Glass-front shaker cabinets look simple on a drawing: a framed five-piece door, a glazed centre, and a run of wall units to hold display ware. They are unforgiving in practice, because the glass shows every misalignment, every uneven reveal between doors, and every cupboard that was built to a nominal size instead of to the room. A sound installation plan is written before the cabinets leave the factory, and it covers measurement, glazing specification, hardware, services, sequencing and handover. The checklist below follows the way we work on glass front shaker cabinets for villas, apartments and boutique hotel kitchens, where the units arrive by sea and have to be fitted correctly the first time.

Start with verified site dimensions, not architectural averages

Shaker doors are defined by their frame rails and stiles, so small dimensional errors become visible immediately once glass is involved. Take the drawing as a starting point and confirm the built condition on site:

  • Floor-to-ceiling height at several points along each wall, plus floor level variation across the run.
  • Wall plumb and square, corner offsets, and the position of columns, downpipes and ductwork that cabinets must clear.
  • Finished wall build-up, including tiling or stone thickness, so worktop heights and splashback zones are set from the true face.
  • Window sills, radiators and existing appliance locations that constrain a run or dictate where a glazed unit can sit.

Our custom built-in kitchen cabinets are made to the dimensions you confirm rather than to a modular grid, so the survey is the step that decides whether the finished line reads straight. Record the survey in writing and have it signed off before production begins.

Specify the glass and the door construction together

The glazing is not an accessory to the door; it changes how the door must be built, glazed and maintained. Decide these items on the purchase order, not at handover:

  • Glass type and finish — clear, frosted, ribbed or smoked — and whether the panel is tempered where impact or heat is a factor.
  • Glazing method: rebate depth, glazing beads or silicone setting blocks, and whether the glass is bedded on all four edges.
  • Mullion and reveal widths between adjacent glazed doors, so the frame proportions stay consistent across the run.
  • Interior backing behind the glass — shelf colour, back panel material and lighting channel — because the surface seen through the glass is part of the finish.

Where a project mixes materials, put that in the plan early. A typical villa kitchen we supply pairs glazed wall units with solid doors in the same shaker profile, as in this light grey shaker style kitchen that combines glass display cabinets and open niches with raised panel doors and warm LED lighting.

Plan the hardware schedule around glazed doors

A glazed door behaves differently from a solid one: it is heavier per unit area in some constructions, and its frame carries the load rather than a full panel. The hardware schedule should state:

ItemWhat to fix in the plan
HingesType, opening angle, load rating and the number of hinges per glazed door; integrated soft-close where required.
Drawer slidesLoad rating matched to contents, full extension, and clearance behind the door for the slide body.
Handles and knobsFinish (for example brass or black), fixing centres, and whether they fix through the shaker stile or the rail.
Support legs, brackets and connectorsHeight adjustability for uneven floors, wall-hanging rails and bracket spacing for tall glazed units.
LightingFixture type inside the display unit, driver location for service access, and the cable route through the carcass.

We supply matching cabinet hardware — hinges, drawer slide rails, support legs and connecting brackets — with the cabinetry, which keeps load ratings and finishes consistent instead of leaving the site team to source substitutes. Confirm the full schedule for each project before production.

Coordinate services and internal fit-out before the units close up

Glazed units are usually the ones with integrated appliances or display lighting behind them, so their services must be resolved in advance:

  • Power and data points for an integrated wine refrigerator, oven or microwave set into a cabinet run, positioned to the confirmed appliance drawings.
  • Switching and dimming for interior LED strips, with drivers left accessible rather than sealed behind a glazed front.
  • Ventilation and heat clearance for appliances, including the path from the carcass to the room.
  • Internal partitions, shelf spacing and tray heights set to the actual ware the client intends to display.

Set out packaging, delivery sequence and site storage

Glass is the item most often damaged in transit on an international shipment, so the plan should state how glazed doors travel. Our logistics covers sea, air and rail freight forwarding with customs paperwork, packaging and container loading, and door-to-door delivery; on your side, agree:

  • Glazed doors crated separately from carcasses, with edge protection and orientation marking on every crate.
  • Container unload order, so carcasses that must be fitted first arrive or unload first.
  • A dry, level, secure storage area on site, with crates kept closed until the fitting team needs them.
  • A delivery window that does not clash with wet trades still working on the walls the cabinets fix to.

Write the fitting sequence and the snag list into the plan

The order of work matters as much as the components. A practical sequence for a glazed run:

  1. Level and align carcasses on the confirmed floor line, adjusting legs before anything is fixed to the wall.
  2. Join carcasses, fix wall rails and set the run to the planned reveal widths.
  3. Fit worktops and splashbacks, then appliances and services testing.
  4. Hang solid doors first to establish the reference line, then hang glazed doors last so they are not knocked during other work.
  5. Glaze, fit handles and light fittings, then adjust every door for parallel reveals.

Close the job with a written inspection: door alignment, hardware operation, glass condition, lighting function, and any snags with an owner and a date against each item. Our installation and after-sales stage covers on-site fitting, inspection and snagging, spare parts and replacement, and ongoing maintenance.

What to confirm before you place the order

Send with your enquiry: the signed site survey; elevations with unit-by-unit sizes; glass type and glazing method; hardware schedule; appliance models and their drawings; lighting specification; delivery address and access notes; and the sequence in which runs are needed on site. Anything left open at this stage is what later appears as a snag.

SANTERSON has manufactured furniture and building materials since 2008, with custom sizing, panel material and surface finish options for shaker kitchen cabinets supplied to residential and hospitality projects. Send us your drawings and survey data and we will return a specification with the glazed units, hardware and services coordination set out in one plan.

Plan your glazed shaker run with us

Share your kitchen elevations and site survey for a made-to-measure specification covering glass, hardware and installation. Contact SANTERSON to start the specification.