A wardrobe that pairs a lacquered carcass with glass door panels looks simple on a rendering. It is one of the harder items to buy well, because two different production processes — sprayed lacquer and glass fabrication — have to meet at a reveal, a hinge line or a sliding track. If you are specifying these units for villas, apartments or hotel guest rooms and want them built to your dimensions rather than picked from a catalogue, here is how OEM sourcing actually runs, stage by stage, and what you need to hand over at each one.
What "OEM" changes in a wardrobe order
Two buying routes are usually mixed up. The first is catalogue purchasing: you choose an existing model in a standard width and accept the finish options the factory already runs. The second is OEM and custom manufacturing, where the unit is built around your drawings. Under our Custom Furniture Manufacturer service, that route covers bespoke design and prototyping, choice of panel materials and surface finishes, OEM production for another brand's specification, flexible minimum order quantities and branding such as engraving or logos.
For Glass & Lacquer Combination Wardrobes, the practical difference is that nothing arrives fixed. Our captured product records describe the configuration as made-to-measure sizing, material and finish options, and a layout tailored to the project — with dimensions and selected specifications confirmed for each project. That wording matters when you compare quotations: one supplier may be offering a standard box in two colourways, another a unit drawn to your opening.
Stage 1 — The brief and the opening
Send the room, not just a size. A useful enquiry includes:
- The wall elevation with finished floor level, ceiling height and the position of skirting, cornices, architraves and any bulkhead.
- Door swing direction and clearance in front of the unit — hinged doors need room to open, sliding doors do not but need track depth.
- Interior layout: hanging heights, drawer banks, shelves, lighting provisions and anything you want concealed behind closed panels.
- The finish decision for each surface: which panels are lacquered, which are glass, and which of those are visible from the bed side of the room.
Where a design team is still working, our interior design service covers space layout planning, concept design and mood boards, furniture layouts with 3D visual renderings, and project design coordination including drawings and production follow-up. That step usually removes most of the rework later.
Stage 2 — Locking down materials and finishes
This is where a combination unit either succeeds or becomes an argument on site. Lacquer and glass are specified separately, then reconciled.
| Element | What you decide | Why it needs deciding before production |
|---|---|---|
| Lacquer panels | Sheen level and colour reference for every visible panel | A high sheen surface reads as a highlight line under bedroom lighting; a matte surface shows less handling but behaves differently under the same lamp. Our Matte Lacquer Wardrobes and high sheen lacquer ranges cover both ends of that choice, so specify the reference rather than a colour name. |
| Glass panels | Tint and surface: clear, frosted, smoked or ribbed | Each one changes how much of the interior is legible. Frosted and smoked glass hide a busy interior; clear glass turns contents into decoration and raises the standard of internal joinery you will accept. |
| Glass frame | Framed or frameless, and metal colour where framed | The frame carries the glass and sets the shadow line against the lacquer. It is fixed at drawing stage, not on site. |
| Opening type | Hinged or sliding | A Glass Sliding Door Wardrobe saves the swing arc but consumes track depth and needs the opening dimension confirmed exactly. |
| Interior fit-out | Shelf spans, drawer banks, hanging zones, integrated lighting | Cut-outs for lighting and fixings are made in the factory. Cutting a lacquered panel on site is where most snag lists start. |
Stage 3 — Drawings, prototyping and approval
For a single villa this stage is drawing review. For an apartment or hotel repetition, ask for a prototype unit or at least a door sample set, because the same elevation installed in ten rooms multiplies any small mismatch between lacquer edge and glass rebate. Our custom and OEM process includes 3D modelling and prototyping before production runs, and it is the point where tolerances, hardware choice and the reveal between materials get signed off.
Confirm in writing at this stage: overall dimensions with a tolerance you both accept, the finish reference for each panel type, glass thickness and edge treatment, hardware make and opening mechanism, and how panels are packed. Anything agreed verbally here becomes a variation order later.
Stage 4 — Production, packing and shipping
Wardrobes travel as flat packs or as assembled carcasses with doors off, depending on size and site access. Our logistics service covers freight forwarding by sea, air and rail, commercial paperwork such as invoices, packing lists and certificates of origin, container loading, shipment tracking and door-to-door delivery to the site or your consolidator.
Two details save trouble on arrival: a crate marking system that matches your room-by-room schedule, so installers can find unit A in bedroom 3 without opening everything; and spare panel allowance for glass-fronted units, since a cracked glass panel found after the container is emptied takes far longer to replace than one reported at loading.
Stage 5 — Installation and handover
Glass and lacquer are the two surfaces that record poor handling, so the last stage is really a protection question. Installation covers on-site fitting, inspection and snagging, with spare parts and replacement support behind it. On site, keep the sequence boring: carcass levelled and fixed first, glass panels fitted last, protective film left on lacquered faces until painting and flooring are finished.
Five questions to put to any OEM wardrobe supplier
- Is this made to my drawings, or is it a standard model resized?
- Which specific lacquer reference and which glass tint are you quoting, and can I see them mounted together?
- Who confirms the opening dimensions — me, your site survey, or both against the same drawing revision?
- What is on the crate, and how do I match packages to rooms at delivery?
- What happens to a damaged glass panel, and how quickly can a replacement be produced and shipped?
If a supplier answers those five without hedging, you are buying an OEM product. If they cannot, you are buying stock with a longer lead time.
Send us the elevation
Share room dimensions, door type and finish references for your villa, apartment or hotel guest-room project, and we will quote a made-to-measure wardrobe package with confirmed specifications before production starts. Contact us to start.