A swim spa on a hotel site is not a single line item on a bill of quantities. It is a wet asset that touches structure, power, water, drainage, plant location, guest programming and housekeeping. The Outdoor Swim Spa WS-PC07A is one of the longer units in our configurable outdoor swim and hydrotherapy range, and it suits hotels that want lap-style swimming plus jet therapy without the footprint and permitting load of a full pool. The notes below follow the order we work through with hotel and resort buyers: site and structure first, then equipment, then operations, then commercial terms.
1. Start with the site condition, not the model number
The catalogue dimensions for this unit are 7000 × 3000 × 1470 mm. Read them as three separate constraints before you commit to a location:
- Plan area. A seven-metre length needs clear access on at least one long side for the plant and control side, plus circulation for guests in wet areas. Decking, screening and lounge furniture have to sit outside that envelope, not inside it.
- Excavation or platform. The 1470 mm depth determines whether the installation is semi-recessed, on a raised deck, or set into a terrace. Each option changes the structural design, waterproofing detail and edge treatment for the surrounding finish.
- Route and crane access. A unit of this size arrives as a shell and equipment package. Confirm the delivery route, lifting point and final setting path early — a spa that cannot reach its designed position turns into a change order across several trades.
For hospitality projects we normally ask the architect or M&E consultant to confirm slab loading, pit waterproofing and drainage levels before the spa is drawn into the general arrangement. That single sequence keeps the swim spa off the critical path.
2. Match the equipment set to how guests will actually use it
The specification shown on our product page for WS-PC07A lists a control system (1 set), 4 water pumps, 1 filter pump, a total of 62 jets, LED lighting and ozone treatment. That combination points to a therapy-led layout: enough jet stations for guests to use the unit as a hydrotherapy stop after the gym or the beach, with filtration running continuously between users.
| Model | WS-PC07A |
| Catalogue dimensions | 7000 × 3000 × 1470 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 62 pcs |
| LED lights | 1 |
| Total power | 9.55 kW |
| Features shown | Water jets, LED lighting, Ozone |
The WS-PC07A-T variant in the same catalogue carries a swim training system, with a different pump and jet arrangement. In hotel terms this is the decision point: if your guests expect counter-current swimming lengths, take the configuration with the swim training system; if the unit is positioned as wellness and recovery alongside a spa pool or gym, the jet-led set does the job at a lower equipment count.
Total power, pump counts and jet counts above are transcribed from our product page for this model. Options change them, so we reissue the technical sheet against the configuration you select — do not let a consultant size electrical and plant work from a catalogue screenshot.
3. Confirm the utility and plant scope in writing
Hotels usually have an M&E package already tendered, so the swim spa has to be specified into it rather than bolted on afterwards. The items we need closed out with your consultant are:
- Power. Dedicated supply and protection for the pumps, control system and lighting, sized from the confirmed configuration sheet, plus space and ventilation for any heat pump you add.
- Water and drainage. Fill, top-up, overflow and full drain routes, with an accessible floor drain or sump for servicing.
- Treatment regime. Ozone is listed as a feature on this model; UV sterilisation appears in our optional accessory list. Decide which one the operator will run and who supplies consumables.
- Filtration and insulation. Sand filtration, extra pumps, insulation and steps are all catalogued options. Insulation and heat pump choices matter most where the unit runs through a cool season or overnight.
- Control access. Where the controller sits, who sets operating schedules, and how housekeeping or engineering staff override them.
4. Plan for daily operation, not just handover
A hotel swim spa is used in short, unpredictable bursts, so the operating model should be simple enough for a duty engineer to run without vendor support. Two things decide whether it stays that way:
- Service reach. Jet nozzles, pumps, filters and the control system all need physical access without removing finishes. Build access panels and plant-room clearances into the detail design.
- Consumables and spares. Agree the wear items — filtration media, seals, lighting, dosing consumables — at quotation stage, and keep a spares list on site so a failed pump does not close the facility for weeks.
Guest-facing details also carry weight in reviews: water temperature stability, jet noise at evening hours, step geometry for older guests, and lighting that reads as ambience rather than glare from the guest-room windows.
5. Where it fits alongside the rest of the outdoor package
On most hospitality sites we supply the swim spa as part of a wider outdoor and wellness scope, which is where a single supplier starts to pay for itself in coordination rather than in unit price. Longer configurations such as our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool and the jet-heavy Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features sit in the same category, so an operator can standardise control, filtration and servicing across several units on one property.
The deck around the spa then draws on the rest of our range — aluminium outdoor sofa sets for poolside lounging and building and construction materials for the wall, ceiling and finish packages that surround the wet area. As a hotel furniture and fit-out supplier, we run that combined scope through one design, production and delivery workflow: consultation, design and planning, production, logistics, installation and after-sales, with door-to-door freight arranged by our team.
6. What to send us for an accurate quotation
To move from interest to a priced, buildable package, send:
- Location drawings or photographs of the intended siting, with level information.
- Your preferred configuration — jet-led therapy use or swim-training use — and any options you want (heat pump, UV sterilisation, sand filtration, insulation, steps).
- Available electrical supply and where the plant is allowed to sit.
- Opening date and site access windows, so production and freight can be sequenced around your programme.
Can WS-PC07A be installed indoors?
The unit is catalogued as an outdoor swim spa. An indoor installation is a different set of conditions — humidity control, ventilation, structural loading and drainage — so send us the internal location and we will confirm the configuration and the surrounding build scope before you design around it.
Is the specification on this page final?
No. It is what our product page shows for this model. Optional accessories change pump counts, treatment and power figures, which is why we issue a configuration-specific technical sheet for every hotel order.