Built-in Furniture · Pre-production Approval

A wardrobe door that looks right on a rendering can behave very differently in a finished bedroom. Glass reflects, lacquer shifts tone with the light, and the two side by side exaggerate every mismatch. If your project specifies Glass & Lacquer Combination Wardrobes, the sample stage is where you protect the design intent, the budget and the programme. The checklist below follows how our Custom Furniture Manufacturer service actually runs: you approve physical finishes before panel quantities are cut, and each approval is documented so the production run matches what you signed off.

Why This Combination Is Harder to Approve Than a Single-Finish Door

Our Glass & Lacquer Combination Wardrobes sit within the Lacquer Wardrobes collection and are made to measure, with material, finish and layout specified per project. That flexibility is the point of the product, and it is also why the sample has to be reviewed carefully. Two materials behave differently under the same conditions:

  • Lacquer is a layered surface. Sheen level, colour depth and edge wrap are produced through coating and polishing passes, so a flat swatch cannot show you how light travels across a full door or around a profiled edge.
  • Glass changes with what is behind it and what is in front of it. Clear, frosted, ribbed, bronze and smoked glasses all read differently depending on the carcass colour inside the wardrobe, the wall behind the unit and the lighting scheme you have specified.
  • The meeting point is where projects get rejected. Frame thickness, the reveal between glass and lacquered panel, and whether metal or wood-tone trim separates them are all decisions that only become obvious at full scale.
Approve the sample as a system — glass, lacquer, frame and hardware together — never as four separate items on a desk.

What to Ask Us to Send Before You Sign Anything Off

For our made-to-measure built-in furniture we work from your drawings and site dimensions, so the sample request should mirror what will actually be built. Ask for these items as one set:

Sample itemWhat it proves
Lacquer door panel, full height with edge detailColour at real scale, sheen level across a curved or flat surface, how the coating wraps edges and corners
Glass sample in the specified type and thickness, mounted on the approved carcass boardTint and transparency against the interior colour, plus how reflections read at door size
Frame or trim section showing the glass-to-panel junctionShadow gap, frame width, finish on the metal or wood-tone profile
Hardware set: hinges, slides, handles or integrated pullsOperation feel, fixing method, colour match against both surfaces
Interior carcass and shelf finish sampleThe backdrop you will see through the glass every day

If a full-height door is not practical for your review window, ask us to make the lacquer panel as tall as the courier allows and to mount the glass at door scale rather than as a loose offcut. A 50 mm chip tells you the colour; it does not tell you whether the sheen looks cheap under downlights.

How to Review Each Finish Sample in Real Conditions

1. Review the lacquer under three light sources

Move the panel between daylight, warm LED and cool LED before you decide. Lacquer colour and depth shift with colour temperature, and high-gloss surfaces also pick up every fingerprint and swirl in the room. Check the surface at an angle, standing level with it and looking down on it, because orange-peel texture and dust nibs only appear obliquely. Matte and neutral-tone lacquer panels in the same collection are meant to sit quietly against walls, so compare the sample against your actual paint or wall panel finish rather than a colour card.

2. Check glass tint against the carcass, not against air

Hold each glass sample up to the approved interior board and look at it from the viewing distance of the room. Tinted and smoked glasses darken the interior; frosted and ribbed glasses obscure contents but also mute the interior colour. If your layout mixes glazed doors with solid lacquered doors across one wall, lay both samples side by side and stand back — a colour that looked warm alone can look yellow next to a cooler neighbour.

3. Inspect the junction at arm's length

Look at the frame section from 500 mm away, the distance a guest or resident will actually stand. Judge whether the reveal is crisp or clumsy, whether the frame finish contrasts deliberately or by accident, and whether the glass sits proud of or flush with the panel. This is the detail that decides whether the wall reads as designed joinery or as loose furniture.

4. Operate the hardware for a full cycle

Open and close the sample door or drawer several times. Sliding configurations need to run without knocking; hinged doors need consistent closing force. Note any catch, vibration or misalignment now, while changing a specification costs nothing.

Documenting the Approval So Production Matches the Sample

Verbal agreement is where rework begins. Before we release your wardrobe panels to the line, record the following in writing and keep both parties on one copy:

  • Sample reference or batch number for every finish, plus the physical sample retained by each side
  • Sheen level stated as a range rather than a single figure, since coating application varies slightly between runs
  • Glass type, thickness and any surface treatment named exactly as it appears on the drawing
  • Frame profile finish and the agreed shadow-gap dimension
  • Hardware type and fixing method recorded for each door configuration
  • The room or elevation each approved set applies to, in case one project uses more than one combination
  • Any tolerance you have accepted, such as a visible grain or coating variation, written down rather than remembered
Scope note. Our wardrobe product pages list made-to-measure sizing, material and finish options and project-tailored layouts; dimensions and selected specifications are confirmed per project. Any figure on a drawing is the agreed figure — do not carry numbers across from a showroom display or another building.

Where Samples Fit in Our Project Workflow

Wardrobes rarely stand alone. In villa and apartment fit-outs we supply them alongside Custom Built-in Kitchen Cabinets, wall panelling, doors and other joinery from the same workshop, which means one sample round can cover several trades. Our cooperation steps run project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up — with material selection and specification sitting inside that middle stage. Full-house projects such as our Arched Niche & Full House Custom Wall Cabinet Project show what a single approved finish set can carry across bedrooms, vanities and display niches.

Practically, plan one sample round for the base specification and allow time for a second only if a colour or glass type needs revising. Send your drawings with room elevations rather than a single wardrobe detail: we can then group samples so that everything visible on one wall arrives together, and you review the composition instead of five unrelated tiles.

Five Reasons Projects Delay Their Own Sign-Off

  • Samples reviewed under warehouse lighting only. Decide in the room's light or bring a lamp that matches your specified fitting.
  • Glass approved without the carcass behind it. The interior board is part of the colour you are approving.
  • Sheen agreed verbally. "Semi-gloss" means different things to different workshops; state the range.
  • No retained sample. Without a signed physical reference, a production query has nothing to be resolved against.
  • Hardware left to last. Handle colour and door thickness interact with the finish you have just approved.

Before You Book the Sample Round: A Short Pre-Checklist

  • Elevations and dimensions issued, including floor-to-ceiling heights and any skirting or cornice conflict
  • Lighting schedule available so samples can be reviewed under the specified colour temperature
  • Interior carcass colour chosen before glass is assessed
  • Door operation decided — sliding, hinged or open — since it affects frame section and hardware
  • Named decision-maker with authority to sign off, so approvals do not stall between consultant and client

If you would like finish samples prepared for a wardrobe, kitchen or full joinery package, send us your drawings and finish shortlist and we will assemble the set as one submission.

Talk to SANTERSON about your wardrobe specification

Contact: PHILLIP · Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com

China: 1st Floor, 2nd Building, District 1, Wanyang Zhongchuang Zone Phase II, No.8, 2nd Road West District, Baochong Industrial Zone, Longjiang, Shunde, Foshan 528318, China

Enquiry page: https://www.santerson.com/contact/