An integrated basin looks simple on a drawing: one continuous surface, one bowl, no visible seam. That simplicity is exactly why it causes trouble on site. When the basin and countertop arrive as a single made-to-measure unit, every measurement has to be right before production starts, and the waste connections have to be set out before the joinery or wall finishes are fixed. A proper installation plan is what keeps the piece off the returns pallet.
Below is the checklist we work through with architects, builders and bathroom contractors on residential projects, arranged in the order the decisions actually have to be made.
1. Confirm the basin type before you confirm the vanity
Integrated basins are not interchangeable with the other two options in the same worktop budget. A Santerson Undermount Basin is dropped into a cut-out and bonded from underneath, so the cut-out can be re-cut on site if the setting-out moves. A vessel bowl sits on top of the finished surface and needs deck space around it. An integrated basin is machined as one piece with the counter, which means there is no second chance once the block or slab has been shaped.
Write down which one you are specifying, and record who signed off that choice. On a multi-unit job this single line in the specification prevents trades from arriving with the wrong carrier, tap holes and waste fitting.
2. Lock the dimensions while they can still be changed
Our Integrated Basin is made-to-measure: overall length and depth, bowl position, the width of the front lip, the thickness of the deck at the tap area and the height of the finished top are all set per project. Before production you should have a dimensioned drawing that shows:
- Finished top height from the completed floor level, not the structural slab — state which one you measured.
- Overall counter length and depth, plus the position of every return and any wall rebate.
- Bowl centre line measured from both side walls, so the bowl does not end up off-centre against a tiled reveal.
- Tap hole pattern and spout reach: single lever, wall-mounted or deck-mounted with two holes. Wall-mounted taps change who sets out the pipework and when.
- Overflow provision — whether the selected bowl has one, because that determines the waste body you order.
- Clearance for the drawer or door fronts below, so the bowl depth does not foul the runner travel.
Confirm these numbers against site dimensions on the day the survey happens, not from a drawing issued months earlier. Floor build-ups and wall plaster change finished levels more often than anyone admits.
3. Set out the waste and supply pipework to your drawing, not the other way round
With an integrated top the trap position is fixed by the bowl. So the soil pipe, trap and isolation valves have to be positioned from the approved drawing before the wall is closed up or the vanity carcass is fixed. The plan should show the trap centre in relation to the finished floor and finished wall face, and it should state whether the waste exits into the wall or the floor.
Two details are worth noting on paper at this stage: the fall available for the waste run once the cabinet is in place, and access to the trap if a future blockage needs clearing. If the design hides the pipework behind a sealed panel, say so in the plan and make sure an inspection route exists.
4. Specify the carrier structure and its load path
Stone, engineered stone and cast integrated tops are heavy, and the weight sits on the structure rather than being spread by a rim. The plan needs to name who supplies the supporting frame or carcass and where the bearing members run. For a Santerson Floating Vanity the wall fixing carries both the cabinet and the top, so the substrate, the fixing pattern and the maximum permitted span all belong in the documentation. A Santerson Double Vanity adds a second bowl, which usually means two waste runs and a wider unsupported span across the middle.
Include the timber or steel blocking behind tiled walls now as well. Mirror cabinets, tap backsplashes and wall-hung fittings get fixed into that blocking later, and retro-fitting it means opening a finished wall.
5. Record material, finish and edge details
Finish and material are selected per project, so the plan should carry a sample reference or approved swatch number rather than a colour name. A named shade is not a specification: two batches of the same descriptive colour can read differently under warm bathroom lighting. Record the deck thickness at the tap area, the edge profile on exposed sides, whether the splashback is integral or supplied separately, and which sealant colour is approved for the perimeter to tiled walls.
If the scheme carries through to other wet areas, match the worktop reference with your Santerson Stone & Marble Surfaces selection so the surfaces in the bathroom and elsewhere on the job read as one family rather than two similar ones.
6. Sequence the delivery, storage and site works
A made-to-measure top arrives once. The plan should place that date against the trades that depend on it: waterproofing complete and tested, wall set-outs final, floor finishes installed, first fix pipework pressure-tested, painting to the wet areas touched up after installation. Then state where the tops will be stored on arrival — upright, on padded A-frames, in a dry locked area. Most damage we hear about happens between the delivery bay and the bathroom door.
Build in time for the site check that production cannot do for you: hold the top against the actual opening, check the bowl lines up with the waste, and confirm the taps seat correctly before any adhesive goes on.
7. Name the responsibilities and the sign-off
The single most useful line in the plan is a table saying who does what. Without it, an out-of-square wall becomes a dispute instead of a fix.
| Item | Normally the supplier's scope | Normally the local contractor's scope |
|---|---|---|
| Made-to-measure top and basin | Fabrication to approved dimensions, finish, edge profile | Verify site dimensions before release for production |
| Pipework and waste | Advise trap position and waste type from the approved drawing | Set out, install and pressure-test supply and waste |
| Support structure | State weight and bearing requirements | Build or fix the carcass, frame and blocking |
| Sealing and finishing | Supply approved sealant reference if included | Apply sealant, complete tile and paint touch-up |
| Handover | Packing list, care and cleaning instructions | Snag list, sign-off, warranty registration |
Our own service path runs from consultation and design through production, door-to-door logistics and then installation with after-sales support, so the same drawings that drive fabrication can also drive the site handover. Confirm the exact scope for your project in writing before order release — what is included varies by configuration.
8. Close out with a snag list that matches the drawing
At handover, check the installed piece against the approved drawing rather than against memory: level across the full length, front edge parallel to the finished wall, bowl centred on its line, taps seated with no movement, waste running clear with no standing water in the bowl, sealant continuous at the wall junction, and no chips on the under-rim where the carrier contacts the top. Photograph the completed installation and file it with the approved shop drawing. That record is what settles any later conversation about what was supplied.
A practical rule: an integrated basin should be released for production only after the finished floor level, finished wall faces and waste position are all frozen. If any of those three is still open on site, specify an undermount basin instead and keep the flexibility.
Send us your bathroom layout
If you are specifying integrated tops for a villa or residential fit-out, send the room drawing with the finished levels marked and the tap arrangement you prefer. We will return dimensioned shop drawings for approval before production starts, along with the carrier requirements your carpenter or tiler needs on site.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Browse the wider bathroom range under Interior Fixtures.
Dimensions, materials, sealants, load requirements and installation methods must be confirmed for each project configuration and checked against local building regulations by the responsible site professional.