An open walk in wardrobe quote can look complete at first glance and still leave the parts that drive cost out of sight. Panels, finishes and a total price appear on the page, while the carcass build, internal fittings, tolerance handling and what is actually included in the delivered price are left to be discovered later. If you are sourcing fitted joinery from an overseas manufacturer for a villa or apartment project, the quote is where most of the risk sits. This guide walks through the lines worth checking before you approve one.

Why Open Walk in Wardrobes Are Quoted Differently

A walk-in wardrobe without doors or front frames removes the element most joinery quotes are built around. There is no door leaf, hinge set, sliding track or mirror panel to price. What remains is structure and internals: side panels, shelves, hanging areas, drawers, back panels, edge treatment and lighting.

That shift matters when you compare suppliers. Two quotes for the same room can differ by a wide margin because one includes drawer banks, soft-close hardware, integrated lighting and a finished return on the exposed side panel, while the other prices an open box with bare edges and adds those items as variations. The Open Walk in Wardrobes range we manufacture is specified per project on layout, dimensions and finish, so the quotation reflects what your drawings actually call for rather than a fixed catalogue configuration.

Check 1: What the Price Covers, Line by Line

Ask for an itemised quotation instead of a single room price. A usable quote states each module separately with its dimensions, so you can see what you are paying for and remove or change one element without re-pricing the whole room.

  • Panels and carcass: material, thickness and edge banding or lamination on every visible face.
  • Back panels: thickness and how they are fixed. A thin back panel in a reachable open bay is a weak point.
  • Shelves: span lengths, thickness and whether supports are adjustable or fixed.
  • Hanging: rail type, single or double hang, drop heights and load rating for heavy outerwear.
  • Drawers and pull-outs: box construction, runner brand and grade, soft-close inclusion.
  • Hardware: which items carry a hardware line and which are bundled into the module price.
  • Lighting: fitting type, driver location, wiring route and who supplies the electrical connection point.
A quote that lists "wardrobe, 3.6 m" with one price is not comparable to a quote that lists eight modules with dimensions. Request the breakdown before you start comparing suppliers.

Check 2: Finish and Material Specification in Writing

Colour names are not specifications. "Oak" or "matte grey" means nothing across factories. The quote should state the substrate, the surface material, the finish system and a reference code for the exact decorative.

ElementWhat the quote should state
SubstrateBoard type and grade used for panels, shelves and drawer boxes
SurfaceLaminate, melamine, lacquer, veneer or acrylic, with the decorative reference
EdgesMatching edge banding thickness and material on all visible edges
Veneer workCut pattern, grain direction, and whether a sample board is approved before production
Exposed returnsWhich faces are finished both sides, since open wardrobes show panel edges from the room

For open layouts this last line is where problems appear. A closed wardrobe hides its carcass edges behind doors; an open one does not. Confirm in writing which faces receive a finished surface, and ask for a physical sample board of the panel and edge combination before production starts.

Check 3: How Site Dimensions Are Verified

Made-to-measure joinery only works if the measured dimensions are reliable. Check what the quote assumes about verification:

  • Who takes the site dimensions, and at what stage of the build — after flooring, wall finishes and ceiling heights are final.
  • Whether out-of-plumb walls and floor level variation are measured and allowed for in the design.
  • How the manufacturer handles discrepancies found on site: packing pieces, scribed panels or a site visit.
  • Which drawings are signed off before production, and what happens if a drawing changes after that point.

If you are supplying your own drawings, ask the factory to review them and confirm feasibility in writing. A manufacturer who flags a conflict between a shelf height and a hanging drop at quotation stage saves a rework order later.

Check 4: What Is Excluded

The exclusions clause usually decides the real total. Common items left out of an open walk-in wardrobe quote:

  • Electrical first fix, isolators and the connection point for integrated lighting.
  • Screws, anchors and packers for fixing to the wall or floor, especially on uneven substrates.
  • Protection of finished floors during installation, and removal of packaging waste.
  • Skirting removal or cutting, ceiling trim work and making good around the unit.
  • Second-fix painting or touch-up on adjacent surfaces.

Ask each supplier to state exclusions explicitly. Where an item is not covered locally, price it with your builder at the same time so the comparison stays honest.

Check 5: Packaging, Freight and Delivery Terms

Panel-based joinery travels well when it is packed properly. The quotation should describe how panels are protected — edge protection, corner guards, panel thickness in the carton wall — and how components are labelled so installers can identify each piece on site.

Then check the delivery terms: which Incoterm applies, whether customs clearance and duties are included, where the goods are delivered to, and who handles damaged or missing panels. For projects in Australia, our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail with customs paperwork and shipment tracking; the specific Incoterm, transit window and landed cost are confirmed per project rather than assumed.

Check 6: Installation Responsibility and Sequence

Open wardrobes show every joint, so installation quality is visible from across the room. Clarify in the quote who installs, and when:

  • Whether the manufacturer's team installs on site, sends a supervisor, or supplies assembly drawings for your contractor.
  • The sequence relative to flooring, painting and electrical work, since built-in joinery normally goes in after wet trades are complete.
  • How alignment and packing are handled against walls that are not perfectly straight.
  • What snag and rectification process applies after installation, and what the warranty covers.

Our installation and after-sales support covers on-site fitting, inspection and rectification, with spare parts and maintenance handled as follow-up. Warranty terms, response times and exclusions are set out per project before the order is confirmed.

Check 7: Lead Time Against Your Programme

A quoted lead time means little unless it states its starting point. Ask whether the clock starts at purchase order, at drawing sign-off, or at sample approval — in made-to-measure work the difference is often several weeks. Then check how production milestones are reported and what happens if a finish sample needs revising.

Work backwards from your site programme: allow time for shop drawings, sample approval, production, freight and customs, then install. If your programme cannot absorb that sequence, discuss it at quotation stage rather than after the order.

A Short Comparison Method

When you have two or three quotes, compare them in a single sheet with these rows: room dimensions used; module list with sizes; substrate and surface specification; edge treatment on exposed faces; drawer and runner specification; lighting scope; exclusions; delivery terms and destination; installation responsibility; lead time trigger point. Quotes that look close on price often separate once the exclusions row is filled in.

How a Manufacturer's Input Changes the Quote

The most useful quotes come from suppliers who read your drawings and push back. As a China-based manufacturer of built-in furniture working on villa, apartment and hospitality projects, we quote fitted wardrobes against project drawings, with made-to-measure sizing, layout tailored to the space and material and finish options specified per project. Where a dimension, a shelf span or an exposed edge needs a decision, that comes out at quotation stage rather than in production.

If you are comparing suppliers for open walk in wardrobes, send the room drawings and a target completion date, and ask each supplier to price the same module list. The comparison becomes straightforward once everyone is quoting the same scope.

Send us your wardrobe drawings, room dimensions and finish preference, and we will return an itemised quotation with materials, hardware, packaging, delivery terms and lead time set out line by line.