A media unit is one of the few pieces of joinery in a living room that has to do two jobs at once: keep the television and its equipment working, and keep everything else out of sight. The Santerson Open & Closed Combo Units is built around that split — open compartments for what you reach for daily, closed compartments for everything else. Because it is made to measure rather than picked off a shelf, the quality of the finished piece depends almost entirely on how precisely the specification is written before production starts. This guide sets out what to record, in what order, and which details are worth confirming in writing.
What this unit actually is
The Open & Closed Combo Units sits within our built-in furniture range, in the TV cabinets and media units collection. Alongside it sit freestanding TV cabinets, glass-front media units and integrated LED media units — all listed on the same product page family. The distinguishing feature of the combo unit is the mix: open shelving and display niches combined with doors, drawers or closed carcasses in a single run.
The published product description states that finish, layout and dimensions can be specified to suit each space, and that the storage configuration should be confirmed for each project. That wording matters. It means there is no single standard size, no fixed door arrangement and no default material list. Everything below is a decision you make, not something inherited from a catalogue line.
Why vague media-unit specifications go wrong
Most problems on site trace back to three omissions in the paperwork.
Cable routes left undecided. A television on a bracket needs a path for power and signal; a soundbar, console or set-top box needs the same. If nothing is drawn, the carcass arrives as a closed box and the installer drills on site — usually in the wrong place, sometimes into a shelf support.
Ventilation not addressed for enclosed equipment. Equipment housed inside a closed compartment generates heat. Where components sit behind a door, the specification needs to say how air reaches them and where that air exits.
Open shelving specified without deciding what goes on it. Open bays look good in a render and collect clutter in real life. If the bay depth, shelf span and shelf spacing are chosen without knowing whether they will hold books, glassware or a console, the result is either wasted space or shelves that sag.
None of these are manufacturing faults. They are specification faults, and each one costs far more to fix after production than to settle on paper beforehand.
Section 1: Dimensions and the wall they sit against
Record dimensions from the site, not from a drawing of the room as designed. Existing walls are rarely square, and skirting boards, architraves and floor finishes change the usable envelope.
| Item to record | Why it matters |
|---|---|
| Overall run width, height and depth | Sets the carcass size. Depth is driven by the deepest item stored, not by the television. |
| Television model, screen size and mounting method | A wall-bracketed screen needs a solid fixing zone; a stand-mounted screen needs shelf depth and load capacity. |
| Floor finish at the unit line | Carpet, tile and engineered wood flooring build up to different heights and affect plinth or toe-kick detail. |
| Position of sockets, switches and data points | Determines whether they are concealed, cut around or left exposed. |
| Ceiling condition | A floor-to-ceiling run meeting a cornice, cove or a ceiling panel system needs a defined head detail. |
| Adjacent openings | Door swings and radiator positions constrain where doors can open fully. |
Section 2: The open-to-closed ratio, decided room by room
The whole point of a combo unit is the balance between display and concealment. Set it by counting what has to live in the unit, then group those items.
What belongs in the open bays
- Items used daily without opening a door — remote controls, a console, a games system.
- Objects worth displaying, where dust and viewing angle have been accepted.
- Equipment that needs airflow or a remote signal to reach it.
What belongs behind doors
- Cables, spare media, board games, children's toys and anything you do not want photographed.
- Items sensitive to dust or to direct light.
- Storage that carries weight — a door-mounted shelf is more forgiving than an open span.
If the same wall also has to carry books or a collection, it is usually worth comparing the combo unit against a full-height storage wall or a mixed open-and-closed modular system in the same built-in furniture range, so that one run does the work of two pieces.
Section 3: Materials, finish and hardware
Our custom and OEM service covers bespoke finishes, textures and material choices including wood, metals, engineered stone and laminates. For a living-room media unit the practical decisions are narrower than they sound, but each one needs naming on the drawing.
- Carcass and door substrate — state the board type and thickness for each, not just the colour.
- Finish — matte lacquer, high gloss, veneer, laminate or textured panel. Name the specific sample reference and note the direction of any grain, particularly on a long horizontal run.
- Edge treatment — matched edge banding or a mitred edge. On dark and high-gloss finishes this is visible from a metre away if left unspecified.
- Door operation — handleless, knob, or push-to-open; hinge type and opening angle; whether doors are left- or right-hung.
- Drawers — runner type, load rating, full or partial extension, and whether the front is a drawer or a tip-up flap.
- Shelf spans — clear span and shelf thickness for each open bay, with fixed or adjustable shelves noted.
Where a project calls for a finish matched to kitchen cabinetry or wardrobes elsewhere in the building, request the same substrate and the same finish reference rather than assuming colour names transfer between product lines. Our custom furniture design and prototyping service exists for exactly this kind of matching.
Section 4: Lighting, cables and equipment
Integrated lighting is the detail most often left out of a media-unit specification until it is too late. Where open bays are to be lit, decide at specification stage whether you want an integrated LED media unit design or lighting added as a separate accessory. The two approaches produce different carcass details: concealed LED strip needs a channel, a driver location and a switching point.
Alongside lighting, write down:
- Which equipment sits in the unit, and whether each item is on display or behind a door.
- Where every cable enters and leaves the carcass, and the diameter of each required opening.
- Whether remote-control signals must reach equipment inside a closed compartment, and if so, what provision is made.
- Where the driver, transformer or amplifier is mounted and how it remains accessible for service.
- Electrical ratings and installation requirements for any lighting, confirmed against the selected cabinet design.
A practical rule: if an item needs a plug, a signal or a service visit, its position must appear on the drawing. Anything not drawn will be improvised on site.
Section 5: How the specification moves through production
SANTERSON works as a manufacturer and one-stop supplier for furniture and building materials, headquartered in China and operating since 2008. A specified unit follows the same route as the rest of an order, and each stage has a document attached to it.
| Stage | What you should have in hand |
|---|---|
| Design and planning | Site-measured dimensions, layout drawing, equipment list. Our interior design services cover space planning, furniture layouts and 3D renderings. |
| Detail confirmation | Signed-off drawing with finishes named by reference, hardware schedule, cable and lighting positions. |
| Production | One confirmed revision. Late changes after this point should be treated as variations, not corrections. |
| Logistics | Packing list keyed to the drawing so each component can be identified on arrival. Freight by sea, air and rail with door-to-door delivery is arranged through our logistics service. |
| Installation and handover | The specification doubles as the snag list. Installation and after-sales support is available, with inspection carried out against the agreed detail. |
For a villa or hospitality project where this unit is one item among many — cabinetry, wardrobes, doors, wall panelling, flooring, lighting — it is usually more efficient to place it inside a turnkey interior project. One coordinated drawing set keeps finishes consistent across rooms and puts a single party on the hook for the interface details between trades.
Pre-production checklist
- Dimensions taken on site, including floor finish, skirting and ceiling condition.
- Television model and mounting method confirmed.
- Open-to-closed ratio agreed, with each open bay assigned a use.
- Substrate, finish reference, edge treatment and grain direction recorded for carcass and doors.
- Hardware schedule complete: hinges, runners, handles or handleless detail, door hanging direction.
- Shelf spans, thickness and adjustability stated for every open bay.
- Equipment list with heat output and ventilation provision for enclosed items.
- Cable entry and exit positions drawn with diameters; driver location accessible.
- Lighting approach chosen — integrated LED design or accessory lighting — with electrical ratings confirmed.
- Fixings to wall identified for bracket-mounted screens and any tall, wall-fixed run.
- Drawing signed off before production release, with a note of the revision date.
Dimensions, materials, hardware, ventilation and electrical details for this configurable product are confirmed project by project. The figures and arrangements in this article are specification prompts, not standard values for the unit.
Send us your drawing and we will price it against your detail
Share the room dimensions, an equipment list and the finish you are working to, and our team will return a specification sheet for review before production. Enquiries reach us through the contact page.