A metal frame open wardrobe sits in an awkward place on most schedules. It is not a loose furniture item that can be swapped out late, and it is not a closed carcass where doors hide every measurement error. The frame carries the unit, the structure stays visible, and the storage layout has to work exactly as drawn because there is nothing covering it up. That combination is what makes it easy for a vague brief to turn into change orders. Below is the practical set of decisions to settle before you send an enquiry, so the quotation you get back is the one you can actually build on.

Why This Type of Wardrobe Punishes Thin Specifications

Closed wardrobes forgive a lot. If a shelf sits 40 mm off, the door closes and nobody sees it. With an open wardrobe supported by a metal frame, three things are exposed at once: the frame profile itself, the storage layout behind it, and the way the unit meets the wall, floor and ceiling. A factory can only price what you have defined.

The second issue is coordination. Metal frame open wardrobes usually sit inside a wider joinery and finishes package — wall panelling, flooring, skirting, lighting in the dressing area, sometimes a niche or recess the unit has to land in. Each of those interfaces needs a decision from someone before production starts. If your brief hands the wardrobe to one supplier and the wall finish to another with no note about who resolves the junction, that argument happens on site, at your cost.

The third issue is scale. Most project enquiries are not one bedroom unit; they are a floor of villas or a run of guest rooms, each with slightly different room widths and ceiling heights. A brief that describes a single reference detail does not tell a manufacturer how many variations exist, which ones repeat, and where the tolerance bands sit.

The Frame: What to Specify Before Asking for a Price

"Metal frame" is not a specification. Two enquiries using that exact phrase can produce completely different products at completely different prices. Settle these points in writing:

  • Framing material and grade. State whether you want aluminium or steel framing, and the surface treatment — powder coat colour code, anodised finish, or wood-effect transfer. If a colour match to existing joinery matters, supply the reference code rather than a photograph.
  • Profile size and edge detail. Frame width and depth drive both appearance and cost. A slim sightline reads as a design feature but constrains what can be fixed to it; a deeper profile is more forgiving when you need brackets, hanging rails or lighting channels concealed.
  • Structural responsibility. Say explicitly whether the frame is load-bearing for the whole unit — shelves, rails, top panels — or whether it acts as a trim around a panel-built carcass. These are different engineering conversations and different price bases.
  • Fixing method and substrate. A wall-mounted open wardrobe needs to know what it is fixing into: timber studs, steel studs, masonry, or a service wall that cannot be drilled. Floor-anchored and ceiling-braced variants behave differently under load and in tall rooms. If the substrate is not yet known, say so and ask for the fixing detail to be confirmed after site survey rather than assumed now.
  • Finish durability expectations. In a dressing room or shared corridor the frame gets knocked by bags, cases and shoulders. Ask what edge protection exists at the base and corners, and how a damaged section is replaced later.

A short rule: if your brief contains the words "metal frame" without a profile dimension, a finish code and a fixing method, it is not yet a specification. It is an invitation for three suppliers to quote three different things.

Layout and Storage: Describe How the Wardrobe Is Used, Not Just How It Looks

Open wardrobes are usually chosen because someone wants the storage reachable and visible — a boutique-style dressing area, a villa bedroom where the joinery reads as part of the room, or a compact suite where a full door run would eat circulation space. That intent should be written into the brief, because it changes what the layout needs to contain.

For each unit type in the project, record:

  • Hanging zones and their heights — short hang, long hang, and whether double hang is required. Give the occupant profile: guest rooms, long-stay residences, staff accommodation.
  • Shelf spans and loading. Long unsupported shelf spans sag under folded denim and towels. Ask for the maximum clear span at your chosen panel thickness, and where intermediate supports or a thicker panel are needed.
  • Drawers, trays and open cubbies — quantities, front detail, and whether soft-close hardware is required.
  • Lighting. Recessed or surface-mounted lighting inside an open unit needs cable routes decided before the frame is fabricated, not after installation.
  • Display versus storage balance. If part of the run is intended to show clothing or accessories, say so; it changes shelf depth, backing panel choice and lighting.

Our Metal Frame Open Wardrobes are made to measure with material, finish and layout options set per project, so the level of detail in your brief directly determines how close the first quotation lands to the final one. Where a project needs the same storage logic expressed in a different visual language, the wider Open Wardrobes collection covers Wall Mounted Open Wardrobes, Freestanding Open Wardrobes and Minimalist Open Wardrobes, which is useful when one project mixes a feature dressing area with straightforward bedroom storage.

Dimensions, Tolerances and the Site Survey

This is where most wardrobe projects lose time. Specify:

Item to stateWhy it belongs in the brief
Finished floor level and where it is confirmedOverall unit height is measured from finished floor. If screed or flooring is not yet decided, the whole elevation is provisional.
Room width at three heights, plus out-of-plumb notesOlder villas and renovated shells rarely give square, plumb walls. A made-to-measure unit only fits if someone has measured what exists.
Ceiling condition and any cornice, bulkhead or recessDecides whether the unit stops below the ceiling, fills to it, or lands inside a niche — three different details.
Skirting and architrave treatment at the junctionWhether the frame scribes around existing skirting or the skirting is removed and replaced changes both trades and cost.
Adjacent services: switches, sockets, AC grilles, sprinklersAn open unit cannot hide these. Positions need to be on the drawing before fabrication.
Who carries the site survey, and when it happensState whether you are supplying verified dimensions or commissioning a survey. Ask for final dimensions to be confirmed after wet trades are complete.

If your programme does not allow a survey before order, say so plainly in the brief and ask for a two-stage approach: fabrication release after survey, with an earlier long-lead window agreed separately. That is a normal request, and it protects you from paying twice.

Finishes, Backing Panels and Visual Consistency Across a Project

Open wardrobes are read as furniture, so finish consistency across rooms matters more than in closed joinery. In your brief, group units by finish family and state which spaces must match — bedroom run, dressing area, corridor storage, vanity wall. Then specify:

  • Panel substrate and surface: melamine, lacquer, veneer, or a wood-effect laminate, with the reference from the supplier's own sample range rather than a competitor's code.
  • Backing panel choice: matched panel, contrasting panel, or open back to wall. An open back exposes the wall finish quality behind the unit, so it commits you to a better painting or panelling standard.
  • Grain direction and edge banding detail — visible on open units, invisible behind doors.
  • How samples are approved: physical sample first, signed off against a numbered reference, before production release. Agree who holds the approved sample.

Where the project needs wardrobe finishes to match other cabinetry in the same building — kitchen cabinets, vanities, wall panelling — say so in the brief and ask for one supplier to carry the joinery package. Matching across separate suppliers is possible but it costs samples, time and patience.

How to Write the Enquiry So Quotations Are Comparable

A procurement brief for this product line works best as a short pack. Include:

  1. A one-line project description: building type, number of units, country, and target installation window.
  2. A schedule of unit types with reference codes, quantities, and the room each belongs to.
  3. Elevations or at minimum clear dimensions per unit type, marked provisional or verified.
  4. Frame specification: material, profile size, finish code, fixing method.
  5. Storage layout per unit type: hanging, shelving, drawers, lighting.
  6. Finish schedule with the matching requirement across spaces.
  7. Explicitly listed exclusions and assumptions — site survey, removal of existing joinery, making good wall finishes, on-site installation.
  8. Delivery terms you want quoted: destination port or door-to-door, packaging standard, container loading plan.

Send the same pack to every supplier. The point is not to collect the lowest number; it is to make sure the numbers mean the same thing. If two quotations differ sharply on an open wardrobe, the gap is almost always in framing profile, panel thickness, hardware grade or who carries installation.

Working With a Single Supplier for Joinery and Finishes

For multi-unit projects, one of the biggest reductions in coordination risk comes from putting wardrobes, related cabinetry and the finishes they meet into one procurement package. That is how we work as a one-stop furniture and building materials supplier: the wardrobe carcass, the framing, the wall panels behind it, the flooring it lands on and the lighting inside it come from one production and shipping plan rather than four separate ones.

Where a project has its own design language or an in-house brand standard, custom and OEM work is the usual route — bespoke dimensions, chosen finishes, prototyping before the main release. Our OEM Furniture Manufacturing service covers that kind of specification-led production, which suits developers and contractors who already have drawings and need a factory to build to them.

Freight and installation belong in the brief too. We arrange Furniture Logistics and Door-to-door Delivery, including packaging and container loading, and we provide Furniture Installation and After-sales Support with inspection and snagging on site. For a project buying open wardrobes in quantity, ask specifically how the units travel — whether frames arrive assembled or flat, how glass or panel sections are protected, and what spare sections can be reordered later without a minimum batch.

Questions Worth Asking Before You Award

  • Which part of the unit is structural, and what is the maximum shelf span at your quoted panel thickness?
  • What fixing detail do you propose for our wall construction, and who confirms it after survey?
  • Can you supply a physical finish sample set before we sign off colours and grain?
  • What happens to an order if the site survey returns dimensions different from the drawings?
  • Which hardware brand and model are quoted, and can the same items be sourced for replacements in two years?
  • What is included in installation, and what making good of wall and floor finishes sits outside your scope?

Brief checklist before you send

  • Frame material, profile size, finish code, fixing method — all stated.
  • Storage layout per unit type, including lighting and cable routes.
  • Dimensions marked provisional or verified; survey responsibility named.
  • Finish schedule with cross-room matching requirement.
  • Exclusions listed: survey, removals, making good, installation scope.
  • Delivery terms and packaging standard requested in the quotation.

Send us your wardrobe schedule

If you have a unit list, elevations or even just room dimensions, send them across with your target installation window and we will quote against the actual specification rather than a generic product line. Include any finish references from other joinery in the building so matching can be checked before production.