A cherry solid wood wardrobe is a long-term purchase. The questions you put to the supplier before the order is placed decide whether a problem on site becomes a fix or a dispute.

Most buyers spend their attention on the timber, the door style and the price per lineal metre. Far fewer read what happens after the container arrives. That is where custom joinery goes wrong: an out-of-square opening, a hinge that binds after one season, a panel that needs replacing and cannot be matched to the original specification.

Our Cherry Solid Wood Wardrobes are made-to-measure for residential projects, with the finish, layout and dimensions specified per space. Because every set is built to a particular drawing, the after-sales conversation has to be just as specific. Below is the list we suggest you take into your own supplier negotiations, together with the answers we give.

1. What exactly does the warranty cover on a made-to-measure wardrobe?

"Lifetime warranty" and "workmanship guarantee" mean nothing until they are broken into parts. Ask which components are covered, for how long, and what is excluded.

  • Carcass and structural joints — the frame, the back panel fixing, the drawer boxes.
  • Doors, panels and finish — warping, joint opening, coating failure, colour change.
  • Hinges, slides, handles and lift-up fittings — usually treated as hardware with a separate term.
  • Anything caused by site conditions: damp walls, an unlevel floor, a heating or cooling vent blowing directly into the carcass.

Solid timber moves with humidity. A supplier who has thought about this will tell you plainly which movement is normal and where the limit sits. If nobody can answer that question in writing, treat it as a warning sign before you sign anything.

2. Who inspects on site, and who is liable if installation goes wrong?

A wardrobe delivered flat-packed to another country is only as good as the crew that assembles it. Establish this before order confirmation:

  • Does the supplier send installers, supervise your trades, or provide assembly drawings only?
  • If your local fitter assembles the units, does that void any part of the warranty?
  • Is there a snag list signed off at handover, and what is the deadline to report items on it?

Our own service scope runs from design and production through door-to-door delivery, with installation support and after-sales service included in the package. For projects overseas we coordinate on-site guidance and inspection at handover, so defects are recorded while the units are still in front of both parties rather than months later.

3. Can replacement parts be ordered years later, and will they match?

This is the single most important question for custom joinery, and the one suppliers most often dodge. A drawer front cut to a drawing three years ago can only be replaced if that drawing still exists and the same material is still available.

Ask for written confirmation of three things: the production drawings are archived under your project reference; the timber species, panel construction and finish code are recorded; and a spare-parts order is possible after the warranty period ends, even at cost.

For our cherry wardrobes, the specification sheet records the selected finish and layout for each project. When a client later needs an extra drawer box, a replacement shelf or a matching panel to extend the run into an adjacent room, we work from the archived drawing rather than asking them to guess at dimensions.

4. How fast is a response, and in whose time zone?

A warranty claim that takes six weeks to acknowledge is expensive even when it is eventually honoured. Ask for the contact route — named person, email, phone or messaging app — and the expected first-response window.

Our enquiries desk answers within 24 hours during working days, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), with PHILLIP as the named contact for project enquiries. Tell us your time zone at the start of a project and we schedule the follow-up around it, because a snag reported on a Friday afternoon in Sydney is not the same as one reported on a Friday afternoon in Foshan.

5. Who pays for freight on a replacement part?

This clause settles more arguments than any other. A small hinge set or a replacement panel can cost more to ship as a single parcel than the part itself. Agree in advance:

  • Whether replacements ship free when the fault is the supplier's;
  • Whether small parts are consolidated into a future container instead of being sent alone;
  • Who handles customs paperwork for the replacement, and who pays duty.

For multi-unit residential work we suggest keeping a spares set — spare hinges, slides, keys, one door panel — in the same container as the main order. The freight on that box is trivial compared with arranging a single replacement across an ocean later.

6. What maintenance does cherry need, and who tells you?

Ask for written care instructions before shipment, not after a problem appears: which cleaning agents are safe on the finish, how often to check hinge adjustment, what to do if a drawer runs stiff in humid weather, and what to avoid — direct sunlight on a long door run, or a wall-mounted heater against the carcass.

A supplier who hands over a care sheet with the drawings expects the furniture to still look right in year five. One who does not is optimising for the sale, not the building.

How these answers look on our side

QuestionWhat we do
Warranty scopeCoverage for workmanship plus spare parts and replacement support; the exact term and exclusions are confirmed in writing per project before production.
InstallationOn-site installation and inspection with a snag list at handover, coordinated with your local trades where we are not on site.
ReplacementsSpare parts and replacement panels produced from the archived project drawing and recorded finish specification.
Response timeNamed contact, enquiries answered within 24 hours on working days (GMT+8 office hours).
Freight on sparesConsolidated into scheduled shipments where timing allows; freight responsibility agreed per project.
MaintenanceCare and adjustment guidance issued with the project documentation.

Before you order: a short checklist

  • Get the warranty term, scope and exclusions in writing — not in a brochure sentence.
  • Confirm who installs, and what your own trades doing the work changes.
  • Ask how long production drawings and finish codes are archived.
  • Agree the spare-parts route and who pays freight and duty.
  • Set one named contact and a first-response window in your time zone.
  • Request written care instructions for the specific finish you chose.

The same discipline applies across a whole fit-out. Wardrobes, built-in furniture, vanities and kitchen cabinetry all fail at the same point: an undocumented specification that nobody can act on two years later. That is why we treat after-sales as part of the manufacturing scope rather than a separate favour, alongside our custom and OEM service and door-to-door delivery.

Send us your wardrobe drawings

Share the room dimensions, the door style you want and the destination city. We will confirm the specification, the warranty scope and the after-sales route for that project before you commit to an order.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com