A wardrobe quotation is only as good as the information behind it. Two rooms with the same floor area can produce very different prices once door type, internal fitout and finish details are settled. If you are requesting pricing on Smoked Veneer Wardrobes, the checklist below is what we ask for before a workable number can be issued.

Start with the room, not the product name

Smoked veneer wardrobes in our range are made to measure: sizing, layout and finish are specified per project rather than ordered from a fixed catalogue size. That means the starting point is the space itself. Send us the wall lengths and heights of each room where a wardrobe is required, taken on site rather than from an architectural plan alone, because finished floor levels, skirting, cornices and services change what can actually be built.

For every room, tell us whether the unit runs to the structural ceiling or stops below a bulkhead, and whether there is a cornice, architrave or light cove that the carcass has to return around. A single measurement taken at one height is not enough for a veneer front; note the high and low points of floor and ceiling so we can allow for out-of-level surfaces.

Door type and opening clearances

The door system drives both price and build sequence, so state it early. Our wardrobe range covers hinged, sliding, folding, open and walk-in configurations, and each has different spatial demands:

  • Hinged doors need clear swing space in front of the unit. Confirm that beds, vanities or traffic paths will not obstruct the opening.
  • Sliding doors save floor space but require track depth and a wall long enough for the panels to stack. Wooden Sliding Door Wardrobes show how veneer fronts read on a sliding system.
  • Folding doors suit narrower openings where a full swing is impossible.
  • Open and walk-in layouts remove doors entirely, which changes the hardware and panel edge detail rather than removing cost.

Where an existing unit is being replaced, include a photograph of the current wardrobe with the doors closed and open. It tells us more in one image than a written description about reveal depths and how the old unit was fixed.

Internal fitout: what goes inside

Quote accuracy depends on how the interior is organised. Rather than describing it in general terms, list the hanging requirements per bay:

  • Long-hang sections for coats and dresses, and short-hang sections at shirt height
  • Drawer count and drawer type — standard boxes, deep bottom drawers, or pull-out organisers
  • Shelving spacing, including shelf heights for folded stacks and bedding above the door line
  • Extras such as trouser slides, jewellery trays, ironing boards, lighting inside the carcass, or a mirror on an internal panel

If storage is the priority rather than appearance, say so plainly. A Drawer Focused Modular Wardrobe layout and a shelf-led layout price differently, and knowing which one you want stops us from guessing.

Finish, veneer direction and edge detail

Veneer is the part of the specification most often left vague, and it is where misunderstandings cost time. For a smoked veneer front we need to know:

  • The sheen level you expect — a matte surface and a high gloss surface are different specifications even on the same wood species.
  • The grain direction on doors and panels: vertical, horizontal or book-matched across adjacent leaves.
  • Whether edge banding and handle detail should match the face veneer or contrast with it. Handleless grooved fronts, integrated pulls and visible hardware each carry different costs.
  • Which surfaces are visible. A wardrobe between two rooms may need a finished return on both sides; a unit in a recess needs only the front finished.

Where other joinery in the same project uses veneer — Wood Veneer Panels on walls, or Walnut Veneer Wardrobes in another bedroom — send the reference. Matching species, cut and sheen across trades is far easier when the reference exists at quotation stage than when it has to be reverse-engineered later.

Quantities, schedule and site conditions

For a single dwelling, list each wardrobe by room with its dimensions and door type. For an apartment block, villa development or hotel fit-out, send the unit schedule as a spreadsheet: one row per wardrobe, with room, width, height, depth, door type and internal layout code. Quantities let us group production runs and give you a realistic delivery sequence instead of one undifferentiated date.

Also confirm the practical site factors that affect lead time and handling:

  • The required on-site date, working backwards from handover rather than from when you happen to enquire
  • Lift, stair or corridor access at the property, since full-height panels may need to be split into smaller sections
  • Whether installation is done by your own trades or coordinated through us, along with our installation and after-sales support
  • The delivery address and whether goods go direct to site or to a merchant's warehouse

What we confirm before the price is fixed

Once we have the above, we return drawings for each unit showing elevations, door splits and internal fitout, together with the finish reference you selected. You sign off the drawings; production follows. Dimensions and specifications are confirmed per project at that stage, so any change to a door type or an added drawer bank is priced as a revision rather than absorbed silently.

A quotation issued without drawings and a stated finish reference is not comparable between suppliers. Ask for the elevation drawing with every price you collect — it is the only reliable way to check that two quotes describe the same wardrobe.

Putting it together

A complete enquiry takes about an hour to assemble and removes most of the back-and-forth that delays orders: room dimensions with level and out-of-level notes, door type with clearance confirmation, internal fitout list, finish specification including sheen and grain direction, quantities and required dates, plus access and installation arrangements. Send that package and we can quote against a defined scope instead of an assumption.

Send your room dimensions, door preference and finish reference to request a quotation, and we will return unit drawings with pricing for review.