A swim spa only works if the site around it is prepared before the shell arrives. The Outdoor Swim Spa WS-PC05CH sits in our configurable outdoor swim and hydrotherapy range, so its installation plan has to be built around this model's own dimensions and equipment list rather than a generic spa checklist. The sections below set out what we ask project owners, contractors and designers to settle before production starts.
1. Confirm the shell size and the access route
The catalog lists this model at 5000 × 3000 × 900 mm. Treat those numbers as the delivery envelope, not the finished site dimension: add working clearance for levelling, insulation, steps and for the technician to reach the equipment side. Write into the plan who moves the shell from the truck to the final position, which crane or forklift capacity is needed, and whether gates, fences or landscaped beds have to come down and be rebuilt.
- Route width and turning space from the kerb to the slab, checked on site, not from a drawing.
- Overhead obstruction — power lines, pergola beams, tree branches — along that route.
- Finished floor levels at the spa and along the access path, so the shell is not landed on ground that will later be built up.
2. Fix the foundation and drainage detail
The plan must state who pours the supporting slab or pad, to what level, and when it will be cured and handed over. The bearing support detail follows the drawing we issue with the order confirmation, so ask for that drawing early and let your contractor price from it. Water management belongs in the same section: where spillage, backwash and rain run off, how the plant area stays dry, and what finish wraps the base edge.
- Slab level tolerance and the date the slab is available for installation.
- Drainaway point or French drain for surface water around the shell.
- Clear space left for the filter pump, water pump and control system to be reached for service.
3. Set the power supply and electrical scope
Total power for this configuration is listed at 2.45 kW. The installation plan should record the supply voltage and phase available on site, the position of the isolator and protective device, and which party supplies and connects them. Local electrical rules are enforced by whoever signs off the installation in your country — we confirm the equipment requirement, your electrician confirms the installation method.
- Cable size and route from the consumer unit to the spa, agreed with the electrician before trenching or paving.
- Location of the isolator within reach of the control system and outside the splash zone.
- Bonding and earthing details, drawn by the local electrical contractor.
4. List the included equipment and the options you want
The specification sheet for this model shows one control system, one water pump, one filter pump, thirty jets and one LED light, with water jets, LED lighting and ozone among the features shown. A swim training system is not listed for this configuration; if your programme needs counter-current swimming, we look at a different model in the range instead of forcing it onto this shell. Catalog-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — availability varies by model, so the option list is confirmed line by line before order.
| Item | Catalog entry for WS-PC05CH | What the plan must add |
|---|---|---|
| Shell size | 5000 × 3000 × 900 mm | Site clearance, access route, crane method |
| Total power | 2.45 kW | Supply voltage/phase, isolator, cable route |
| Jets | 30 pcs | Seating and therapy positions agreed with the end user |
| Pumps | Water pump 1 pc, filter pump 1 pc | Service access to both units |
| Lighting | LED lights 1 pc | Switch position and any extra circuits |
| Options | Heat pump, insulation, UV, sand filtration, steps available as catalog options | Which options are in the order, and their site requirements |
5. Plan for heating, insulation and running cost
Decide early whether a heat pump is part of the order, because it changes both the electrical load and where plant equipment can sit. Where the climate runs cool or exposed, insulation and an insulated cover are specified at the same time as the shell rather than added later. The plan should say who sets the target water temperature and who controls the schedule, since that drives the running cost more than any single component.
6. Coordinate the surrounding landscape and handover
Paving, decking, planting and lighting around the spa usually sit with other trades. The installation plan works when it names each trade, the sequence, and the date each one must clear the area. Include the water-fill source, the commissioning walkthrough with the end user, and the spare-parts and maintenance pack handed over at completion. As part of our installation and after-sales support, we agree these responsibilities in writing before shipment so nothing waits on site.
7. Record the commercial and logistics terms
- Delivery term and delivery address, plus who books the crane for the arrival day.
- Packaging and container loading arranged with our logistics and door-to-door delivery team.
- The inspection point on arrival, and how any transit damage is documented.
- Written sign-off of the equipment list, dimensions and electrical requirement before production.
Before you order: a short checklist
- Site dimensioned against 5000 × 3000 × 900 mm plus working clearance.
- Access route and lifting method agreed with the contractor.
- Slab detail, level and handover date confirmed.
- Electrical supply, isolator position and local sign-off party named.
- Option list — heat pump, insulation, UV, sand filtration, steps — confirmed line by line.
- Landscape sequence, commissioning walkthrough and handover pack scheduled.
Send us the site drawing and your intended use, and our team returns a configuration proposal with the equipment list, dimensioned drawings and the electrical requirement for the exact specification — part of the one-stop solution we provide for villa, resort and hospitality projects.