A bronze stainless steel laser cut screen looks simple in a rendering and complicated on site. The difference usually comes down to what was agreed before production started. Below is the list of decisions our fabrication team needs from buyers, specifiers and procurement teams — with the practical reason each one matters.

Start With the Job the Screen Has to Do

Before pattern or finish, be clear about the function. A custom bronze stainless steel laser cut decorative screen partition is normally specified for one of three reasons: to divide a space while still letting light and sightlines pass through, to act as a feature wall behind a reception desk or bar, or to frame and partially conceal something — an elevator lobby, a staircase, service pipework, a seating booth.

Each job changes the build. A divider that people walk past needs a rigid frame and a stable base detail. A decorative backdrop can be lighter and is often fixed directly to a substrate. A screen that hides pipework may need access panels or removable sections. Tell us which job applies, and the panel layout follows from it.

Pattern: Open Area, Detail Size and Repeat

Send a drawing, a photograph, a mood-board reference or even just a description of the style you want. We cut to your design rather than pushing you toward a stock catalogue motif. Alongside the artwork, three pattern decisions need settling:

  • Open area ratio — how much of the panel is void versus solid. A high open ratio reads light and airy and throws more shadow across the floor; a low ratio gives more privacy and a heavier feel.
  • Smallest detail — very fine lines and small enclosed shapes are possible, but they affect cut time, handling during transport and how the finished edge looks up close. If your design has hairline elements, flag them early so we can confirm what cuts cleanly.
  • Repeat and alignment — decide whether the motif repeats across the whole installation as one continuous pattern or resets on each panel. Continuous patterns look better but require careful sequencing of panels on site.
Practical note: if you supply a vector file (AI, DXF, DWG or SVG), we work directly from it. If you only have a photo or a scan, we redraw the pattern and send it back for your approval before any metal is cut. That one approval step prevents most of the disputes we see in the industry.

Dimensions, Panel Count and How the Wall Is Reached

Panel size is not only a design choice — it is limited by what can be cut, finished, packed and passed through the building. When you send dimensions, include:

  • Total width and height of the opening or wall, plus the position of any columns, skirting, cornices, sockets or light fittings that interrupt it.
  • Whether the screen runs floor to soffit, floor to a suspended ceiling, or stops short — and whether the frame should sit proud of or recessed into the finishes.
  • The number of panels you want and where vertical joints may fall. If a continuous pattern is required, we set the joint positions to suit the motif rather than an even split.
  • Site access: lift dimensions, stair width, corridor turns and any restricted delivery hours. This determines the maximum single-piece size that can realistically reach the wall.

For wide feature walls we typically propose a multi-panel configuration with a shared frame line, so on-site alignment stays simple. Where a screen has to stand free rather than fix to a wall, the base and support detail must be agreed at quotation stage — it is far cheaper to design in than to retrofit.

Bronze Finish: What to Specify

"Bronze" covers several different looks, and a sample changes the conversation immediately. Our bronze stainless steel screens are commonly specified as an antique bronze surface — warm, slightly low-sheen, with depth that reads well under hospitality lighting. Related options we produce on the same laser-cut platform include brushed gold, matte black, and mirror gold with rose gold accents (see our custom gold mirror stainless steel screen with rose gold decorative accents).

Specify the finish in these terms:

DecisionWhat to confirm
Sheen levelMirror, brushed/satin or matte. Bronze in a high-sheen surface behaves like a mirror and reflects whatever is opposite it.
ToneWarm bronze against dark brown or gunmetal-leaning bronze. Colour chips and photographs are not reliable on their own — request a physical sample against your actual wall and lighting.
Direction of grainFor brushed finishes, state whether the brush runs vertically or horizontally across the panels.
CoatingWhether a protective coating is required for the location, especially where the screen sits in a high-touch area such as a reception handrail zone or near an entrance.

Interior and sheltered locations are the standard application for these screens — hotel lobbies, villas, clubs and luxury commercial interiors. If your screen is anywhere near an entrance, a pool deck or an outdoor covered area, say so at the outset; the material grade, coating and fixing detail all need to be reviewed for that exposure.

Material, Thickness and Structure

Stainless steel is the base material for this product family. The two numbers to lock down are sheet thickness and frame construction:

  • Sheet thickness — thin sheet cuts fine detail and keeps weight down, but large panels need enough gauge to stay flat and feel solid when touched. Panel size drives the sensible minimum thickness.
  • Frame and edge detail — a perimeter frame in matching finish stiffens the panel and hides cut edges. State whether you want the frame visible as a design line or minimal.
  • Fixing method — wall-fixed, ceiling-to-floor braced, or free-standing with a base. Send us the substrate you are fixing to (concrete, block, plasterboard, steel frame), because it determines the anchors and whether additional backing is needed.
Interface with your contractor: for floor-to-soffit screens in a commercial project, confirm who is responsible for the supporting structure and the final fixing — our team or your main contractor. We provide the fixing detail; your contractor prepares and certifies the substrate. Getting this split written into the order avoids a pause on site.

Related Options Worth Quoting Together

Screens rarely appear alone in a hospitality or villa package. Buyers often add matching items from the same decorative-profile family so finishes stay consistent across the project:

Decisions That Hold Up a Screen Order

  • Approved pattern artwork, with the open area ratio and smallest detail confirmed in writing.
  • Set-out drawing showing panel joints, dimensions and interface with floor, ceiling and adjacent finishes.
  • Signed physical finish sample, checked on site under the actual lighting.
  • Confirmed sheet thickness, frame type and fixing method for each location.
  • Agreed responsibility split for substrate preparation and final fixing.
  • Packing and access plan matched to lift, stair and delivery-hour constraints.

"Send us your drawing, photo or reference — we fabricate to exact dimensions." That is the whole process in one line. The buyers who get the result they expected are the ones who settle these six points early instead of discovering them during installation.

How a Custom Screen Fits a Larger Project Package

Buyers often group these partitions with the rest of the fit-out. As a one-stop furniture and building materials supplier, we produce them in our own factory alongside joinery, wall and ceiling finishes, lighting, flooring and loose furniture, so related items can sit on one order.

Our custom and OEM service covers bespoke sizing, material and finish selection, prototyping and private labelling. Freight is arranged through our furniture logistics and door-to-door delivery service, with the customs paperwork handled for you.

Working this way means one supplier coordinates the drawings, one production schedule covers the metalwork and joinery, and one set of shipment documents reaches your site. For villa and hotel projects, that single point of coordination is usually where the savings actually appear — not in the unit price of a single panel.

Send us your screen enquiry

Share the pattern reference, wall dimensions and location, and we will come back with a proposal covering panel layout, finish options and fabrication detail. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or send an enquiry through our contact page — enquiries receive a response within 24 hours.