A bidet is one of the smallest fixtures in a guest bathroom, and one of the easiest to get wrong. The bowl looks identical on either side of the rough-in, so the specification usually lands as a single line on a schedule with no dimensions, no drainage note and no matching WC reference. Below is the information list we ask buyers, designers and contractors to send when they are specifying the Floor Standing Bidet 1038F for a villa, apartment or hotel bathroom, together with what each item changes on our side of the order.

Why the input list matters more than the bowl shape

The 1038F is a freestanding ceramic bidet fixed to the wall at the back, with an ergonomic curved body and a glossy glaze that resists dirt and limescale. It is made to sit alongside the matching 1038 series water closet so the two read as one sanitary suite in home bathrooms, hotels and high-end villa renovations.

Because the unit stands on the floor and takes its support at the back wall, three things decide whether it fits: where the waste connection sits, how much clear floor space surrounds it, and whether the water supply points were laid out for a bidet in the first place. A project that confirms all three before production rarely needs a change order. A project that confirms none of them usually discovers the problem on site, when tiles are already laid.

Measurements to take before you enquire

Send these as a marked-up drawing or a dimensioned sketch rather than a list of numbers in an email body. A sketch shows us the relationships between items, which is what we actually need.

InputWhat to recordWhy we ask
Rough-in and waste typeWhether the bidet waste exits through the floor or the wall, and the centre distance from the finished wall face to the waste outlet.Determines how the back-to-wall connection is arranged and whether the trap configuration on site matches what the fixture expects.
Finished floor level and tile build-upThe completed floor height after screed, waterproofing and tile, not the structural slab.A freestanding unit set on a finished floor sits differently from one set before tiling; this affects both the waste connection and how the base meets the tiles.
Clear width beside the WCThe distance between the WC centreline and the nearest obstruction — vanity, wall, shower screen or door swing.Confirms the bidet can be positioned for comfortable use and that access panels and cleaning access remain possible.
Cold and hot supply positionsHeight and offset of each supply outlet, and whether valves are already fitted.Taps and supplies must land where the bowl can be plumbed without exposed pipework running across a finished wall.
Back wall constructionWhether the wall is masonry, stud with backing, or a finished panel system.The unit is fixed to the wall at the back; the fixing detail depends on what is behind the tile.
Room finish referencesTile, wall panel and hardware finishes in the bathroom, plus any colour or gloss requirement.Helps us confirm the glaze and matching pieces line up with the rest of the fit-out rather than clashing under site lighting.
Quantity and unit mixTotal bidet count, how many bathrooms repeat, and whether WCs from the same series are also being ordered.Sets the production batch and lets us keep the suite consistent across guest bathrooms instead of mixing series.
Exact outer dimensions, trap configuration and rough-in figures for the 1038F come from the technical sheet issued with your quotation. Please specify against that sheet rather than a dimension taken from a catalogue image or a rendered plan; we will confirm the current figures with you before production.

Project details that shape the quotation

Beyond the physical measurements, four project inputs change what we quote and how the order is packed:

  • Project type and repetition. A villa with three identical guest bathrooms and a hotel floor plate repeated across storeys are packaged differently. Repetition is where standardising the fixture schedule saves the most time on site.
  • Destination and delivery terms. Tell us the port or site address and whether you want door-to-door delivery or collection at origin. Freight, packaging and documentation differ between a container consolidating several fixture lines and a single-pallet sample order.
  • Sample before volume. Most buyers ordering ceramics for the first time ask for one unit to check glaze colour, weight and fit against their own tiling. Confirm early whether a sample is part of your process, because it changes the production sequence.
  • Who installs. Let us know if your own plumber is fitting the units or if installation support is needed from our side, so the handover documents match the party actually working on site.

Specifying the bidet as part of a suite

Ceramics rarely sell one at a time. Where a project takes the 1038F, it usually takes the matching water closet from the same series as well, so the bowl profiles, glaze and seat heights match across the bathroom. If your schedule also calls for a wall-hung WC in some bathrooms, that is a different drainage arrangement — wall waste rather than floor waste — and the two configurations should be listed separately on the fixture schedule instead of under one line item.

The same logic applies to the rest of the wet areas. Basins, WCs and bidets from one supplier simplify glaze matching, documentation and container loading, which is the main reason project buyers group their ceramics rather than sourcing each fixture separately. If you are coordinating a full fit-out, the one-stop furniture and building materials supplier service covers material selection and product specification alongside manufacturing, so the ceramic schedule is checked against the vanities, tapware positions and wall finishes rather than being read in isolation.

A simple checklist before you send an enquiry

  • Marked-up bathroom layout with waste type and rough-in distances.
  • Finished floor levels, not structural slabs.
  • Supply outlet positions for hot and cold.
  • Back wall construction type behind the tile.
  • Quantity, unit mix and whether matching 1038 series WCs are required.
  • Destination address, preferred delivery terms and sample requirement.

With those six items we can confirm fitment, produce a quotation with a defined fixture specification, and put the ceramics into the same production and shipping plan as the rest of your order. Send them over and we will come back with the current technical sheet for the 1038F before anything goes into production.

Send us your bathroom fixture schedule

Share the drawings, quantities and destination for your villa, apartment or hotel project. We supply ceramic suites through our interior fixtures range, as a one-stop furniture and building materials supplier for residential and hospitality projects.