A well-drawn enquiry shortens the whole door process. When you send a supplier accurate openings, finish preferences and site conditions at the start, you receive drawings and a quotation that match the building instead of a specification you have to rebuild three times. The checklist below covers what to collect before you write to us about Classic French Double Doors, and what we need in order to price the job properly.

Why preparation changes the outcome

French double doors are made to fit an opening, not picked off a shelf. Leaf size, frame depth, glazing and hardware all follow from measurements and from how the doors will be used each day. Send incomplete information and the first quotation is only an estimate; send complete information and the same quotation can move straight into shop drawings for your sign-off.

This matters most on renovation work, where openings rarely match the original drawings. If a wall has been moved, a floor level raised or a screed poured since the design stage, tell us before measuring — otherwise the frame depth we quote will not suit the finished floor.

Measurements to take first

Take measurements at three points across the width and three down the height of each opening, and record the smallest reading for each dimension. Then note:

  • The finished floor level, or the floor build-up still to come, so the frame sits at the right height.
  • The wall make-up and total thickness, including plasterboard, blockwork, brick or steel framing.
  • Whether the opening is square and plumb, or whether packing and adjustment will be needed on site.
  • Clear swing space: how far the leaves must open, and what furniture, skirting or wall returns are in the way.
  • Head height and lintel condition, especially where the doors run close to full storey height.

Send photographs of each opening from inside and outside, with a tape measure visible in one shot. Two minutes of photography prevents most of the questions that otherwise delay an order.

Decisions about the doors themselves

You do not need to know every detail, but a clear starting point helps us quote the right thing rather than three options. Decide on:

  • Style and glazing pattern. Our French Doors collection covers classic paneled leaves, an arched variant and a slim-frame version for plainer interiors; each is made to measure with material and finish options.
  • Opening direction and which leaf is active. Inward or outward, left-hand or right-hand, and whether both leaves open or one is fixed with a bolt throw.
  • Finish. Painted, stained or veneered surfaces look different under site lighting, so tell us the paint code or send a sample reference rather than describing the colour in words.
  • Glass. Clear, obscured or decorative glass, and any pattern you want matched to existing glazing elsewhere in the building.
  • Hardware. Handles, hinges, locks, closers and threshold detail — including whether your own ironmongery is being supplied.

Site and programme details we need from you

Doors are only one line in a fit-out, so the surrounding trades set the deadline. Include in your enquiry:

  • The room or rooms involved, and how many sets of doors each opening needs.
  • When the openings will be ready to receive frames, and when the doors must be installed.
  • Who is preparing the openings on site — your builder, our team, or nobody yet.
  • Delivery address, access constraints, lift or stair limits, and storage arrangements on arrival.
  • Whether other joinery from the same project — wardrobes, kitchen cabinets, panelling — should be coordinated with the doors so finishes match.

What to send in your first message

ItemFormat we preferWhy it matters
Opening sizesWidth, height and wall thickness per opening, measured at three pointsSets leaf size and frame depth; avoids remaking frames
Floor levelsFinished floor level, or build-up to be installedDetermines threshold and leaf drop
DrawingsPDF plans and elevations, even hand-traced sketchesShows swing paths, adjacent joinery and room layout
PhotographsJPEG from inside and outside each openingReveals wall make-up, condition and access for delivery
Finish referencePaint code, veneer sample or photograph of an existing surfacePrevents colour disputes at handover
QuantitiesSets per opening and per room typeAffects production planning and container loading
ProgrammeSite-ready date and required installation dateFixes the production sequence around your other trades

How our team handles the enquiry

Once we have the information above, your enquiry follows a set path. Our Interior Design Services team reviews the layout and coordinates the door specification with production, supported by furniture layouts and 3D renderings where drawings are needed. Where a project calls for non-standard sizes or bespoke finishes, our Custom & OEM Service covers design, prototyping and material selection before full manufacture.

After you approve the drawings and quotation, we produce the doors, pack them for export and arrange Logistics & Door-to-Door Delivery by sea, air or rail, handling the shipping documents your order requires. On arrival, Installation & After-sales Support covers fitting, inspection of the completed work and spare parts if anything is damaged in transit.

A practical starting point: send your opening measurements, photographs of each opening, the finish reference and your required installation date. That single message is usually enough for us to return drawings and a firm price rather than a list of further questions.

Questions worth asking before you commit

  • Which leaf carries the lock, and does that suit how the doors are used day to day?
  • Is the frame depth adequate once the finished floor is in place?
  • What tolerance is allowed at the opening, and who packs it on site?
  • Which hardware is included in the price, and which arrives loose for your ironmonger?

If you are comparing several door types for the same building, our Windows and Doors range also covers hinged, sliding, pocket and folding options, so openings throughout a project can be specified with one supplier and coordinated finishes.

All doors are made to measure for the project. Confirm dimensions and selected specifications for each order before production begins; material, finish and hardware availability should be verified at quotation stage.