, lift dimensions and delivery window. A panel that cannot pass a lift door has to be split, and splitting changes the joint detail.
- Installation responsibility: our team on site, your contractor, or a mixed arrangement with guidance from us.
- Programme dates — drawing approval, production start, ship date and required on-site arrival.
How This Fits Into a Turnkey Package
Media walls are usually ordered alongside other fixed elements: cabinetry, panelling, doors and interior fixtures. As a one-stop furniture and building materials supplier, Santerson handles design coordination, custom manufacturing, logistics and door-to-door delivery, then installation and after-sales support under one programme. That single chain matters here specifically: the same drawing set that defines the TV panel also has to agree with the kitchen, wardrobe and panelling packages, otherwise finishes meet in the middle of a wall with no shared detail.
Our published cooperation steps are project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. The measurement list above belongs to that first stage. It is what turns "a media wall in the living room" into a drawing your site team can build against.
A Short Checklist Before You Send an Enquiry
Send with your first message:
- Wall width and height, measured at multiple points, plus finished floor level.
- Screen size or range, mount type, and equipment list.
- Existing or planned electrical and low-voltage positions.
- Preferred open/closed layout and door mechanism.
- Finish reference and the adjacent finishes it must match.
- Quantity, site address, access notes and required on-site date.
A floor plan or a marked-up photograph of the wall is genuinely useful; a rough hand sketch with real dimensions beats an elegant drawing without them.
Getting a Quotation
With those inputs, we can return a proposal that specifies panel construction, substrate behind the screen recess, storage layout, lighting provisions and finish schedule — and price it as one package rather than an estimate with caveats. Where a detail is still open on site, we flag it in the drawing instead of assuming it, which keeps the change visible and cheap rather than hidden and expensive.
Send your wall dimensions, equipment list and finish references, and we will come back with a buildable specification for the panel — not a catalogue item that happens to look similar.
Tell us the wall. We will tell you what the panel needs.
Santerson manufactures integrated TV panels, media walls and matching interior fixtures for villa, hospitality and office projects worldwide. Contact our project team to start a specification.